rr"Z1S. instr~LIUI It-ai dLU-1 3.31.1 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY SR 3.3.1.18 NOTE---
Verification of setpoint is not required.
Perform TADOT.
Prior to exceeding the P-8 interlock whenever the unit has been in MODE 3, if not performed within the previous 31 days SR 3.3.1.19 NOTE Neutron detectors are excluded from response time testing.
Verify RTS RESPONSE TIME is within limits.
24 months on a STAGGERED TEST BASIS Cook Nuclear Plant Unit I 3.3.1-10 Amendment No. 2-8-7-,
301
RTS Instrumentation 3.3.1 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY SR 3.3.1.18
-.-- NOTE -----
Verification of setpoint is not required.
Perform TADOT.
Prior to exceeding the P-8 interlock whenever the unit has been in MODE 3, if not performed within the previous 31 days I
-4 SR 3.3 1.19 Neutron detectors are excluded from response time testing.
Verify RTS RESPONSE TIME is within limits.
24 months on a STAGGERED TEST BASIS Cook Nuclear Plant Unit 2 3.3.1-10 Amendment No. 2-6-,