December 2001 Monthly Operating Report for Browns Ferry Nuclear Plant
ML020350283
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 01/14/2002
From: Abney T
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML020350283 (8)


Text

Tennessee Valley Authority, Post Office Box 2000, Decatur, Alabama 35609-2000 January 14, 2002 U.S. Nuclear Regulatory Commission ATTN:

Document Control Desk Mail Stop WFN, P1-35 Washington, D.C.

20555-0001 Gentlemen:

In the Matter of Tennessee Valley Authority Docket Nos.

50-259 50-260 50-296 BROWNS FERRY NUCLEAR PLANT (BFN)

DECEMBER 2001 MONTHLY OPERATING REPORT The enclosure provides the December 2001 Monthly Operating Report (MOR) as required by BFN Technical Specifications Section 5.6.4.

Only one paper copy of this document is being sent to the NRC Document Control Desk.

If you have any questions concerning this report, please call me at (256) 729-2636.

M er of Licen ing cc:

See page 2 Printed on recycled paper

) )

U.S. Nuclear Regulatory Commission Page 2 January 14, 2002 Enclosure cc (Enclosure):

(Via NRC Electronic Distribution)

Mr. Allen G. Hansen, Senior Project Manager U.S. Nuclear Regulatory Commission One White Flint, North (MS 08G9)

Office of Nuclear Reactor Regulation 11555 Rockville Pike Rockville, Maryland 20852-2738 NRC Resident Inspector Browns Ferry Nuclear Plant P.O.

Box 149 Athens, Alabama 35611 Regional Administrator U.S.

Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, S.W.,

Suite 23T85 Atlanta, Georgia 30303-8931

ENCLOSURE 1 TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)

MONTHLY OPERATING REPORT DECEMBER 2001 UNIT 1 DOCKET NUMBER 50-259 LICENSE NUMBER DPR-33 UNIT 2 DOCKET NUMBER 50-260 LICENSE NUMBER DPR-52 UNIT 3 DOCKET NUMBER 50-296 LICENSE NUMBER DPR-68

Docket No.

50-259 Unit Name BFN Unit 1 Date January 7, 2002 Completed By J. E. Wallace Telephone (256) 729-7874 Reporting Period December 2001

1. Design Electrical Rating (Net MWe):
2.

Maximum Dependable Capacity (MWe-Net)

Yr-to-Date Cumulative*

3.

Number of Hours Reactor was Critical

4.

Hours Generator On-Line

5.

Unit Reserve Shutdown Hours

6.

Net Electrical Energy Generated (MWh) 0 0

59521 0

0 58267 0

0 0

0 0

53,796,427

  • Excludes hours under Administration Hold (June 1, 1985 to Present)

OPERATING DATA REPORT Docket No.

50-260 Unit Name BFN Unit 2 Date January 7, 2002 Completed By J. E. Wallace Telephone (256) 729-7874 Reporting Period December 2001

1. Design Electrical Rating (Net MWe):
2.

Maximum Dependable Capacity (MWe-Net) 1120 1118 Yr-to-Date Cumulative

3.

Number of Hours Reactor was Critical

4.

Hours Generator On-Line

5.

Unit Reserve Shutdown Hours

6.

Net Electrical Energy Generated (MWh) 660 7,799 140,109 642.5 7,637 137,493 0

0 0

659,368 8,414,558 136,241,465 E-2 OPERATING DATA REPORT 1065 0

Month Month

Docket No.

50-296 Unit Name BFN Unit 3 Date January 7, 2002 Completed By J. E. Wallace Telephone (256) 729-7874 Reporting Period December 2001

1. Design Electrical Rating (Net MWe):
2.

Maximum Dependable Capacity (MWe-Net)

Yr-to-Date Cumulative

3.

Number of Hours Reactor was Critical

4.

Hours Generator On-Line

5.

Unit Reserve Shutdown Hours

6.

Net Electrical Energy Generated (MWh) 744 8,760 96,830 744 8,760 95,416 0

0 0

839,890 9,803,357 96,722,792 E-3 OPERATING DATA REPORT 1120 1118 Month

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH: DECEMBER 2001 DOCKET NO:

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

50-259 BFN-1 January 7, 2002 J. E. Wallace (256) 729-7874 2Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training and License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain) 3Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation of Existing Outage 5-Reduction 9-Other

'Instructions for Preparation of Data Entry sheets for Licensee Event Report (LER)

(NUREG - 1022)

SUMMARY

Unit 1 has been on administrative hold since June 1, 1985.

E-4 No.

Date Type' Duration Reason' Method of Licensee System Component Cause and Corrective Action to Prevent (Hours)

Shutting Event Report Code' Code' Recurrence Down No.

Reactor' 1

06/01/85 S

744 F

4 N/A N/A N/A Administrative hold to resolve various TVA and NRC concerns.

'F: Forced S: Scheduled

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH: DECEMBER 2001 DOCKET NO:

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

50-260 BFN-2 JANUARY 7,2002 J. E. Wallace (256) 729-7874

'Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training and License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain) 3Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation of Existing Outage 5-Reduction 9-Other Instructions for Preparation of Data Entry sheets for Licensee Event Report (LER)

(NUREG - 1022)

SUbMARY:

Unit 2 has operated near 100 percent power with the exception of the noted significant events E-5 No.

Date Type Duration(

Reason 2 Method of Licensee System Component Cause and Corrective Action to Prevent Hours)

Shutting Event Report Code4 Code4 Recurrence Down No.

Reactor3 3

12/5/01 S

101.5 B

2 N/A N/A N/A At 0000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br />, Unit 2 began to reduce power for repair of leaks in the drywell.

At 0400 hours0.00463 days <br />0.111 hours <br />6.613757e-4 weeks <br />1.522e-4 months <br />, the plant was manually scrammed from 37 percent power level.

On December 8, at 1129 hours0.0131 days <br />0.314 hours <br />0.00187 weeks <br />4.295845e-4 months <br />, control rods were pulled for reactor criticality.

On December 9, at 0930 hours0.0108 days <br />0.258 hours <br />0.00154 weeks <br />3.53865e-4 months <br />, the plant was loaded to the grid. On December l0,at 0300 hours0.00347 days <br />0.0833 hours <br />4.960317e-4 weeks <br />1.1415e-4 months <br /> the plant was at 100 percent power.

4 12/15/01 S

0 B

5 N/A N/A N/A Load dispatcher requested power reduction due to system demand.

5 12/27/01 S

0 B

5 N/A N/A N/A At 1331 hours0.0154 days <br />0.37 hours <br />0.0022 weeks <br />5.064455e-4 months <br /> plant power was reduced to 65 percent for additional power suppression testing.

On December 30, at 0345 testing was completed and power ascension began.

On December 31, at 1630 hours0.0189 days <br />0.453 hours <br />0.0027 weeks <br />6.20215e-4 months <br />, reactor power was at 100 percent.

'F: Forced S: Scheduled

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH: DECEMBER 2001 DOCKET NO:

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

50-296 BFN-3 JANUARY 7, 2002 J. E. Wallace (256) 729-7874 "Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training and License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain) 3Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation of Existing Outage 5-Reduction 9-Other Instructions for Preparation of Data Entry sheets for Licensee Event Report (LER)

(NUREG - 1022)

SUMMARY

Unit 3 has operated near 100 percent power without any significant events.

E-6 No.

Date Type' Duration Reason2 Method of Licensee System Component Cause and Corrective Action to Prevent (Hours)

Shutting Event Report Code 4 Code' Recurrence Down No.

Reactor' N/A

'F: Forced S: Scheduled