Tennessee Valley Authority, Post Office Box 2000, Decatur, Alabama 35609-2000 May 9, 2003 U.S. Nuclear Regulatory Commission ATTN:

Document Control Desk Mail Stop:

OWFN, P1-35 Washington, D.C. 20555-0001 Gentlemen:

In the Matter of

)

Docket Nos.

50-259 Tennessee Valley Authority

)

50-260 50-296 BROWNS FERRY NUCLEAR PLANT (BFN)

- MY 2003 MONTHLY OPERATING REPORT The enclosure provides the May 2003 Monthly Operating Report (MOR) as required by BFN Technical Specifications, Section 5.6.4.

If you have any questions concerning this report, please call me at (256) 729-2636.

T. E.

ne Manager of s

and ustry Affa rs End sure cc:

e page 2 I6:;1' PRed n cyd

U.S. Nuclear Regulatory Commission Page 2 May 9 2003 Enclosure cc (Enclosure):

(Via NRC Electronic Distribution)

Mr. Kahtan N. Jabbour, Senior Project Manager U.S. Nuclear Regulatory Commission One White Flint, North (MS 08G9)

Office of Nuclear Reactor Regulation 11555 Rockville Pike Rockville, Maryland 20852-2738 NRC Resident Inspector Browns Ferry Nuclear Plant 10833 Shaw Road Athens, Alabama 35611-6970 Regional Administrator U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, S.W., Suite 23T85 Atlanta, Georgia 30303-8931

ENCLOSURE TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)

MONTHLY OPERATING REPORT MAY 2003 UNIT 1 DOCKET NUMBER 50-259 LICENSE NUMBER DPR-33 UNIT 2 DOCKET NUMBER 50-260 LICENSE NUMBER DPR-52 UNIT 3 DOCKET NUMBER 50-296 LICENSE NUMBER DPR-68

OPERATING DATA REPORT Docket No.

50-259 Unit Name BFN Unit 1 Date June 4, 2003 Completed By J. E. Wallace Telephone (256) 729-7874 Reporting Period May 2003

1. Design Electrical Rating (Net MWe):
2.

Maximum Dependable Capacity (MWe-Net)

Yr-to-Date Cumulative*

3.

Number of Hours Reactor was Critical

4.

Hours Generator On-Line

5.

Unit Reserve Shutdown Hours

6.

Net Electrical Energy Generated (MWh) 0 0

59521 0

o 58267 o

0 0

0 0

53,796,427

  • Excludes hours under Administration Hold (June 1, 1985 to Present)

OPERATING DATA REPORT Docket No.

50-260 Unit Name BFN Unit 2 Date June 4, 2003 Completed By J. E. Wallace Telephone (256) 729-7874 Reporting Period May 2003

1. Design Electrical Rating (Net MWe):
2.

Maximum Dependable Capacity (MWe-Net) 1120 1118

3.

Number of Hours Reactor was Critical

4.

Hours Generator On-Line

5.

Unit Reserve Shutdown Hours

6.

Net Electrical Energy Generated (MWh)

Month Yr-to-Date Cumulative 744 3037 151,444 744 3009 148,771 0

0 0

843,446 2,951,550 148,104,276 E-2 1065 0

Month

OPERATING DATA REPORT Docket No.

50-296 Unit Name BFN Unit 3 Date June 4, 2003 Completed By J. E. Wallace Telephone (256) 729-7874 Reporting Period May 2003

1. Design Electrical Rating (Net MWe):
2.

Maximum Dependable Capacity (MWe-Net)

Yr-to-Date Cumulative

3.

Number of Hours Reactor was Critical

4.

Hours Generator On-Line

5.

Unit Reserve Shutdown Hours

6.

Net Electrical Energy Generated (MWh) 744 3623 108,871 744 3623 107,447 0

0 0

836,531 4,001,177 109,984,048 E-3 1120 1118 Month

UNIT SHUTDOWNS REPORT MONTH: MAY 2003 DOCKET NO:

UNIT NAME:

DATE:

COMPLETED BY:

50-259 BFN-1 June 4, 2003 J. E. Wallace M44 7O 7Q7A

___________________ I I

I

'Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training / License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain) 2 Method l-Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-Continuation Outage 5-Other (Explain)

SUMMARY

Unit 1 has been on administrative hold since June 1, 1985.

E-4

UNIT SHUTDOWNS REPORT MONTH: MAY 2003 DOCKET NO:

UNIT NAME:

DATE:

COMPLETED BY:

T1 F.PJ4n1V-50-260 BFN-2 June 4, 2003 J. E. Wallace (256) 729-7874

'Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training / License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain) 2 Method 1-Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-Continuation Outage 5-Other (Explain)

SUNMVARY:

Unit 2 has operated at or near 100 percent available power.

E-5

UNIT SHUTDOWNS REPORT MONTH: MAY 2003 DOCKET NO:

UNIT NAME:

DATE:

COMPLETED BY:

'r.

VVUn?rwj.

50-296 BFN-3 June 4, 2003 J. E. Wallace (2;A '72O7R7A 1Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training / License Examination F-Administative G-Operational Error (Explain)

H-Other (Explain) 2Method 1-Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-Continuation Outage 5-Other (Explain)

SU1MMARY:

Unit 3 has operated at or near 100 percent available power.

E-6