Tennessee Valley Authonty, Post Office Box 2000, Decatur, Alabama 35609-2000 March 14, 2003 U.S.
Nuclear Regulatory Commission ATTN:
Document Control Desk Mail Stop:
- OWFN, Pl-35 Washington, D.C. 20555-0001 Gentlemen:
In the Matter of
)
Docket Nos.
50-259 Tennessee Valley Authority
)
50-260 50-296 BROWNS FERRY NUCLEAR PLANT (BFN)
FEBRUARY 2003 MONTHLY OPERATING REPORT The enclosure provides the February 2003 Monthly Operating Report (MOR) as required by BFN Technical Specifications, Section 5.6.4.
If you have any questions concerning this report, please call me at (256) 729-2636.
Si cerel T. E.
ey Manager o icenjsng and dustry Af airs Enclos re cc:
Se page 2 Pnnted on recycled paper
U.S. Nuclear Regulatory Commission Page 2 March 14, 2003 Enclosure cc (Enclosure):
(Via NRC Electronic Distribution)
Mr. Kahtan N.
Jabbour, Senior Project Manager U.S. Nuclear Regulatory Commission One White Flint, North (MS 08G9)
Office of Nuclear Reactor Regulation 11555 Rockville Pike Rockville, Maryland 20852-2738 NRC Resident Inspector Browns Ferry Nuclear Plant 10833 Shaw Road Athens, Alabama 35611-6970 Regional Administrator U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, S.W.,
Suite 23T85 Atlanta, Georgia 30303-8931 I
ENCLOSURE TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)
MONTHLY OPERATING REPORT FEBRUARY 2003 UNIT 1 DOCKET NUMBER 50-259 LICENSE NUMBER DPR-33 UNIT 2 DOCKET NUMBER 50-260 LICENSE NUMBER DPR-52 UNIT 3 DOCKET NUMBER 50-296 LICENSE NUMBER DPR-68
OPERATING DATA REPORT Docket No.
50-259 Unit Name BFN Unit 1 Date March 6, 2003 Completed By J. E. Wallace Telephone (256) 729-7874 Reporting Period February 2003
- 1. Design Electrical Rating (Net MWe):
- 2.
Maximum Dependable Capacity (MWe-Net)
- 3.
Number of Hours Reactor was Critical
- 4.
Hours Generator On-Line
- 5.
Unit Reserve Shutdown Hours
- 6.
Net Electrical Energy Generated (MWh)
Month Yr-to-Date Cumulative*
0 0
59521 0
0 58267 0
0 0
0 0
53,796,427
- Excludes hours under Administration Hold (June 1, 1985 to Present)
OPERATING DATA REPORT Docket No.
50-260 Unit Name BFN Unit 2 Date March 6, 2003 Completed By J. E. Wallace Telephone (256) 729-7874 Reporting Period February 2003
- 1. Design Electrical Rating (Net MWe):
- 2.
Maximum Dependable Capacity (MWe-Net) 1120 1118
- 3.
Number of Hours Reactor was Critical
- 4.
Hours Generator On-Line
- 5.
Unit Reserve Shutdown Hours
- 6.
Net Electrical Energy Generated (MWh)
Month Yr-to-Date Cumulative 561 1305 149,712 561 1305 147,066 0
0 0
450,704 1,138,422 146,291,148 E-2 1065 0
OPERATING DATA REPORT Docket No.
50-296 Unit Name BFN Unit 3 Date March 6, 2003 Completed By J. E. Wallace Telephone (256) 729-7874 Reporting Period February 2003
- 1. Design Electrical Rating (Net MWe):
1120
- 2.
Maximum Dependable Capacity (MWe-Net) 1118
- 3.
Number of Hours Reactor was Critical
- 4.
Hours Generator On-Line
- 5.
Unit Reserve Shutdown Hours
- 6.
Net Electrical Energy Generated (MWh)
Month Yr-to-Date Cumulative 672 1416 106,664 672 1416 105,240 0
0 0
678,123 1,523,388 107,506,259 E-3
UNIT SHUTDOWNS REPORT MONTH: FEBRUARY 2003 Type1-.!.............
DUrt63)
- ReasonZ, f ______
S 672 F
4 N/A N/A N/A DOCKET NO:
UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
50-259 BFN-1 March 6, 2003 J. E. Wallace (256) 729-7874 Cause :and Co-iri ivieAction to Prevent Recurrence
-t Administrative hold to resolve various TVA and NRC concerns.
I I
I I
_____________________.1 ____________ J
'F: Forced S: Scheduled
' Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training and License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain) aMethod SMethod 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation of Existing Outage 5-Reduction 9-Other 4Instructions for Preparation of Data Entry sheets for Licensee Event Report (LER)
(NUREG - 1022)
SUMMARY
Unit 1 has been on administrative hold since June 1, 1985.
E-4 N o.i iiii,~iii:
I Date 06/01/85 I..........
.. 1.
1 I
I
UNIT SHUTDOWNS REPORT MONTH: FEBRUARY 2003 1
02/24
'F: Forced I
I I
I I
I ______________________________
I __________________
I SF: Forced S: Scheduled
SUMMARY
-Method"df%.o Shuting Dow Report No.,
t 1
e-Sls:'i......
Systemiii DOCKET NO:
UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
Component
.Co...de...
S......
2 N/A N/A N/A 50-260 BFN-2 March 6, 2003 J. E. Wallace (256) 729-7874 On February 24, 2003, at 0900 hours0.0104 days <br />0.25 hours <br />0.00149 weeks <br />3.4245e-4 months <br />, Unit 2 began its Cycle 12 refueling outage. The plant remained in an outage status through the remainder of February 2003.
'Reason:
'Method
- Instructions for Preparation of A-Equipment Failure (Explain) 1-Manual Data Entry sheets for Licensee B-Maintenance or Test 2-Manual Scram Event Report (LER)
C-Refueling 3-Automatic Scram (NUREG - 1022)
D-Regulatory Restriction 4-Continuation of Existing E-Operator Training and License Outage Examination 5-Reduction F-Administrative 9-Other G-Operational Error (Explain)
H-Other (Explain)
Unit 2 has operated without any significant events and began its refueling outage on February 24, 2003.
E-5
) I
UNIT SHUTDOWNS REPORT MONTH: FEBRUARY 2003 DOCKET NO:
UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
50-296 BFN-3 March 6, 2003 J. E. Wallace (256) 729-7874 1
...T I
.... D.ate...Type'iii iDUriationi Reason:hi... "Method of.
-I f
t t
1 T
N/A Licensee":"
"E tn R or t,
-X.a c
i:i:iii::ii:::i:..
S-6 System Component "Cads andC.
Code 4
~
I Rurrene..
1 1
.1 1 _____
1 _______
.1 ________
.1 _____
1 _______
I ________________________
2 Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training and License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain) 3 Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation of Existing Outage 5-Reduction 9-Other 4 Instructions for Preparation of Data Entry sheets for Licensee Event Report (LER)
(NUREG - 1022)
SUNMARY:
Unit 3 has operated at or near 100 percent available power except to make minor repairs.
E-6
'S F: Forced S: Scheduled I..."..ý
-'*if,
I I I