Category:Letter
MONTHYEARCNL-24-060, Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description2024-09-24024 September 2024 Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description ML24262A1502024-09-24024 September 2024 Requalification Program Inspection - Browns Ferry Nuclear Plant ML24262A0602024-09-23023 September 2024 Summary of August 19, 2024, Meeting with Tennessee Valley Authority Regarding a Proposed Supplement to the Tennessee Valley Authority Nuclear Quality Assurance Plan ML24263A2952024-09-19019 September 2024 Site Emergency Plan Implementing Procedure Revision CNL-24-065, Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-09-18018 September 2024 Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000260/20240902024-09-17017 September 2024 NRC Inspection Report 05000260/2024090 and Preliminary White Finding and Apparent Violation - 1 CNL-24-062, Cycle 16 Reload Analysis Report2024-09-16016 September 2024 Cycle 16 Reload Analysis Report ML24255A8862024-09-10010 September 2024 Core Operating Limits Report for Cycle 16 Operation, Revision 0 ML24239A3332024-09-0303 September 2024 Full Audit Plan IR 05000259/20244042024-09-0303 September 2024 Cyber Security Inspection Report 05000259/2024404 and 05000260-2024404 and 05000296/2024404-Cover Letter IR 05000259/20240052024-08-26026 August 2024 Updated Inspection Plan for Browns Ferry Nuclear Plant, Units 1, 2 and 3 - Report 05000259/2024005, 05000260/2024005 and 05000296/2024005 ML24225A1682024-08-16016 August 2024 – Notification of Inspection and Request IR 05000259/20244022024-08-0606 August 2024 Security Baseline Inspection Report 05000259/2024402 and 05000260/2024402 and 05000296/2024402 ML24219A0272024-08-0606 August 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000259/20240022024-08-0202 August 2024 Brown Ferry Nuclear Plant – Integrated Inspection Report05000259/2024002 and 05000260/2024002 and 05000296/2024002 ML24199A0012024-07-22022 July 2024 Clarification and Correction to Exemption from Requirement of 10 CFR 37.11(c)(2) ML24172A1342024-07-15015 July 2024 Exemptions from 10 CFR 37.11(C)(2) (EPID L-2023-LLE-0024) - Letter ML24183A4142024-07-10010 July 2024 – License Renewal Regulatory Limited Scope Audit Regarding the Environmental Review of the License Renewal Application (EPID Number: L-2024-SLE-0000) (Docket Numbers: 50-259, 50-260, and 50-296) ML24190A1292024-07-0808 July 2024 Main Steam Relief Valves Lift Settings Outside of Technical Specifications Required Setpoints ML24185A1512024-07-0303 July 2024 Inoperability of Unit 3 Diesel Generator Due to Relay Failure ML24184A1142024-07-0202 July 2024 Site Emergency Plan Implementing Procedure Revision ML24183A3842024-07-0101 July 2024 Registration of Use of Cask to Store Spent Fuel (MPC-364, -365) ML24179A0282024-06-26026 June 2024 Evaluation of Effects of Out-of-Limits Condition as Described in IWB-3720(a) ML24176A1022024-06-24024 June 2024 Reactor Scram Due to Generator Step-Up Transformer Failure ML24176A1132024-06-23023 June 2024 American Society of Mechanical Engineers, Section XI, Fourth 10 Year Inspection Interval, Inservice Inspection, System Pressure Test, Containment Inspection, and Repair and Replacement Programs, Owner’S Activity Report Cycle 21 Oper ML24175A0042024-06-23023 June 2024 Interim Report of a Deviation or Failure to Comply Associated with a Valve in the Unit 3 High Pressure Coolant Injection System ML24089A1152024-06-21021 June 2024 Transmittal Letter, Environmental Assessments and Findings of No Significant Impact Related to Exemption Requests from 10 CFR 37.11(c)(2) ML24155A0042024-06-18018 June 2024 Proposed Alternative to the Requirements of the ASME Code (Revised Alternative Request 0-ISI-47) ML24158A5312024-06-0606 June 2024 Registration of Use of Cask to Store Spent Fuel (MPC-361, -362, -363) ML24071A0292024-06-0505 June 2024 Subsequent License Renewal Application Enclosure 3 - Proprietary Determination Letter ML24068A2612024-06-0505 June 2024 SLRA Fluence Methodology Report - Proprietary Determination Letter IR 05000259/20244032024-05-22022 May 2024 – Security Baseline Report 05000259/2024403 and 05000260/2024403 and 05000296/2024403 ML24141A2462024-05-20020 May 2024 High Pressure Coolant Injection Inoperable Due to Rupture Disc Failure and Resulting System Isolation ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24136A0702024-05-15015 May 2024 2023 Annual Radiological Environmental Operating Report IR 05000259/20240012024-05-14014 May 2024 Integrated Inspection Report 05000259/2024001, 05000260/2024001, and 05000296/2024001 CNL-24-040, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-05-0808 May 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24123A2012024-05-0202 May 2024 NRC Cybersecurity Baseline Inspection (NRC Inspection Report 05000259/2024404, 05000260-2024404, 05000296/2024404) and Request for Information ML24122A6852024-05-0101 May 2024 2023 Annual Radioactive Effluent Release Report and Offsite Dose Calculation Manual CNL-24-036, – 10 CFR 50.46 Annual Report2024-04-25025 April 2024 – 10 CFR 50.46 Annual Report ML24116A2522024-04-25025 April 2024 Site Emergency Plan Implementing Procedure Revision ML24115A1652024-04-24024 April 2024 Breaker Trip Automatically Started an Emergency Diesel Generator CNL-24-037, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 422024-04-22022 April 2024 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 42 05000296/LER-2024-001, Primary Containment Isolation Valve Inoperable Due to Incorrect Motor Operated Valve Setup2024-04-22022 April 2024 Primary Containment Isolation Valve Inoperable Due to Incorrect Motor Operated Valve Setup ML24087A2302024-04-18018 April 2024 Exemption from Select Requirements of 10 CFR Part 73, Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting ML24108A1832024-04-17017 April 2024 Secondary Containment Isolation Valve Inoperable Due to Mechanical Failure CNL-24-033, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-04-17017 April 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-24-024, Hydrologic Engineering Center River Analysis System Project Milestone Status Update2024-04-17017 April 2024 Hydrologic Engineering Center River Analysis System Project Milestone Status Update ML24106A2632024-04-16016 April 2024 Ltr to State Recognized Tribes-Hamilton, Cher-O-Creek Intra Tribal Indians ML24106A2572024-04-16016 April 2024 Ltr to Federally Recognized Tribes-Yahola, Kialegee Tribal Town 2024-09-03
[Table view] Category:License-Monthly Operating Report
MONTHYEARML0507401992005-03-14014 March 2005 February 2005 Monthly Operating Report for Browns Ferry Nuclear Plant, Units 1, 2 and 3 ML0504602702005-02-15015 February 2005 January 2005 Monthly Operating Report for Browns Ferry Nuclear Plant (BFN) Units 1, 2, and 3 ML0501104352005-01-11011 January 2005 December 2004 Monthly Operating Report for Browns Ferry Nuclear Plant ML0434900952004-12-14014 December 2004 November 2004 Monthly Operating Report for Browns Ferry Units 1 2 and 3 ML0432102242004-11-15015 November 2004 October 2004 Monthly Operating Report for Browns Ferry Nuclear Plant, Units 1, 2 and 3 ML0428704642004-10-13013 October 2004 September 2004 Monthly Operating Report for Browns Ferry Nuclear Plant ML0425801122004-09-13013 September 2004 August 2004 Monthly Operating Report for Browns Ferry Nuclear Plant ML0422604152004-08-13013 August 2004 July 2004 Monthly Operating Report for Browns Ferry, Units 1, 2 and 3 ML0419706562004-07-15015 July 2004 June 2004 Monthly Operating Report for Browns Ferry, Units 1, 2 and 3 ML0416102342004-06-0909 June 2004 May 2004 Monthly Operating Report for Browns Ferry, Units 1, 2 and 3 ML0413405812004-05-13013 May 2004 April 2004 Monthly Operating Report for Browns Ferry ML0411203772004-04-14014 April 2004 March 2004 Monthly Operating Report for Browns Ferry Units 1 2 & 3 ML0407205372004-03-11011 March 2004 February 2004 Monthly Operating Report for Browns Ferry, Units 1, 2, and 3 ML0403402352004-01-12012 January 2004 December 2003 Monthly Operating Report for Browns Ferry, Units 1, 2, and 3 ML0401303542004-01-12012 January 2004 December 2003 Monthly Operating Report for Browns Ferry ML0331804652003-11-14014 November 2003 October 2003 Monthly Operating Report for Browns Ferry Nuclear Plant, Units 1, 2 & 3 ML0329009752003-10-10010 October 2003 September 2003 Monthly Operating Report for Browns Ferry, Units 1, 2 and 3 ML0325502132003-09-10010 September 2003 August 2003 Monthly Operating Report for Browns Ferry, Units 1, 2 & 3 ML0323900252003-08-11011 August 2003 July 2003 Monthly Operating Report for Browns Ferry Nuclear Plant ML0320403062003-07-14014 July 2003 June 2003 Monthly Operating Report for Browns Ferry Units 1, 2 & 3 ML0317005912003-06-0909 June 2003 May 2003 Monthly Operating Report for Browns Ferry Nuclear Plant ML0313404432003-05-13013 May 2003 April 2003 Monthly Operating Report for Brown Ferry Nuclear Plant, Units 1, 2 & 3 ML0314106552003-05-13013 May 2003 April 2003 Monthly Operating Report for Browns Ferry Units 1, 2 & 3 ML0316814162003-05-0909 May 2003 May 2003 Monthly Operating Report for Browns Ferry ML0311305202003-04-14014 April 2003 March 2003 Monthly Operating Report for Browns Ferry Nuclear Plant ML0310604382003-04-14014 April 2003 March 2003 Monthly Operating Report for Browns Ferry Nuclear Plant ML0308406042003-03-14014 March 2003 February 2003 Monthly Operating Report for Browns Ferry ML0307602272003-03-14014 March 2003 February 2003 Monthly Operating Report for Browns Ferry, Units 1, 2 and 3 ML0305607382003-02-14014 February 2003 January 2003 Monthly Operating Report for Browns Ferry Nuclear Plant ML0305003502003-02-14014 February 2003 January 2003 Monthly Operating Report for Browns Ferry ML0302301842003-01-14014 January 2003 December 2002 Monthly Operating Report for Brown Ferry Nuclear Plant ML0301601102003-01-14014 January 2003 December 2002 Monthly Operating Report for Browns Ferry, Units 1, 2 and 3 ML0236000322002-12-12012 December 2002 November 2002 Monthly Operating Report for Browns Ferry Nuclear Plant ML0231904162002-11-14014 November 2002 October 2002 Monthly Operating Report for Browns Ferry Nuclear Plant ML0232504232002-11-14014 November 2002 October 2002 Monthly Operating Report for Browns Ferry Nuclear Plant ML0229604642002-10-15015 October 2002 September 2002 Monthly Operating Report for Browns Ferry Nuclear Plant ML0228902392002-10-15015 October 2002 September 2002 Monthly Operating Report for Browns Ferry ML0226602622002-09-12012 September 2002 August 2002 Monthly Operating Report for Browns Ferry, Units 1, 2 & 3 ML0226306902002-09-12012 September 2002 August 2002 Monthly Operating Report for Browns Ferry ML0223405042002-08-13013 August 2002 July 2002 Monthly Operating Report for Browns Ferry ML0220406422002-07-12012 July 2002 June 2002 Monthly Operating Report for Browns Ferry ML0220406702002-05-14014 May 2002 April 2002 Monthly Operating Report for Browns Ferry Nuclear Plant ML0211304962002-04-11011 April 2002 March 2002 Monthly Operating Report for Browns Ferry Units 1, 2 & 3 ML0208404042002-03-12012 March 2002 February 2002 Monthly Operating Report for Browns Ferry, Units 1, 2, and 3 ML0205903422002-02-11011 February 2002 January 2002 Monthly Operating Report for Browns Ferry Nuclear Plant, Units 1, 2, and 3 ML0203502832002-01-14014 January 2002 December 2001 Monthly Operating Report for Browns Ferry Nuclear Plant 2005-03-14
[Table view] |
Text
L-Tennessee Valley Authority, Post Office Box 2000, Decatur, Alabama 35609-2000 April 14, 2004 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Stop: OWFN, Pl-35 Washington, D.C. 20555-0001 Gentlemen:
In the Matter of ) Docket Nos. 50-259 Tennessee Valley Authority 50-260 50-296 BROWNS FERRY NUCLEAR PLANT (BFN) - MARCH 2004 MONTHLY OPERATING REPORT The enclosure provides the March 2004 Monthly Operating Report (MOR) as required by BFN Technical Specifications, Section 5.6.4.
If you have any questions concerning this report, please call me at (256) 729-2636.
Pmted on MEW pawr 14
- A U.S. Nuclear Regulatory Commission Page 2 April 14, 2004 Enclosure cc (Enclosure):
(Via NRC Electronic Distribution)
Mr. Kahtan N. Jabbour, Senior Project Manager U.S. Nuclear Regulatory Commission One White Flint, North (MS 08G9)
Office of Nuclear Reactor Regulation 11555 Rockville Pike Rockville, Maryland 20852-2738 NRC Resident Inspector Browns Ferry Nuclear Plant 10833 Shaw Road Athens, Alabama 35611-6970 Regional Administrator U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, S.W., Suite 23T85 Atlanta, Georgia 30303-8931
ENCLOSURE TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)
MONTHLY OPERATING REPORT MARCH 2004 UNIT 1 DOCKET NUMBER 50-259 LICENSE NUMBER DPR-33 UNIT 2 DOCKET NUMBER 50-260 LICENSE NUMBER DPR-52 UNIT 3 DOCKET NUMBER 50-296 LICENSE NUMBER DPR-68
OPERATING DATA REPORT Docket No. 50-259 Unit Name BFN Unit I Date April 4, 2004 Completed By J. E. Wallace Telephone (256) 729-7874 Reporting Period March 2004
- 1. Design Electrical Rating (Net MWe): 1065
- 2. Maximum Dependable Capacity (MWe-Net) 0 Month Yr-to-Date Cumulative*
- 3. Number of Hours Reactor was Critical 0 0 59521
- 4. Hours Generator On-Line 0 0 58267
- 5. Unit Reserve Shutdown Hours 0 0 0
- 6. Net Electrical Energy Generated (MWh) 0 0 53,796,427
- Excludes hours under Administration Hold (June 1, 1985 to Present)
OPERATING DATA REPORT Docket No. 50-260 Unit Name BFN Unit 2 Date April 4, 2004 Completed By J. E. Wallace Telephone (256) 729-7874 Reporting Period March 2004
- 1. Design Electrical Rating (Net MWe): 1120
- 2. Maximum Dependable Capacity (MWe-Net) 1118 Month Yr-to-Date Cumulative
- 3. Number of Hours Reactor was Critical 744 2184 158,518
- 4. Hours Generator On-Line 744 2184 155,835
- 5. Unit Reserve Shutdown Hours 0 0 0
- 6. Net Electrical Energy Generated (MWh) 840,366 2,477,313 155,999,261 E-2
OPERATING DATA REPORT Docket No. 50-296 Unit Name BEN Unit 3 Date April 4, 2004 Completed By J. E. Wallace Telephone (256) 729-7874 Reporting Period March 2004
- 1. Design Electrical Rating (Net MWe): 1120
- 2. Maximum Dependable Capacity (MWe-Net) 1118 Month Yr-to-Date Cumulative
- 3. Number of Hours Reactor was Critical 42.9 1483 115,207
- 4. Hours Generator On-Line 22.8 1463 113,750
- 5. Unit Reserve Shutdown Hours 0 0 0
- 6. Net Electrical Energy Generated (MWh) 1,235 1,520,936 116,829,539 E-3
1?
UNIT SHUTDOWNS REPORT MONTH: MARCH 2004 DOCKET NO: 50-259 UNIT NAME: BFN-I DATE: April 4, 2004 COMPLETED BY: J. E. Wallace TELEPHONE: (256) 729-7874 No. ::-- -Date Type Duration Reason Method of Ca-use andCorrectiv.e ctio ito Prevent Recurrence.:..::.-
R2eact. L El
~~~;;rl= l==1ant .or 'tt .. .
'Reason. Method 2
A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip/Scram C-Refueling 3-Automatic Trip/Scram D-Regulatory Restriction 4-Continuation Outage E-Operator Training / License Examination 5-Other (Explain)
F-Administrative G-Operational Error (Explain)
H-Other (Explain)
SU1~4ARY: Unit 1 has been on administrative hold since June 1, 1985.
E-4
UNIT SHUTDOWNS REPORT MONTH: MARCH 2004 DOCKET NO: 50-260 UNIT NAME: BFN-2 DATE: April 4, 2004 COMPLETED BY: J. E. Wallace Th.T.F.PTOnTli'.- 02548 '710-797A IN/A XReason:
2 Method A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip/Scram C-Rcfueling 3-Automatic Trip/Scram D-Regulatory Restriction 4-Continuation Outage E-Operator Training / License Examination 5-Other (Explain)
F-Administrative G-Operational Error (Explain)
H-Other (Explain)
SUMMARY
- Unit 2 has operated at or near 100 percent available power.
E-5
UNIT SHUTDOWNS REPORT MONTH: MARCH 2004 DOCKET NO: 50-296 UNIT NAME: BFN-3 DATE: April 4, 2004 COMPLETED BY: J. E. Wallace TELEPHONE: (256) 729-7874 No. Dat T Durti Reaon Meth o ause and CorrectiveActon toPrvent Recurr 1 l.F Forcedt (ors)l Shtin~f 2gl p
1 03/01/04 S 717.2 C 2 On March 1, 2004, at 0910 hours0.0105 days <br />0.253 hours <br />0.0015 weeks <br />3.46255e-4 months <br />, the Unit 3 cycle 11 refueling outage began.
On March 30, 2004, at 2146 hours0.0248 days <br />0.596 hours <br />0.00355 weeks <br />8.16553e-4 months <br />, the plant was tied to the grid, however, it was removed 25 minutes later due to testing for turbine high vibration. The vibration testing was completed, and the plant was re tied to the grid ending the Unit 3, Cycle 11 outage on March 31, 2004, at 0637 hours0.00737 days <br />0.177 hours <br />0.00105 weeks <br />2.423785e-4 months <br />.
2 03/31/04 5 3.7 B 5 On March 31, 2004, at 2020 hours0.0234 days <br />0.561 hours <br />0.00334 weeks <br />7.6861e-4 months <br />, the main turbine was shutdown after load was removed from the main generator to support balance weight installation.
l l ll l lThe plant remained off the grid for the remainder of the reporting period 2
' Reason: MIethod A-Equipment Failure (Explain) I-Manual B-Maintenancc or Test 2-Manual Trip/Scram C-Refueling 3-Automatic Trip/Scram D-Regulatory Restriction 4-Continuation Outage E-Operator Training / License Examination 5-Olher (Explain)
F-Administrative G-Operational Error (Explain)
H-Other (Explain)
SUMMARY
- Unit 3 began its cycle 11 refueling outage which continued until March 31, 2004, and turbine tests were performed.
E-6