Tennessee Valley Authority, Post Office Box 2000, Decatur, Alabama 35609-2000 July 12, 2002 U.S. Nuclear Regulatory Commission ATTN:
Document Control Desk Mail Stop OWFN, P1-35 Washington, D.C. 20555-0001 Gentlemen:
In the Matter of Tennessee Valley Authority Docket Nos.
50-259 50-260 50-296 BROWNS FERRY NUCLEAR PLANT (BFN)
JUNE 2002 MONTHLY OPERATING REPORT The enclosure provides the June 2002 Monthly Operating Report (MOR) as required by BFN Technical Specifications Section 5.6.4.
If you have any questions concerning this report, please call me at (256) 729-2636.
Si cere Manage of Licensing and Industry ffairs Enclosure cc:
See*
Printed on recycled paper
) )
U.S. Nuclear Regulatory Commission Page 2 July 12, 2002 Enclosure cc (Enclosure):
(Via NRC Electronic Distribution)
Mr. Kahtan N.
Jabbour, Senior Project Manager U.S. Nuclear Regulatory Commission One White Flint, North (MS 08G9)
Office of Nuclear Reactor Regulation 11555 Rockville Pike Rockville, Maryland 20852-2738 NRC Resident Inspector Browns Ferry Nuclear Plant P.O. Box 149 Athens, Alabama 35611 Regional Administrator U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, S.W.,
Suite 23T85 Atlanta, Georgia 30303-8931
ENCLOSURE TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)
MONTHLY OPERATING REPORT JUNE 2002 UNIT 1 DOCKET NUMBER 50-259 LICENSE NUMBER DPR-33 UNIT 2 DOCKET NUMBER 50-260 LICENSE NUMBER DPR-52 UNIT 3 DOCKET NUMBER 50-296 LICENSE NUMBER DPR-68
OPERATING DATA REPORT Docket No.
50-259 Unit Name BFN Unit 1 Date July 8, 2002 Completed By J. E. Wallace Telephone (256) 729-7874 Reporting Period June 2002
- 1. Design Electrical Rating (Net MWe):
- 2.
Maximum Dependable Capacity (MWe-Net)
- 3.
Number of Hours Reactor was Critical
- 4.
Hours Generator On-Line
- 5.
Unit Reserve Shutdown Hours
- 6.
Net Electrical Energy Generated (MWh)
Month Yr-to-Date Cumulative*
0 0
59521 0
0 58267 0
0 0
0 0
53,796,427
- Excludes hours under Administration Hold (June 1, 1985 to Present)
OPERATING DATA REPORT Docket No.
50-260 Unit Name BFN Unit 2 Date July 8, 2002 Completed By J. E. Wallace Telephone (256) 729-7874 Reporting Period June 2002
- 1. Design Electrical Rating (Net MWe):
- 2.
Maximum Dependable Capacity (MWe-Net) 1120 1118
- 3.
Number of Hours Reactor was Critical
- 4.
Hours Generator On-Line
- 5.
Unit Reserve Shutdown Hours
- 6.
Net Electrical Energy Generated (MWh)
Month Yr-to-Date Cumulative 720 4,162 144,271 720 4,154 141,646 0
0 0
804,250 4,637,432 140,878,896 E-2 1065 0
OPERATING DATA REPORT Docket No.
50-296 Unit Name BFN Unit 3 Date July 8, 2002 Completed By J. E. Wallace Telephone (256) 729-7874 Reporting Period June 2002
- 1. Design Electrical Rating (Net MWe):
- 2.
Maximum Dependable Capacity (MWe-Net)
- 3.
Number of Hours Reactor was Critical
- 4.
Hours Generator On-Line
- 5.
Unit Reserve Shutdown Hours
- 6.
Net Electrical Energy Generated (MWh)
Month Yr-to-Date Cumulative 720 4,001 100,831 720 3,990 99,407 0
0 0
801,884 4,333,473 101,056,265 E-3 1120 1118
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH: JUNE 2002 DOCKET NO:
UNIT NAME:
DATE:
COMPLETED BY:
TET,FPYUONF,1 50-259 BFN-1 July 8, 2002 J. E. Wallace (26) 729-7R74 06/01/85 S
1 _________
.1 720 F
2 Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training and License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain) 4 N/A N/A 3 Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation of Existing Outage 5-Reduction 9-Other N/A Administrative hold to resolve various TVA and NRC concerns.
4 Instructions for Preparation of Data Entry sheets for Licensee Event Report (LER)
SUMMARY
Unit 1 has been on administrative hold since June 1, 1985.
E-4 1
iF: Forced S: Scheduled
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH: JUNE 2002 DOCKET NO:
UNIT NAME:
DATE:
COMPLETED BY:
50-260 BFN-2 July 8, 2002 J. E. Wallace 2 Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training and License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain)
Unit 2 has operated at or 3 Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation of Existing Outage 5-Reduction 9-Other "4 Instructions for Preparation of Data Entry sheets for Licensee Event Report (LER)
(NUREG - 1022) near 100 percent available power without any significant events.
E-5 N/A
'F: Forced I F: Forced S: Scheduled
SUMMARY
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH: JUNE 2002 DOCKET NO:
UNIT NAME:
DATE:
COMPLETED BY:
r1Mr.1 TMVrnrrrlbrr -
50-296 BFN-3 July 8, 2002 J. E. Wallace (256) 729-7874 2 Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training and License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain) 3 Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation of Existing Outage 5-Reduction 9-Other "4 Instructions for Preparation of Data Entry sheets for Licensee Event Report (LER)
(NUREG - 1022)
SUMMARY
Unit 3 has operated at or near 100 percent available power without any significant events.
E-6 1F: Forced S: Scheduled