Tennessee Valley Authonty, Post Office Box 2000, Decatur, Alabama 35609-2000 January 14, 2003 U.S. Nuclear Regulatory Commission ATTN:
Document Control Desk Mail Stop:
- OWFN, P1-35 Washington, D.C. 20555-0001 Gentlemen:
In the Matter of
)
Docket Nos.
50-25 Tennessee Valley Authority
)
50-26 50-29 BROWNS FERRY NUCLEAR PLANT (BFN)
DECEMBER 2002 MONTHLY OPERATING REPORT The enclosure provides the December 2002 Monthly Operating Report (MOR) as required by BFN Technical Specifications Section 5.6.4.
If you have any questions concerning this report, please call me at (256) 729-2636.
SipIcerely, f-Ný/---
Pnnted on recycled paper 9
0 6
U.S. Nuclear Regulatory Commission Page 2 January 14, 2003 Enclosure cc (Enclosure):
(Via NRC Electronic Distribution)
Mr. Kahtan N.
Jabbour, Senior Project Manager U.S. Nuclear Regulatory Commission One White Flint, North (MS 08G9)
Office of Nuclear Reactor Regulation 11555 Rockville Pike Rockville, Maryland 20852-2738 NRC Resident Inspector Browns Ferry Nuclear Plant 10833 Shaw Road Athens, Alabama 35611-6970 Regional Administrator U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, S.W.,
Suite 23T85 Atlanta, Georgia 30303-8931
ENCLOSURE TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)
MONTHLY OPERATING REPORT DECEMBER 2002 UNIT 1 DOCKET NUMBER 50-259 LICENSE NUMBER DPR-33 UNIT 2 DOCKET NUMBER 50-260 LICENSE NUMBER DPR-52 UNIT 3 DOCKET NUMBER 50-296 LICENSE NUMBER DPR-68
Docket No.
50-259 Unit Name BFN Unit I Date January 6, 2003 Completed By J. E Wallace Telephone (256) 729-7874 Reporting Period December 2002
- 1.
Design Electrical Rating (Net MWe).
- 2.
Maximum Dependable Capacity (MWe-Net)
Yr-to-Date Cumulative*
- 3.
Number of Hours Reactor was Critical
- 4.
Hours Generator On-Line
- 5.
Unit Reserve Shutdown Hours
- 6.
Net Electrical Energy Generated (MWh) 0 0
59521 0
0 58267 0
0 0
0 0
53,796,427
- Excludes hours under Administration Hold (June 1, 1985 to Present)
OPERATING DATA REPORT Docket No.
50-260 Unit Name BFN Unit 2 Date January 6, 2003 Completed By J. E. Wallace Telephone (256) 729-7874 Reporting Period December 2002
- 1. Design Electrical Rating (Net MWe):
- 2.
Maximum Dependable Capacity (MWe-Net) 1120 1118
- 3.
Number of Hours Reactor was Critical
- 4.
Hours Generator On-Line
- 5.
Unit Reserve Shutdown Hours
- 6.
Net Electrical Energy Generated (MWh)
Month Yr-to-Date Cumulative 744 8,298 148,407 744 8,270 145,761 0
0 0
775,198 8,911,262 145,152,726 E-2 OPERATING DATA REPORT 1065 0
Month
OPERATING DATA REPORT Docket No.
50-296 Unit Name BFN Unit 3 Date January 6, 2003 Completed By J. E. Wallace Telephone (256) 729-7874 Reporting Period December 2002
- 1. Design Electrical Rating (Net MWe):
1120
- 2.
Maximum Dependable Capacity (MWe-Net) 1118
- 3.
Number of Hours Reactor was Critical
- 4.
Hours Generator On-Line
- 5.
Unit Reserve Shutdown Hours
- 6.
Net Electrical Energy Generated (MWh)
Month Yr-to-Date Cumulative 744 8,418 105,248 744 8,407 103,824 0
0 0
841,903 9,260,078 105,982,871 E-3 s
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH: DECEMBER 2002 I.....
F Lvenice.nsee.: o..
ThreN t Reporti?',i,*i*,ii:
System-ý:ý C d DOCKET NO:
UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
C,.de 4
- 1.
4 t
1 N/A N/A N/A I
I I
I I__
I
_J_
I.
1F: Forced S: Scheduled 2 Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatoiy Restriction E-Operator Training and License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain)
Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation of Existing Outage 5-Reduction 9-Other 50-259 BFN-1 January 6, 2003 J. E. Wallace (256) 729-7874 i:Cu~se e.and C*orrective Action., to Prevent.
Recurrence.'......
Administrative hold to resolve various TVA and NRC concerns.
4 Instructions for Preparation of Data Entry sheets for Licensee Event Report (LER)
(NUREG - 1022)
SUMMARY
Unit 1 has been on administrative hold since June 1, 1985.
E-4 Date
TyrP.e1 1
' i rati f oIn lHours Reason' 06/01/85 Shutg eA tor3 S
744 F
4
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH: DECEMBER 2002 DOCKET NO:
UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
50-260 BFN-2 January 6, 2003 J. E. Wallace (256) 729-7874 Noi f.atfe.
Type
'Durotio" Reon*
iIethod of' L" icesee Sstei C6mponent Cauise and Cr0rec'etie ActAion.toPrevent wnReortNo..
~~.
o r x-:
i*.
i::iiiii~ iii.I
- iii*::*:"
- l 0t iS iiiiii N/A S
F: Forced 2 Reason:
3M Vethod 4 Instructions for Preparation of S: Scheduled A-Equipment Failure (Explain) 1-Manual Data Entry sheets for Licensee B-Maintenance or Test 2-Manual Scram Event Report (LER)
C-Refueling 3-Automatic Scram (NUREG - 1022)
D-Regulatory Restriction 4-Continuation of Existing E-Operator TFraining and License Outage Examination 5-Reduction F-Administrative 9-Other G-Operational Error (Explain)
H-Other (Explain)
SUMMARY
Unit 2 has operated without any significant events and began coastdown for refueling outage.
E-5
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH: DECEMBER 2002 DOCKET NO:
UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
50-296 BFN-3 January 6, 2003 J. E. Wallace (256) 729-7874 2 Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training and License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain) 3 Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation of Existing Outage 5-Reduction 9-Otlier 4 Instructions for Preparation of Data Entry sheets for Licensee Event Report (LER)
(NUREG - 1022)
SULAMARY:
Unit 3 has operated at or near 100 percent available power without any significant events.
E-6
- N Date Type Dration Reason
- Method.o 1cesee:
-iSystem :::-.Comnp6ient Cause and CorvectiveActiou to Prevent
......:::::.(H urs Shutting R eport........
4,.:.:,..,,e..
3 l
R o
rwn*..:
N/A 1F: Forced S: Scheduled