December 2002 Monthly Operating Report for Brown Ferry Nuclear Plant
ML030230184
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 01/14/2003
From: Abney T
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML030230184 (8)


Text

Tennessee Valley Authonty, Post Office Box 2000, Decatur, Alabama 35609-2000 January 14, 2003 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Stop: OWFN, P1-35 Washington, D.C. 20555-0001 Gentlemen:

In the Matter of ) Docket Nos. 50-25 9 Tennessee Valley Authority ) 50-26 0 50-29 6 BROWNS FERRY NUCLEAR PLANT (BFN) - DECEMBER 2002 MONTHLY OPERATING REPORT The enclosure provides the December 2002 Monthly Operating Report (MOR) as required by BFN Technical Specifications Section 5.6.4.

If you have any questions concerning this report, please call me at (256) 729-2636.

SipIcerely, f-Ný/---

Pnnted on recycled paper

U.S. Nuclear Regulatory Commission Page 2 January 14, 2003 Enclosure cc (Enclosure):

(Via NRC Electronic Distribution)

Mr. Kahtan N. Jabbour, Senior Project Manager U.S. Nuclear Regulatory Commission One White Flint, North (MS 08G9)

Office of Nuclear Reactor Regulation 11555 Rockville Pike Rockville, Maryland 20852-2738 NRC Resident Inspector Browns Ferry Nuclear Plant 10833 Shaw Road Athens, Alabama 35611-6970 Regional Administrator U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, S.W., Suite 23T85 Atlanta, Georgia 30303-8931

ENCLOSURE TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)

MONTHLY OPERATING REPORT DECEMBER 2002 UNIT 1 DOCKET NUMBER 50-259 LICENSE NUMBER DPR-33 UNIT 2 DOCKET NUMBER 50-260 LICENSE NUMBER DPR-52 UNIT 3 DOCKET NUMBER 50-296 LICENSE NUMBER DPR-68

OPERATING DATA REPORT Docket No. 50-259 Unit Name BFN Unit I Date January 6, 2003 Completed By J. E Wallace Telephone (256) 729-7874 Reporting Period December 2002

1. Design Electrical Rating (Net MWe). 1065
2. Maximum Dependable Capacity (MWe-Net) 0 Month Yr-to-Date Cumulative*
3. Number of Hours Reactor was Critical 0 0 59521
4. Hours Generator On-Line 0 0 58267
5. Unit Reserve Shutdown Hours 0 0 0
6. Net Electrical Energy Generated (MWh) 0 0 53,796,427
  • Excludes hours under Administration Hold (June 1, 1985 to Present)

OPERATING DATA REPORT Docket No. 50-260 Unit Name BFN Unit 2 Date January 6, 2003 Completed By J. E. Wallace Telephone (256) 729-7874 Reporting Period December 2002

1. Design Electrical Rating (Net MWe): 1120
2. Maximum Dependable Capacity (MWe-Net) 1118 Month Yr-to-Date Cumulative
3. Number of Hours Reactor was Critical 744 8,298 148,407
4. Hours Generator On-Line 744 8,270 145,761
5. Unit Reserve Shutdown Hours 0 0 0
6. Net Electrical Energy Generated (MWh) 775,198 8,911,262 145,152,726 E-2

s OPERATING DATA REPORT Docket No. 50-296 Unit Name BFN Unit 3 Date January 6, 2003 Completed By J. E. Wallace Telephone (256) 729-7874 Reporting Period December 2002

1. Design Electrical Rating (Net MWe): 1120
2. Maximum Dependable Capacity (MWe-Net) 1118 Month Yr-to-Date Cumulative
3. Number of Hours Reactor was Critical 744 8,418 105,248
4. Hours Generator On-Line 744 8,407 103,824
5. Unit Reserve Shutdown Hours 0 0 0
6. Net Electrical Energy Generated (MWh) 841,903 9,260,078 105,982,871 E-3

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH: DECEMBER 2002 DOCKET NO: 50-259 UNIT NAME: BFN-1 DATE: January 6, 2003 COMPLETED BY: J. E. Wallace TELEPHONE: (256) 729-7874

, .. I.. . . . .. .. . -. F

........... Date TyrP.e1 'i ratioIn f Reason' Lvenice.nsee.:o.. System-ý:ý i:Cu~see.and C*orrective Action., to Prevent .

4 lHours Shutg ThreN t Reporti?',i,*i*,ii:

C d C ,.de Recurrence.'......

1. 4 _______

eA tor3 t 1

1 06/01/85 S 744 F 4 N/A N/A N/A Administrative hold to resolve various TVA and NRC concerns.

I I I I _ _ _ _ I__

__ _ _ _ _ _I _. _ _ _ _J_ _ _ _ _ I.

1 2Reason: Method 4Instructions for Preparation of F: Forced S: Scheduled A-Equipment Failure (Explain) 1-Manual Data Entry sheets for Licensee B-Maintenance or Test 2-Manual Scram Event Report (LER)

C-Refueling 3-Automatic Scram (NUREG - 1022)

D-Regulatoiy Restriction 4-Continuation of Existing E-Operator Training and License Outage Examination 5-Reduction F-Administrative 9-Other G-Operational Error (Explain)

H-Other (Explain)

SUMMARY

Unit 1 has been on administrative hold since June 1, 1985.

E-4

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH: DECEMBER 2002 DOCKET NO: 50-260 UNIT NAME: BFN-2 DATE: January 6, 2003 COMPLETED BY: J. E. Wallace TELEPHONE: (256) 729-7874 C6mponent Cauise and Cr0rec'etie ActAion.toPrevent Noi f.atfe. Type 'Durotio" Reon*

........ wnReortNo..Sstei iIethod of' L" icesee x-: i*. i::iiiii~ iii.I * :iii*::*:" *l 0t iS iiiiii :** ................ . ....................

or ________. ~~...............

N/A 2 3 SF: Forced Reason: M Vethod 4 Instructions for Preparation of S: Scheduled A-Equipment Failure (Explain) 1-Manual Data Entry sheets for Licensee B-Maintenance or Test 2-Manual Scram Event Report (LER)

C-Refueling 3-Automatic Scram (NUREG - 1022)

D-Regulatory Restriction 4-Continuation of Existing E-Operator TFraining and License Outage Examination 5-Reduction F-Administrative 9-Other G-Operational Error (Explain)

H-Other (Explain)

SUMMARY

Unit 2 has operated without any significant events and began coastdown for refueling outage.

E-5

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH: DECEMBER 2002 DOCKET NO: 50-296 UNIT NAME: BFN-3 DATE: January 6, 2003 COMPLETED BY: J. E. Wallace TELEPHONE: (256) 729-7874

N . Date Type Dration Reason :Method.o 1cesee: -iSystem:::-.Comnp6ient Cause and CorvectiveActiou to Prevent 4
  • .*::: :: . .  :.: .. . .. urs

.. ....:::::.(H  :::::::. Shutting R eport...... .. .. , .:.:,..,,e.. ....................... ... .

.. 3  :.:.: . . l . : . .. :.:.... .. :.: ... ::: . .. ........ ,.

. . . .. ... . .. ........ R o rwn*..:

N/A 1

F: Forced 2Reason: 3 Method 4 Instructions for Preparation of S: Scheduled A-Equipment Failure (Explain) 1-Manual Data Entry sheets for Licensee B-Maintenance or Test 2-Manual Scram Event Report (LER)

C-Refueling 3-Automatic Scram (NUREG - 1022)

D-Regulatory Restriction 4-Continuation of Existing E-Operator Training and License Outage Examination 5-Reduction F-Administrative 9-Otlier G-Operational Error (Explain)

H-Other (Explain)

SULAMARY: Unit 3 has operated at or near 100 percent available power without any significant events.

E-6