December 2004 Monthly Operating Report for Browns Ferry Nuclear Plant
ML050110435
Person / Time
Site: Browns Ferry  
(DPR-033, DPR-052, DPR-068)
Issue date: 01/11/2005
From: Abney T
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML050110435 (9)


Text

January 11, 2005 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Stop: OWFN, P1-35 Washington, D.C. 20555-0001 Gentlemen:

In the Matter of

) Docket Nos. 50-259 Tennessee Valley Authority ) 50-260 50-296 BROWNS FERRY NUCLEAR PLANT (BFN) - DECEMBER 2004 MONTHLY OPERATING REPORT The enclosure provides the December 2004 Monthly Operating Report (MOR) as required by BFN Technical Specifications, Section 5.6.4.

If you have any questions concerning this report, please call me at (256) 729-2636.

Sincerely, Original signed by:

T. E. Abney Manager of Licensing and Industry Affairs Enclosure cc: See page 2

U.S. Nuclear Regulatory Commission Page 2 January 11, 2005 Enclosure cc (Enclosure):

(Via NRC Electronic Distribution)

NRC Resident Inspector Browns Ferry Nuclear Plant 10833 Shaw Road Athens, Alabama 35611-6970 Regional Administrator U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, S.W., Suite 23T85 Atlanta, Georgia 30303-8931 Eva A. Brown, Project Manager U.S. Nuclear Regulatory Commission (MS 08G9)

One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2739 Mr. Stephen J. Cahill, Branch Chief U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, Georgia 30303-8931 Ms. Margaret Chernoff, Project Manager U.S. Nuclear Regulatory Commission One White Flint, North (MS 08G9) 11555 Rockville Pike Rockville, Maryland 20852-2739

U.S. Nuclear Regulatory Commission Page 3 January 11, 2005 JEW:BAB Enclosure cc (Enclosure):

A. S. Bhatnagar, LP 6A-C J. C. Fornicola, LP 6A-C R. G. Jones, NAB 1A-BFN K. L. Krueger, POB 2C-BFN R. F. Marks, PAB 1C-BFN N. M. Moon, BR 4T-C J. R. Rupert, NAB 1A-BFN K. W. Singer, LP 6A-C M. D. Skaggs, PAB 1E-BFN E. J. Vigluicci ET 11A-K NSRB Support, LP 5M-C EDMS, WT CA-K S:lic/submit/subs/MOR December 04.doc

ENCLOSURE TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)

MONTHLY OPERATING REPORT DECEMBER 2004 UNIT 1 DOCKET NUMBER 50-259 LICENSE NUMBER DPR-33 UNIT 2 DOCKET NUMBER 50-260 LICENSE NUMBER DPR-52 UNIT 3 DOCKET NUMBER 50-296 LICENSE NUMBER DPR-68

E-2 OPERATING DATA REPORT Docket No.

50-259 Unit Name BFN Unit 1 Date January 5, 2005 Completed By J. E. Wallace Telephone (256) 729-7874 Reporting Period December 2004

1.

Design Electrical Rating (Net MWe):

1065

2.

Maximum Dependable Capacity (MWe-Net) 0 Month Yr-to-Date Cumulative*

3.

Number of Hours Reactor was Critical 0

0 59521

4.

Hours Generator On-Line 0

0 58267

5.

Unit Reserve Shutdown Hours 0

0 0

6.

Net Electrical Energy Generated (MWh) 0 0

53,796,427

  • Excludes hours under Administration Hold (June 1, 1985 to Present)

OPERATING DATA REPORT Docket No.

50-260 Unit Name BFN Unit 2 Date January 5, 2005 Completed By J. E. Wallace Telephone (256) 729-7874 Reporting Period December 2004

1.

Design Electrical Rating (Net MWe):

1120

2.

Maximum Dependable Capacity (MWe-Net) 1118 Month Yr-to-Date Cumulative

3.

Number of Hours Reactor was Critical 744 8720 165,054

4.

Hours Generator On-Line 744 8715 162,366

5.

Unit Reserve Shutdown Hours 0

0 0

6.

Net Electrical Energy Generated (MWh) 839,905 9,785,981 163,307,929 OPERATING DATA REPORT

E-3 Docket No.

50-296 Unit Name BFN Unit 3 Date January 5, 2005 Completed By J. E. Wallace Telephone (256) 729-7874 Reporting Period December 2004

1.

Design Electrical Rating (Net MWe):

1120

2.

Maximum Dependable Capacity (MWe-Net) 1118 Month Yr-to-Date Cumulative

3.

Number of Hours Reactor was Critical 744 8057 121,781

4.

Hours Generator On-Line 744 8001 120,288

5.

Unit Reserve Shutdown Hours 0

0 0

6.

Net Electrical Energy Generated (MWh) 836,381 8,701,825 124,010,428

E-4 UNIT SHUTDOWNS REPORT MONTH: DECEMBER 2004 DOCKET NO:

50-259 UNIT NAME:

BFN-1 DATE:

January 5, 2005 COMPLETED BY:

J. E. Wallace TELEPHONE:

(256) 729-7874 No.

Date Type F: Forced S: Scheduled Duration (Hours)

Reason1 Method of Shutting Down Reactor2 Cause and Corrective Action to Prevent Recurrence 1

06/01/85 S

744 F

4 Administrative hold to resolve various TVA and NRC concerns.

1 Reason:

2 Method A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip/Scram C-Refueling 3-Automatic Trip/Scram D-Regulatory Restriction E-Operator Training / License Examination 4-Continuation Outage 5-Other (Explain)

F-Administrative G-Operational Error (Explain)

H-Other (Explain)

SUMMARY

Unit 1 has been on administrative hold since June 1, 1985.

UNIT SHUTDOWNS

E-5 REPORT MONTH: DECEMBER 2004 DOCKET NO:

50-260 UNIT NAME:

BFN-2 DATE:

January 5, 2005 COMPLETED BY:

J. E. Wallace TELEPHONE:

(256) 729-7874 No.

Date Type F: Forced S: Scheduled Duration (Hours)

Reason1 Method of Shutting Down Reactor2 Cause and Corrective Action to Prevent Recurrence N/A 1 Reason:

2 Method A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip/Scram C-Refueling 3-Automatic Trip/Scram D-Regulatory Restriction E-Operator Training / License Examination 4-Continuation Outage 5-Other (Explain)

F-Administrative G-Operational Error (Explain)

H-Other (Explain)

SUMMARY

Unit 2 has operated at or near 100 percent available power except for testing.

E-6 UNIT SHUTDOWNS REPORT MONTH: DECEMBER 2004 DOCKET NO:

50-296 UNIT NAME:

BFN-3 DATE:

January 5, 2005 COMPLETED BY:

J. E. Wallace TELEPHONE:

(256) 729-7874 No.

Date Type F: Forced S: Scheduled Duration (Hours)

Reason1 Method of Shutting Down Reactor2 Cause and Corrective Action to Prevent Recurrence N/A 1 Reason:

2 Method A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip/Scram C-Refueling 3-Automatic Trip/Scram D-Regulatory Restriction E-Operator Training / License Examination 4-Continuation Outage 5-Other (Explain)

F-Administrative G-Operational Error (Explain)

H-Other (Explain)

SUMMARY

Unit 3 has operated at or near 100 percent available power except for testing.