January 2002 Monthly Operating Report for Browns Ferry Nuclear Plant, Units 1, 2, and 3
ML020590342
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 02/11/2002
From: Abney T
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML020590342 (8)


Text

Tennessee Valley Authority, Post Office Box 2000, Decatur, Alabama 35609-2000 February 11, 2002 U.S. Nuclear Regulatory Commission ATTN:

Document Control Desk Mail Stop WFN, P1-35 Washington, D.C.

20555-0001 Gentlemen:

In the Matter of

)

Docket Nos.

50-259 Tennessee Valley Authority

)

50-260 50-296 BROWNS FERRY NUCLEAR PLANT (BFN)

JANUARY 2002 MONTHLY OPERATING REPORT The enclosure provides the January 2002 Monthly Operating Report (MOR) as required by BFN Technical Specifications Section 5.6.4.

If you have any questions concerning this report, please call me at (256) 729-2636.

Si cereli Man of Licensin and Industry Affa~rs Enclosure c:

See Printed on recycled paper

U.S. Nuclear Regulatory Commission Page 2 February 11, 2002 Enclosure cc (Enclosure):

(Via NRC Electronic Distribution)

Mr.

Kahtan N.

Jabbour, Senior Project Manager U.S. Nuclear Regulatory Commission One White Flint, North (MS 08G9)

Office of Nuclear Reactor Regulation 11555 Rockville Pike Rockville, Maryland 20852-2738 NRC Resident Inspector Browns Ferry Nuclear Plant P.O.

Box 149 Athens, Alabama 35611 Regional Administrator U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, S.W.,

Suite 23T85 Atlanta, Georgia 30303-8931

ENCLOSURE 1 TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)

MONTHLY OPERATING REPORT JANUARY 2002 UNIT 1 DOCKET NUMBER 50-259 LICENSE NUMBER DPR-33 UNIT 2 DOCKET NUMBER 50-260 LICENSE NUMBER DPR-52 UNIT 3 DOCKET NUMBER 50-296 LICENSE NUMBER DPR-68

Docket No.

50-259 Unit Name BFN Unit 1 Date February 4, 2002 Completed By J. E. Wallace Telephone (256) 729-7874 Reporting Period January 2002

1.

Design Electrical Rating (Net MWe):

2.

Maximum Dependable Capacity (MWe-Net)

3.

Number of Hours Reactor was Critical

4.

Hours Generator On-Line

5.

Unit Reserve Shutdown Hours

6.

Net Electrical Energy Generated (MWh)

Month Yr-to-Date Cumulative*

0 0

59521 0

0 58267 0

0 0

0 0

53,796,427

  • Excludes hours under Administration Hold (June 1, 1985 to Present)

OPERATING DATA REPORT Docket No.

50-260 Unit Name BFN Unit 2 Date February 4, 2002 Completed By J. E. Wallace Telephone (256) 729-7874 Reporting Period January 2002

1. Design Electrical Rating (Net MWe):
2.

Maximum Dependable Capacity (MWe-Net) 1120 1118

3.

Number of Hours Reactor was Critical

4.

Hours Generator On-Line

5.

Unit Reserve Shutdown Hours

6.

Net Electrical Energy Generated (MWh)

Month Yr-to-Date Cumulative 744 744 140,853 744 744 138,236 0

0 0

841,306 841,306 137,082,771 E-2 OPERATING DATA REPORT 1065 0

OPERATING DATA REPORT Docket No.

50-296 Unit Name BFN Unit 3 Date February 4, 2002 Completed By J. E. Wallace Telephone (256) 729-7874 Reporting Period January 2002

1.

Design Electrical Rating (Net MWe):

2.

Maximum Dependable Capacity (MWe-Net)

3.

Number of Hours Reactor was Critical

4.

Hours Generator On-Line

5.

Unit Reserve Shutdown Hours

6.

Net Electrical Energy Generated (MWh)

Month Yr-to-Date Cumulative 744 744 97,574 744 744 96,160 0

0 0

844,102 844,102 97,566,895 E-3 1120 1118

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH: JANUARY 2002 DOCKET NO:

UNIT NAME:

DATE:

COMPLETED BY:

raV 17 17 tV'nTTF(*XT 50-259 BFN-1 February 4, 2002 J. E. Wallace (256) 729-7874 06/01/85 S

744 F

4 I

I

____________________ I __________________ L ______________________.1.

2Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training and License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain)

N/A N/A 3Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation of Existing Outage 5-Reduction 9-Other N/A Administrative hold to resolve various TVA and NRC concerns.

4 Instructions for Preparation of Data Entry sheets for Licensee Event Report (LER)

(NUREG - 1022)

SUMMARY

Unit 1 has been on administrative hold since June 1, 1985.

E-4 1

'F: Forced S: Scheduled

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH: JANUARY 2002 DOCKET NO:

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

50-260 BFN-2 FEBRUARY 4, 2002 J. E. Wallace (256) 729-7874 I

I I

L_________ I ____________

L ______________

I _________

+/-

2 Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training and License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain)

Unit 2 has operated near 3 Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation of Existing Outage 5-Reduction 9-Other 100 percent power without any significant events.

E-5 N/A 1F: Forced S: Scheduled

SUMMARY

4 Instructions for Preparation of Data Entry sheets for Licensee Event Report (LER)

(NUREG - 1022)

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH: JANUARY 2002 DOCKET NO:

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

50-296 BFN-3 FEBRUARY 4, 2002 J. E. Wallace Or',<M 7')0J'727A I _______

I _____

I _______

+/- _______

.i. _________

.1 __________

J _________

2 Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training and License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain) 3 Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation of Existing Outage 5-Reduction 9-Other 4 Instructions for Preparation of Data Entry sheets for Licensee Event Report (LER)

(NUREG - 1022)

SUMMARY

Unit 3 has operated near 100 percent power without any significant events.

E-6 1F: Forced S: Scheduled