ML020590342

From kanterella
Jump to navigation Jump to search
January 2002 Monthly Operating Report for Browns Ferry Nuclear Plant, Units 1, 2, and 3
ML020590342
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 02/11/2002
From: Abney T
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML020590342 (8)


Text

Tennessee Valley Authority, Post Office Box 2000, Decatur, Alabama 35609-2000 February 11, 2002 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Stop WFN, P1-35 Washington, D.C. 20555-0001 Gentlemen:

In the Matter of ) Docket Nos. 50-259 Tennessee Valley Authority ) 50-260 50-296 BROWNS FERRY NUCLEAR PLANT (BFN) - JANUARY 2002 MONTHLY OPERATING REPORT The enclosure provides the January 2002 Monthly Operating Report (MOR) as required by BFN Technical Specifications Section 5.6.4.

If you have any questions concerning this report, please call me at (256) 729-2636.

Si cereli Man of Licensin and Industry Affa~rs Enclosure c: See Printed on recycled paper

U.S. Nuclear Regulatory Commission Page 2 February 11, 2002 Enclosure cc (Enclosure):

(Via NRC Electronic Distribution)

Mr. Kahtan N. Jabbour, Senior Project Manager U.S. Nuclear Regulatory Commission One White Flint, North (MS 08G9)

Office of Nuclear Reactor Regulation 11555 Rockville Pike Rockville, Maryland 20852-2738 NRC Resident Inspector Browns Ferry Nuclear Plant P.O. Box 149 Athens, Alabama 35611 Regional Administrator U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, S.W., Suite 23T85 Atlanta, Georgia 30303-8931

ENCLOSURE 1 TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)

MONTHLY OPERATING REPORT JANUARY 2002 UNIT 1 DOCKET NUMBER 50-259 LICENSE NUMBER DPR-33 UNIT 2 DOCKET NUMBER 50-260 LICENSE NUMBER DPR-52 UNIT 3 DOCKET NUMBER 50-296 LICENSE NUMBER DPR-68

OPERATING DATA REPORT Docket No. 50-259 Unit Name BFN Unit 1 Date February 4, 2002 Completed By J. E. Wallace Telephone (256) 729-7874 Reporting Period January 2002

1. Design Electrical Rating (Net MWe): 1065
2. Maximum Dependable Capacity (MWe-Net) 0 Month Yr-to-Date Cumulative*
3. Number of Hours Reactor was Critical 0 0 59521
4. Hours Generator On-Line 0 0 58267
5. Unit Reserve Shutdown Hours 0 0 0
6. Net Electrical Energy Generated (MWh) 0 0 53,796,427
  • Excludes hours under Administration Hold (June 1, 1985 to Present)

OPERATING DATA REPORT Docket No. 50-260 Unit Name BFN Unit 2 Date February 4, 2002 Completed By J. E. Wallace Telephone (256) 729-7874 Reporting Period January 2002

1. Design Electrical Rating (Net MWe): 1120
2. Maximum Dependable Capacity (MWe-Net) 1118 Month Yr-to-Date Cumulative
3. Number of Hours Reactor was Critical 744 744 140,853
4. Hours Generator On-Line 744 744 138,236
5. Unit Reserve Shutdown Hours 0 0 0
6. Net Electrical Energy Generated (MWh) 841,306 841,306 137,082,771 E-2

OPERATING DATA REPORT Docket No. 50-296 Unit Name BFN Unit 3 Date February 4, 2002 Completed By J. E. Wallace Telephone (256) 729-7874 Reporting Period January 2002

1. Design Electrical Rating (Net MWe): 1120
2. Maximum Dependable Capacity (MWe-Net) 1118 Month Yr-to-Date Cumulative
3. Number of Hours Reactor was Critical 744 744 97,574
4. Hours Generator On-Line 744 744 96,160
5. Unit Reserve Shutdown Hours 0 0 0
6. Net Electrical Energy Generated (MWh) 844,102 844,102 97,566,895 E-3

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH: JANUARY 2002 DOCKET NO: 50-259 UNIT NAME: BFN-1 DATE: February 4, 2002 COMPLETED BY: J. E. Wallace raV17 17

  • tV'nTTF(*XT (256) 729-7874 1 06/01/85 S 744 F 4 N/A N/A N/A Administrative hold to resolve various TVA and NRC concerns.

I I ____________________I __________________L ______________________.1.

'F: Forced 2 Reason: 3Method 4Instructions for Preparation of S: Scheduled A-Equipment Failure (Explain) 1-Manual Data Entry sheets for Licensee B-Maintenance or Test 2-Manual Scram Event Report (LER)

C-Refueling 3-Automatic Scram (NUREG - 1022)

D-Regulatory Restriction 4-Continuation of Existing E-Operator Training and License Outage Examination 5-Reduction F-Administrative 9-Other G-Operational Error (Explain)

H-Other (Explain)

SUMMARY

Unit 1 has been on administrative hold since June 1, 1985.

E-4

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH: JANUARY 2002 DOCKET NO: 50-260 UNIT NAME: BFN-2 DATE: FEBRUARY 4, 2002 COMPLETED BY: J. E. Wallace TELEPHONE: (256) 729-7874 N/A I I I L_________ I ____________ L ______________ I _________ +/-

1 2 3Method 4 Instructions for Preparation of F: Forced Reason:

A-Equipment Failure (Explain) 1-Manual Data Entry sheets for Licensee S: Scheduled B-Maintenance or Test 2-Manual Scram Event Report (LER)

C-Refueling 3-Automatic Scram (NUREG - 1022)

D-Regulatory Restriction 4-Continuation of Existing E-Operator Training and License Outage Examination 5-Reduction F-Administrative 9-Other G-Operational Error (Explain)

H-Other (Explain)

SUMMARY

Unit 2 has operated near 100 percent power without any significant events.

E-5

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH: JANUARY 2002 DOCKET NO: 50-296 UNIT NAME: BFN-3 DATE: FEBRUARY 4, 2002 COMPLETED BY: J. E. Wallace TELEPHONE: Or',<M 7')0J'727A

____ I _______ I _____ I _______ +/- _______ .i. _________ .1 __________ ______ J _________

1 F: Forced 2Reason: 3Method 4 Instructions for Preparation of S: Scheduled A-Equipment Failure (Explain) 1-Manual Data Entry sheets for Licensee B-Maintenance or Test 2-Manual Scram Event Report (LER)

C-Refueling 3-Automatic Scram (NUREG - 1022)

D-Regulatory Restriction 4-Continuation of Existing E-Operator Training and License Outage Examination 5-Reduction F-Administrative 9-Other G-Operational Error (Explain)

H-Other (Explain)

SUMMARY

Unit 3 has operated near 100 percent power without any significant events.

E-6