Tennessee Valley Authority, Post Office Box 2000, Decatur, Alabama 35609-2000 September 12, 2002 U.S. Nuclear Regulatory Commission ATTN:
Document Control Desk Mail Stop OWFN, P1-35 Washington, D.C. 20555-0001 Gentlemen:
Docket Nos.
In the Matter of Tennessee Valley Authority 50-259 50-260 50-296 BROWNS FERRY NUCLEAR PLANT (BFN)
- AUGUST 2002 MONTHLY OPERATING REPORT The enclosure provides the August 2002 Monthly Operating Report (MOR) as required by BFN Technical Specifications Section 5.6.4.
If you have any questions concerning this report, please call me at (256) 729-2636.
S ncerel T. E.
Manager f Licensi g and ndustry Aff irs Enclosu cc:
See e 2 Printed on rnycled pape
) )
U.S. Nuclear Regulatory Commission Page 2 September 12, 2002 Enclosure cc (Enclosure):
(Via NRC Electronic Distribution)
Mr. Kahtan N. Jabbour, Senior Project Manager U.S. Nuclear Regulatory Commission One White Flint, North (MS 08G9)
Office of Nuclear Reactor Regulation 11555 Rockville Pike Rockville, Maryland 20852-2738 NRC Resident Inspector Browns Ferry Nuclear Plant P.O. Box 149 Athens, Alabama 35611 Regional Administrator U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, S.W., Suite 23T85 Atlanta, Georgia 30303-8931
4 ENCLOSURE TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)
MONTHLY OPERATING REPORT AUGUST 2002 UNIT 1 DOCKET NUMBER 50-259 LICENSE NUMBER DPR-33 UNIT 2 DOCKET NUMBER 50-260 LICENSE NUMBER DPR-52 UNIT 3 DOCKET NUMBER 50-296 LICENSE NUMBER DPR-68
OPERATING DATA REPORT Docket No.
50-259 Unit Name BFN Unit 1 Date September 6, 2002 Completed By J. E. Wallace Telephone (256) 729-7874 Reporting Period August 2002
- 1. Design Electrical Rating (Net MWe):
- 2.
Maximum Dependable Capacity (MWe-Net)
Yr-to-Date Cumulative*
- 3.
Number of Hours Reactor was Critical
- 4.
Hours Generator On-Line
- 5.
Unit Reserve Shutdown Hours
- 6.
Net Electrical Energy Generated (MWh) 0 0
59521 0
0 58267 0
0 0
0 0
53,796,427
- Excludes hours under Administration Hold (June 1, 1985 to Present)
OPERATING DATA REPORT Docket No.
50-260 Unit Name BFN Unit 2 Date September 6, 2002 Completed By J. E. Wallace Telephone (256) 729-7874 Reporting Period August 2002
- 1. Design Electrical Rating (Net MWe):
- 2.
Maximum Dependable Capacity (MWe-Net) 1120 1118
- 3.
Number of Hours Reactor was Critical
- 4.
Hours Generator On-Line
- 5.
Unit Reserve Shutdown Hours
- 6.
Net Electrical Energy Generated (MWh)
Month Yr-to-Date Cumulative 744 5,597 145,706 744 5,577 143,068 0
0 0
807,883 6,174,436 142,415,900 E-2 1065 0
Month
OPERATING DATA REPORT Docket No.
50-296 Unit Name BFN Unit 3 Date September 6, 2002 Completed By J. E. Wallace Telephone (256) 729-7874 Reporting Period August 2002
- 1. Design Electrical Rating (Net MWe):
- 2.
Maximum Dependable Capacity (MWe-Net)
- 3.
Number of Hours Reactor was Critical
- 4.
Hours Generator On-Line
- 5.
Unit Reserve Shutdown Hours
- 6.
Net Electrical Energy Generated (MWh)
Month Yr-to-Date Cumulative 744 5,489 102,319 744 5,478 100,895 0
0 0
812,462 5,965,204 102,687,996 E-3 1120 1118
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH: AUGUST 2002 D....a f i
.n (Ho..u.....)
744 F
Z e.:
Methor,_.f Eve nt Rep ortl:
.. I.. 4...
4 N/A DOCKET NO:
UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
N/A I _________
- i. _______
I __________
I _________
I ____________
L ______________
n
'F: Forced S: Scheduled z Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training and License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain) 3 Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation of Existing Outage 5-Reduction 9-Other N/A 50-259 BFN-1 September 6, 2002 J. E. Wallace (256) 729-7874 Administrative hold to resolve various TVA and NRC concerns.
4 Instructions for Preparation of Data Entry sheets for Licensee Event Report (LER)
SUMMARY
Unit 1 has been on administrative hold since June 1, 1985.
E-4 1
06/01/85 S
I I 1 11 1
1
'I UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH: AUGUST 2002 DOCKET NO:
UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
50-260 BFN-2 September 6, 2002 J. E. Wallace (256) 729-7874 1F: Forced
'Reason:
S: Scheduled A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training and License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain)
SUMMARY
Unit 2 has operated at or
'Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation of Existing Outage 5-Reduction 9-Other Instructions for Preparation of Data Entry sheets for Licensee Event Report (LER)
(NUREG-1022) near 100 percent available power without any significant events.
E-5
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH: AUGUST 2002 DOCKET NO:
50-296 UNIT NAME:
BFN-3 DATE:
September 6, 2002 COMPLETED BY: J. E. Wallace TELEPHONE:
(256) 729-7874 ethod of Licensee Sytem
- om e
C nCActin utg EVent. Report I C,.*Ode e
Re tronc 2 Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training and License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain) 3 Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation of Existing Outage 5-Reduction 9-Other 4 Instructions for Preparation of Data Entry sheets for Licensee Event Report (LER)
(NUREG - 1022)
SUMMARY
Unit 3 has operated at or near 100 percent available power without any significant events.
E-6
'F: Forced S: Scheduled