January 2003 Monthly Operating Report for Browns Ferry
ML030500350
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 02/14/2003
From: Abney T
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
R08 030214746
Download: ML030500350 (9)


Text

R08 030214 746 February 14, 2003 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Stop: OWFN, P1-35 Washington, D.C. 20555-0001 Gentlemen:

In the Matter of ) Docket Nos. 50-259 Tennessee Valley Authority ) 50-260 50-296 BROWNS FERRY NUCLEAR PLANT (BFN) - JANUARY 2003 MONTHLY OPERATING REPORT The enclosure provides the January 2003 Monthly Operating Report (MOR) as required by BFN Technical Specifications, Section 5.6.4.

If you have any questions concerning this report, please call me at (256) 729-2636.

Sincerely, original signed by:

T. E. Abney Manager of Licensing and Industry Affairs Enclosure cc: See page 2

U.S. Nuclear Regulatory Commission Page 2 February 14, 2003 Enclosure cc (Enclosure):

(Via NRC Electronic Distribution)

Mr. Kahtan N. Jabbour, Senior Project Manager U.S. Nuclear Regulatory Commission One White Flint, North (MS 08G9)

Office of Nuclear Reactor Regulation 11555 Rockville Pike Rockville, Maryland 20852-2738 NRC Resident Inspector Browns Ferry Nuclear Plant 10833 Shaw Road Athens, Alabama 35611-6970 Regional Administrator U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, S.W., Suite 23T85 Atlanta, Georgia 30303-8931

U.S. Nuclear Regulatory Commission Page 3 February 14, 2003 DTL:JEW:BAB Enclosure cc (Enclosure):

D. K. Baker, BR 3H-C A. S. Bhatnagar, PAB 1E-BFN M. J. Burzynski, BR 4X-C R. G. Jones, POB 2C-BFN J. E. Maddox, LP 6A-C D. C. Olcsvary, LP 6A-C C. M. Root, PAB 1G-BFN J. R. Rupert, LP 6A-C K. W. Singer, LP 6A-C E. J. Vigluicci ET 11A-K R. E. Wiggall, PEC 2A-BFN NSRB Support, LP 5M-C EDMS-K S:lic/submit/subs/MORJanuary2003.doc

ENCLOSURE TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)

MONTHLY OPERATING REPORT JANUARY 2003 UNIT 1 DOCKET NUMBER 50-259 LICENSE NUMBER DPR-33 UNIT 2 DOCKET NUMBER 50-260 LICENSE NUMBER DPR-52 UNIT 3 DOCKET NUMBER 50-296 LICENSE NUMBER DPR-68

OPERATING DATA REPORT Docket No. 50-259 Unit Name BFN Unit 1 Date February 6, 2003 Completed By J. E. Wallace Telephone (256) 729-7874 Reporting Period January 2003

1. Design Electrical Rating (Net MWe): 1065
2. Maximum Dependable Capacity (MWe-Net) 0 Month Yr-to-Date Cumulative*
3. Number of Hours Reactor was Critical 0 0 59521
4. Hours Generator On-Line 0 0 58267
5. Unit Reserve Shutdown Hours 0 0 0
6. Net Electrical Energy Generated (MWh) 0 0 53,796,427
  • Excludes hours under Administration Hold (June 1, 1985 to Present)

OPERATING DATA REPORT Docket No. 50-260 Unit Name BFN Unit 2 Date February 6, 2003 Completed By J. E. Wallace Telephone (256) 729-7874 Reporting Period January 2003

1. Design Electrical Rating (Net MWe): 1120
2. Maximum Dependable Capacity (MWe-Net) 1118 Month Yr-to-Date Cumulative
3. Number of Hours Reactor was Critical 744 744 149,151
4. Hours Generator On-Line 744 744 146,505
5. Unit Reserve Shutdown Hours 0 0 0
6. Net Electrical Energy Generated (MWh) 687,718 687,718 145,840,444 E-2

OPERATING DATA REPORT Docket No. 50-296 Unit Name BFN Unit 3 Date February 6, 2003 Completed By J. E. Wallace Telephone (256) 729-7874 Reporting Period January 2003

1. Design Electrical Rating (Net MWe): 1120
2. Maximum Dependable Capacity (MWe-Net) 1118 Month Yr-to-Date Cumulative
3. Number of Hours Reactor was Critical 744 744 105,992
4. Hours Generator On-Line 744 744 104,568
5. Unit Reserve Shutdown Hours 0 0 0
6. Net Electrical Energy Generated (MWh) 845,265 845,265 106,828,136 E-3

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH: JANUARY 2003 DOCKET NO: 50-259 UNIT NAME: BFN-1 DATE: February 6, 2003 COMPLETED BY: J. E. Wallace TELEPHONE: (256) 729-7874 No. Date Type1 Duration Reason2 Method of Licensee System Component Cause and Corrective Action to Prevent (Hours) Shutting Event Report Code4 Code4 Recurrence Down No.

Reactor3 1 06/01/85 S 744 F 4 N/A N/A N/A Administrative hold to resolve various TVA and NRC concerns.

1 2 3 4 F: Forced Reason: Method Instructions for Preparation of S: Scheduled A-Equipment Failure (Explain) 1-Manual Data Entry sheets for Licensee B-Maintenance or Test 2-Manual Scram Event Report (LER)

C-Refueling 3-Automatic Scram (NUREG - 1022)

D-Regulatory Restriction 4-Continuation of Existing E-Operator Training and License Outage Examination 5-Reduction F-Administrative 9-Other G-Operational Error (Explain)

H-Other (Explain)

SUMMARY

Unit 1 has been on administrative hold since June 1, 1985.

E-4

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH: JANUARY 2003 DOCKET NO: 50-260 UNIT NAME: BFN-2 DATE: February 6, 2003 COMPLETED BY: J. E. Wallace TELEPHONE: (256) 729-7874 No. Date Type Duration Reason2 Method of Licensee System Component Cause and Corrective Action to Prevent (Hours) Shutting Event Code4 Code4 Recurrence Down Report No.

Reactor3 N/A 1 2 3 4 F: Forced Reason: Method Instructions for Preparation of S: Scheduled A-Equipment Failure (Explain) 1-Manual Data Entry sheets for Licensee B-Maintenance or Test 2-Manual Scram Event Report (LER)

C-Refueling 3-Automatic Scram (NUREG - 1022)

D-Regulatory Restriction 4-Continuation of Existing E-Operator Training and License Outage Examination 5-Reduction F-Administrative 9-Other G-Operational Error (Explain)

H-Other (Explain)

SUMMARY

Unit 2 has operated without any significant events and is coasting down for refueling outage.

E-5

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH: JANUARY 2003 DOCKET NO: 50-296 UNIT NAME: BFN-3 DATE: February 6, 2003 COMPLETED BY: J. E. Wallace TELEPHONE: (256) 729-7874 No. Date Type1 Duration Reason2 Method of Licensee System Component Cause and Corrective Action to Prevent (Hours) Shutting Event Report Code4 Code4 Recurrence Down No.

Reactor3 N/A 1 2 3 4 F: Forced Reason: Method Instructions for Preparation of S: Scheduled A-Equipment Failure (Explain) 1-Manual Data Entry sheets for Licensee B-Maintenance or Test 2-Manual Scram Event Report (LER)

C-Refueling 3-Automatic Scram (NUREG - 1022)

D-Regulatory Restriction 4-Continuation of Existing E-Operator Training and License Outage Examination 5-Reduction F-Administrative 9-Other G-Operational Error (Explain)

H-Other (Explain)

SUMMARY

Unit 3 has operated at or near 100 percent available power without any significant events.

E-6