I It Tennessee Valley Authority, Post Office Box 2000, Decatur, Alabama 35609-2000 April 14, 2003 U.S. Nuclear Regulatory Commission ATTN:
Document Control Desk Mail Stop:
OWFN, P1-35 Washington, D.C. 20555-0001 Gentlemen:
In the Matter of Tennessee Valley Authority
)
Docket Nos.
50-259 50-260 50-296 BROWNS FERRY NUCLEAR PLANT (BFN)
MARCH 2003 MONTHLY OPERATING REPORT The enclosure provides the March 2003 Monthly Operating Report (MOR) as required by BFN Technical Specifications, Section 5.6.4.
If you have any questions concerning this report, please call me at (256) 729-2636.
Sincerel Manager of nsing an ustry ffairs znc osure c:
Se PNnted on ricyced paper
.J-U.S. Nuclear Regulatory Commission Page 2 April 14, 2003 Enclosure cc (Enclosure):
(Via NRC Electronic Distribution)
Mr. Kahtan N. Jabbour, Senior Project Manager U.S. Nuclear Regulatory Commission One White Flint, North (MS 08G9)
Office of Nuclear Reactor Regulation 11555 Rockville Pike Rockville, Maryland 20852-2738 NRC Resident Inspector Browns Ferry Nuclear Plant 10833 Shaw Road Athens, Alabama 35611-6970 Regional Administrator U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, S.W., Suite 23T85 Atlanta, Georgia 30303-8931
ENCLOSURE TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)
MONTHLY OPERATING REPORT MARCH 2003 UNIT 1 DOCKET NUMBER 50-259 LICENSE NUMBER DPR-33 UNIT 2 DOCKET NUMBER 50-260 LICENSE NUMBER DPR-52 UNIT 3 DOCKET NUMBER 50-296 LICENSE NUMBER DPR-68
OPERATING DATA REPORT Docket No.
50-259 Unit Name BFN Unit 1 Date April 3, 2003 Completed By J. E. Wallace Telephone (256) 729-7874 Reporting Period March 2003
- 1. Design Electrical Rating (Net MWe):
- 2.
Maximum Dependable Capacity (MWe-Net) 1065 0
- 3.
Number of Hours Reactor was Critical
- 4.
Hours Generator On-Line
- 5.
Unit Reserve Shutdown Hours
- 6.
Net Electrical Energy Generated (MWh)
Month Yr-to-Date Cumulative*
0 0
59521 0
0 58267 0
0 0
0 0
53,796,427
- Excludes hours under Administration Hold (June 1, 1985 to Present)
OPERATING DATA REPORT Docket No.
50-260 Unit Name BFN Unit 2 Date April 3, 2003 Completed By J. E. Wallace Telephone (256) 729-7874 Reporting Period March 2003
- 1.
Design Electrical Rating (Net MWe):
- 2.
Maximum Dependable Capacity (MWe-Net) 1120 1118 Month Yr-to-Date Cumulative
- 3.
Number of Hours Reactor was Critical
- 4.
Hours Generator On-Line
- 5.
Unit Reserve Shutdown Hours
- 6.
Net Electrical Energy Generated (MWh) 269 1574 149,981 241 1546 147,308 0
0 0
196,148 1,334,570 146,487,296 E-2
d OPERATING DATA REPORT Docket No.
50-296 Unit Name BFN Unit 3 Date April 3,2003 Completed By J. E. Wallace Telephone (256) 729-7874 Reporting Period March 2003
- 1. Design Electrical Rating (Net MWe):
- 2.
Maximum Dependable Capacity (MWe-Net) 1120 1118
- 3.
Number of Hours Reactor was Critical
- 4.
Hours Generator On-Line
- 5.
Unit Reserve Shutdown Hours
- 6.
Net Electrical Energy Generated (MWh)
Month Yr-to-Date Cumulative 744 2160 107,408 744 2160 105,984 0
0 0
829,302 2,352,690 108,335,560 E-3
UNIT SHUTDOWNS REPORT MONTH: MARCH 2003 DOCKET NO:
UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
50-259 BFN-1 April 3, 2003 J. E. Wallace (256) 729-7874 rredive Action to re~
I 06/01/85 S
744 F
4 N/A N/A N/A Administrative hold to resolve various TVA and NRC concerns.
I I
I I__
I
_ 1J
' F: Forced S: Scheduled A2'Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training and License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain) 3Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation of Existing Outage 5-Reduction 9-Other 4Instructions for Preparation of Data Entry sheets for Licensee Event Report (LER)
(NUREG - 1022)
SUMMARY
Unit 1 has been on administrative hold since June 1, 1985.
E-4
UNIT SHUTDOWNS REPORT MONTH: MARCH 2003 DOCKET NO:
UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
nent; I Causs and Cz 50-260 BFN-2 April 3, 2003 J. E. Wallace (256) 729-7874 irrs tivp.Adnn o a
2 3
03/20/03 03/26/03 F
F 119.5 26.4 A
A 2
2 N/A 2003-003-00 N/A AD N/A DRIV On February 24, 2003, at 0900 hours0.0104 days <br />0.25 hours <br />0.00149 weeks <br />3.4245e-4 months <br />, Unit 2 began its Cycle 12 refueling outage. The plant remained in an outage status through March 15, 2003, when the plant was synchronized to the grid at 2104 hours0.0244 days <br />0.584 hours <br />0.00348 weeks <br />8.00572e-4 months <br />.
On March 20, 2003, at 0200 hours0.00231 days <br />0.0556 hours <br />3.306878e-4 weeks <br />7.61e-5 months <br />, the Unit Operator inserted a manual scram for a repair to a feedwvater valve. The plant was sychronized to the grid on March 25, at 0124 hours0.00144 days <br />0.0344 hours <br />2.050265e-4 weeks <br />4.7182e-5 months <br />, after the repair was made.
On March 26, 2003, at 0245 hours0.00284 days <br />0.0681 hours <br />4.050926e-4 weeks <br />9.32225e-5 months <br />, the 2B recirculation pump tripped. The Unit operator inserted a manual scram. The variable frequency driver's trip function for both recirc pumps were defeated. On March 27, 2003, at 0501 hours0.0058 days <br />0.139 hours <br />8.28373e-4 weeks <br />1.906305e-4 months <br />, the plant was again sychronized to the grid.
I I
I I
I I
I I__
'F: Forced
'Reason:
S: Scheduled A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training and License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain)
SUMMARY
Unit 2 had one scheduled
'Method I-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation of Existing Outage 5-Reduction 9-Other 4 Instructions for Preparation of Data Entry sheets for Licensee Event Report (LER)
(NUREG-1022) and two forced shutdowns as noted above.
E-5
UNIT SHUTDOWNS REPORT MONTH: MARCH 2003 Jr DOCKET NO:
UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
50-296 BFN-3 April 3, 2003 J. E. Wallace (256) 729-7874 No.
atL
....... Dt.r....n.R...si N/A i F: Forced S: Scheduled 2 Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training and License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain) 3 Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation of Existing Outage 5-Reduction 9-Other 4 Instructions for Preparation of Data Entry sheets for Licensee Event Report (LER)
(NUREG - 1022)
SUMMARY
Unit 3 has operated at or near 100 percent available power.