May 2003 Monthly Operating Report for Browns Ferry Nuclear Plant
ML031700591
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 06/09/2003
From: Abney T
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML031700591 (9)


Text

Tennessee Vafley Authority, Post Office Box 2000. Decatur, Alabama 35609-2000 June 9, 2003 U.S. Nuclear Regulatory Commission ATTN:

Document Control Desk Mail Stop:

OWFN, P1-35 Washington, D.C. 20555-0001 Gentlemen:

In the Matter of Tennessee Valley Authority Docket Nos.

)

BROWNS FERRY NUCLEAR PLANT (BFN) - MAY 2003 MONTHLY OPERATING REPORT The enclosure provides the May 2003 Monthly Operating Report (MOR) as required by BFN Technical Specifications, Section 5.6.4.

If you have any questions concerning this me at (256) 729-2636.

report, please call

,.,/I (iredecled/

50-259 50-260 50-296

U.S. Nuclear Regulatory Commission Page 2 June 9, 2003 Enclosure cc (Enclosure):

(Via NRC Electronic Distribution)

Mr. Kahtan N. Jabbour, Senior Project Manager U.S. Nuclear Regulatory Commission One White Flint, North (MS 08G9)

Office of Nuclear Reactor Regulation 11555 Rockville Pike Rockville, Maryland 20852-2738 NRC Resident Inspector Browns Ferry Nuclear Plant 10833 Shaw Road Athens, Alabama 35611-6970 Regional Administrator U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, S.W., Suite 23T85 Atlanta, Georgia 30303-8931

U.S. Nuclear Regulatory Commission Page 3 June 9, 2003 DTL:JEW:BAB Enclosure cc (Enclosure):

D. K. Baker, BR 3H-C A. S. Bhatnagar, PAB 1E-BFN M. J. Burzynski, BR 4X-C J. E. Maddox, LP 6A-C D. C. Olcsvary, LP 6A-C C. M. Root, PAB 1G-BFN J. R. Rupert, NAB 1A-BFN K. W. Singer, LP 6A-C M. D. Skaggs, POB 2C-BFN E. J. Vigluicci ET 11A-K R. E. Wiggall, SAB 1A-BFN NSRB Support, LP 5M-C EDMS-K S: lic/submit/subs/MORMAY03.doc

ENCLOSURE TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)

MONTHLY OPERATING REPORT MAY 2003 UNIT 1 DOCKET NUMBER 50-259 LICENSE NUMBER DPR-33 UNIT 2 DOCKET NUMBER 50-260 LICENSE NUMBER DPR-52 UNIT 3 DOCKET NUMBER 50-296 LICENSE NUMBER DPR-68

OPERATING DATA REPORT Docket No.

50-259 Unit Name BFN Unit 1 Date June 4, 2003 Completed By J. E. Wallace Telephone (256) 729-7874 Reporting Period May 2003

1. Design Electrical Rating (Net MWe):
2.

Maximum Dependable Capacity (MWe-Net)

3.

Number of Hours Reactor was Critical

4.

Hours Generator On-Line

5.

Unit Reserve Shutdown Hours

6.

Net Electrical Energy Generated (MWh)

Month Yr-to-Date Cumulative*

0 0

59521 o

o 58267 o

o 0

0 0

53,796,427

  • Excludes hours under Administration Hold (June 1, 1985 to Present)

OPERATING DATA REPORT Docket No.

50-260 Unit Name BFN Unit 2 Date June 4, 2003 Completed By J. E. Wallace Telephone (256) 729-7874 Reporting Period May 2003

1. Design Electrical Rating (Net MWe):
2.

Maximum Dependable Capacity (MWe-Net) 1120 1118

3.

Number of Hours Reactor was Critical

4.

Hours Generator On-Line

5.

Unit Reserve Shutdown Hours

6.

Net Electrical Energy Generated (MWh)

Month Yr-to-Date Cumulative 744 3037 151,444 744 3009 148,771 0

0 0

843,446 2,951,550 148,104,276 E-2 1065 0

OPERATING DATA REPORT Docket No.

50-296 Unit Name BFN Unit 3 Date June 4, 2003 Completed By J. E. Wallace Telephone (256) 729-7874 Reporting Period May 2003

1. Design Electrical Rating (Net MWe):
2.

Maximum Dependable Capacity (MWe-Net)

3.

Number of Hours Reactor was Critical

4.

Hours Generator On-Line

5.

Unit Reserve Shutdown Hours

6.

Net Electrical Energy Generated (MWh)

Month Yr-to-Date Cumulative 744 3623 108,871 744 3623 107,447 0

0 0

836,531 4,001,177 109,984,048 E-3 1120 1118

UNIT SHUTDOWNS REPORT MONTH: MAY 2003 DOCKET NO:

UNIT NAME:

DATE:

COMPLETED BY:

TF.I1 ^spRnNv-50-259 BFN-1 June 4, 2003 J. E. Wallace (11qr%'%71Q-7Q7A L

J.

' Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatoiy Restriction E4Operator Training / License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain)

JfMethod I-Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-Continuation Outage 5Xther (Explain)

SUMMARY

Unit 1 has been on administrative hold since June 1, 1985.

E-4

UNIT SHUTDOWNS REPORT MONTH: MAY 2003 DOCKET NO:

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

50-260 BFN-2 June 4, 2003 J. E. Wallace (2561 729-7874

'Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training / License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain) 2Method I-Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-Continuation Outage S-Other (Explain)

SUMMARY

Unit 2 has operated at or near 100 percent available power.

E-5 io

. Dae
yp Drtio deo 1 ; M.o :f Cas nd Cor;tv A:lnt rvetRcre I X l

Es: FIorced..

i Ott Shutting

/.A.

N/A j

UNIT SHUTDOWNS REPORT MONTH: MAY 2003 DOCKET NO:

UNIT NAME:

DATE:

COMPLETED BY:

50-296 BFN-3 June 4, 2003 J. E. Wallace

' Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatoiy Restriction E-Operator Training I License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain) 2 Method I-Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-Continuation Outage 5-Other (Explain)

SUMARY:

Unit 3 has operated at or near 100 percent available power.

E-6