Tennessee Valley Authority, Post Office Box 2000, Decatur, Alabama 35609-2000 November 14, 2002 U.S. Nuclear Regulatory Commission ATTN:
Document Control Desk Mail Stop OWFN, P1-35 Washington, D.C. 20555-0001 Gentlemen:
In the Matter of Tennessee Valley Authority Docket Nos.
50-259 50-260 50-296 BROWNS FERRY NUCLEAR PLANT (BFN)
OCTOBER 2002 MONTHLY OPERATING REPORT The enclosure provides the October 2002 Monthly Operating Report (MOR) as required by BFN Technical Specifications Section 5.6.4.
If you have any questions concerning this report, please call me at (256) 729-2636.
Prnted on recycled paper
) )
U.S. Nuclear Regulatory Commission Page 2 November 14, 2002 Enclosure cc (Enclosure):
(Via NRC Electronic Distribution)
Mr. Kahtan N. Jabbour, Senior Project Manager U.S. Nuclear Regulatory Commission One White Flint, North (MS 08G9)
Office of Nuclear Reactor Regulation 11555 Rockville Pike Rockville, Maryland 20852-2738 NRC Resident Inspector Browns Ferry Nuclear Plant 10833 Shaw Road Athens, Alabama 35611-6970 Regional Administrator U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, S.W.,
Suite 23T85 Atlanta, Georgia 30303-8931
ENCLOSURE TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)
MONTHLY OPERATING REPORT OCTOBER 2002 UNIT 1 DOCKET NUMBER 50-259 LICENSE NUMBER DPR-33 UNIT 2 DOCKET NUMBER 50-260 LICENSE NUMBER DPR-52 UNIT 3 DOCKET NUMBER 50-296 LICENSE NUMBER DPR-68
Docket No.
50-259 Unit Name BFN Unit 1 Date November 4, 2002 Completed By J. E. Wallace Telephone (256) 729-7874 Reporting Period October 2002
- 1.
Design Electrical Rating (Net MWe):
- 2.
Maximum Dependable Capacity (MWe-Net)
- 3.
Number of Hours Reactor was Critical
- 4.
Hours Generator On-Line
- 5.
Unit Reserve Shutdown Hours
- 6.
Net Electrical Energy Generated (MWh)
Month Yr-to-Date Cumulative*
0 0
59521 0
0 58267 0
0 0
0 0
53,796,427
- Excludes hours under Administration Hold (June 1, 1985 to Present)
OPERATING DATA REPORT Docket No.
50-260 Unit Name BFN Unit 2 Date November 4, 2002 Completed By J. E. Wallace Telephone (256) 729-7874 Reporting Period October 2002
- 1. Design Electrical Rating (Net MWe):
- 2.
Maximum Dependable Capacity (MWe-Net) 1120 1118
- 3.
Number of Hours Reactor was Critical
- 4.
Hours Generator On-Line
- 5.
Unit Reserve Shutdown Hours
- 6.
Net Electrical Energy Generated (MWh)
Month Yr-to-Date Cumulative 745 7,296 190,735 509 6,806 144,297 0
0 0
474,935 7,350,333 143,591,798 E-2 OPERATING DATA REPORT 1065 0
p OPERATING DATA REPORT Docket No Unit Name 50-296 BFN Unit 3 Date November 4, 2002 Completed By J. E. Wallace Telephone (256) 729-7874 Reporting Period October 2002
- 1. Design Electrical Rating (Net MWe):
- 2.
Maximum Dependable Capacity (MWe-Net) 1120 1118
- 3.
Number of Hours Reactor was Critical
- 4.
Hours Generator On-Line
- 5.
Unit Reserve Shutdown Hours
- 6.
Net Electrical Energy Generated (MWh)
Month Yr-to-Date Cumulative 745 6,954 103,784 745 6,943 102,360 0
0 0
838,220 7,602,434 104,325,226 E-3
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH: OCTOBER 2002 1
06/01/85
'F: Forced S: Scheduled S
Su ttin VIe
' or.:
745 F
'Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training and License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain) 4 ensee........
N/A DOCKET NO:
UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
50-259 BFN-I November 4, 2002 J. E. Wallace (256) 729-7874
.Syste
. C.amponent Ca"useand C6r Code Cod.
fLeUrrec
.i i "c d*
.++"'+'*I;!:e
'*i
il
.*:,,'+,iii+i........*,iiii t :*!++i~:iiii'
- iii:*:**;*+:;iii:i;*¢
- ~i;
- ~i~i~:iiiiiii~i:!.::i:ll!:
ii:+: i:
- ii:i:i:i:::!:;;!.:....... ++ ; :::
N/A 3Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation of Existing Outage 5-Reduction 9-Other N/A Administrative hold to resolve various TVA and NRC concerns.
44 Instructions for Preparation of Data Entry sheets for Licensee Event Report (LER)
(NUREG - 1022)
SUMMARY
Unit 1 has been on administrative hold since June 1, 1985.
E4 I
I
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH: OCTOBER 2002 DOCKET NO:
UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
50-260 BFN-2 November 4, 2002 J. E. Wallace (256) 729-7874 "I.......... i 5
10/19/02
'F: Forced
' F: Forced S: Scheduled
SUMMARY
S
'Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training and License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain)
Unit 2 operated at reduced Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation of Existing Outage 5-Reduction 9-Other At 0400 hours0.00463 days <br />0.111 hours <br />6.613757e-4 weeks <br />1.522e-4 months <br />, Unit 2 was manually scrammed for a mid-cycle outage to replace leaking fuel bundles. On October 29, 2002, at 0001 hours1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, the main generator breaker was closed tying generator to main grid. On October 31, 2002, at 2359 hours0.0273 days <br />0.655 hours <br />0.0039 weeks <br />8.975995e-4 months <br />, the Unit 2 reactor was at 88 percent power.
4 Instructions for Preparation of Data Entry sheets for Licensee Event Report (LER)
(NUREG - 1022) power until the mid-cycle outage for fuel replacement on October 19, 2002.
E-5
wC CD
~ 0 CDn 0~
0 o
CD I-,
Ft In 0
C3 rt ti 0
r-1 I-.
0 0
CD I-.
CD 0
A CD 0
-.a m.z.,......
'0 Ud0 CCDiOC
-t0 CD CCD
.0o z
C12 H
0 z
z 0
H 0 z ri
0 H
0 z H
0
(1 H
0 0
0 z
z
Io tTl 0 H 0:
0 0
IL 00 zý 0
CD CD i1 C0 (D
k)j 0
CD I