ML021130496

From kanterella
Jump to navigation Jump to search
March 2002 Monthly Operating Report for Browns Ferry Units 1, 2 & 3
ML021130496
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 04/11/2002
From: Abney T
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML021130496 (8)


Text

Tennessee Valley Authority, Post Office Box 2000, Decatur, Alabama 35609-2000 April 11, 2002 U.S. Nuclear Regulatory Commission ATTN:

Document Control Desk Mail Stop OWFN, P1-35 Washington, D.C.

20555-0001 Gentlemen:

In the Matter of

)

Docket Nos.

50-259 Tennessee Valley Authority

)

50-260 50-296 BROWNS FERRY NUCLEAR PLANT (BFN)

MARCH 2002 MONTHLY OPERATING REPORT The enclosure provides the March 2002 Monthly Operating Report (MOR) as required by BFN Technical Specifications Section 5.6.4.

If you have any questions concerning this report, please call me at (256) 729-2636.

S' cere ncere*

T.

E ney Manager o icensng and dustry Af airs Enclosure cc:

See 5age2 Pitdon recycled paper J1

U.S. Nuclear Regulatory Commission Page 2 April 11, 2002 Enclosure cc (Enclosure):

(Via NRC Electronic Distribution)

Mr.

Kahtan N.

Jabbour, Senior Project Manager U.S. Nuclear Regulatory Commission One White Flint, North (MS 08G9)

Office of Nuclear Reactor Regulation 11555 Rockville Pike Rockville, Maryland 20852-2738 NRC Resident Inspector Browns Ferry Nuclear Plant P.O. Box 149 Athens, Alabama 35611 Regional Administrator U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, S.W.,

Suite 23T85 Atlanta, Georgia 30303-8931

ENCLOSURE 1 TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)

MONTHLY OPERATING REPORT MARCH 2002 UNIT 1 DOCKET NUMBER 50-259 LICENSE NUMBER DPR-33 UNIT 2 DOCKET NUMBER 50-260 LICENSE NUMBER DPR-52 UNIT 3 DOCKET NUMBER 50-296 LICENSE NUMBER DPR-68

OPERATING DATA REPORT Docket No.

50-259 Unit Name BFN Unit 1 Date April 5, 2002 Completed By J. E. Wallace Telephone (256) 729-7874 Reporting Period March 2002

1.

Design Electrical Rating (Net MWe):

2.

Maximum Dependable Capacity (MWe-Net)

3.

Number of Hours Reactor was Critical

4.

Hours Generator On-Line

5.

Unit Reserve Shutdown Hours

6.

Net Electrical Energy Generated (MWh)

Month Yr-to-Date Cumulative*

0 0

59521 0

0 58267 0

0 0

0 0

53,796,427

  • Excludes hours under Administration Hold (June 1, 1985 to Present)

OPERATING DATA REPORT Docket No.

50-260 Unit Name BFN Unit 2 Date April 5, 2002 Completed By J. E. Wallace Telephone (256) 729-7874 Reporting Period March 2002

1. Design Electrical Rating (Net MWe):
2.

Maximum Dependable Capacity (MWe-Net) 1120 1118

3.

Number of Hours Reactor was Critical

4.

Hours Generator On-Line

5.

Unit Reserve Shutdown Hours

6.

Net Electrical Energy Generated (MWh)

Month Yr-to-Date Cumulative 744 2160 142,269 744 2160 139,652 0

0 0

818,668 2,427,088 138,668,553 E-2 1065 0

OPERATING DATA REPORT Docket No.

50-296 Unit Name BFN Unit 3 Date April 5, 2002 Completed By J. E. Wallace Telephone (256) 729-7874 Reporting Period March 2002

1. Design Electrical Rating (Net MWe):
2.

Maximum Dependable Capacity (MWe-Net)

3.

Number of Hours Reactor was Critical

4.

Hours Generator On-Line

5.

Unit Reserve Shutdown Hours

6.

Net Electrical Energy Generated (MWh)

Month Yr-to-Date Cumulative 609 2,025 98,855 609 2,025 97,441 0

0 0

602,045 2,191,939 98,914,731 E-3 1120 1118

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH: MARCH 2002 DOCKET NO:

UNIT NAME:

DATE:

COMPLETED BY:

TVFT.UPl=I VU-*lh*

50-259 BFN-1 April 5, 2002 J. E. Wallace O% Q-O'7R7, 1

06/01/85 S

744 F

4 N/A N/A N/A

.1. __________

1 _______

J.

I I

A I

A

'F: Forced S: Scheduled 2 Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training and License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain)

-'Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation of Existing Outage 5-Reduction 9-Other Administrative hold to resolve various TVA and NRC concerns.

4 Instructions for Preparation of Data Entry sheets for Licensee Event Report (LER)

(NUREG - 1022)

SUNRVMARY:

Unit 1 has been on administrative hold since June 1, 1985.

E-4

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH: MARCH 2002 DOCKET NO:

UNIT NAME:

DATE:

COMPLETED BY:

50-260 BFN-2 APRIL 5, 2002 J. E. Wallace I

03/21/02 1F: Forced

' F: Forced S: Scheduled

SUMMARY

S 0

B

'Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training and License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain)

Unit 2 has operated near 5

N/A N/A 3 Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation of Existing Outage 5-Reduction 9-Other N/A Power reduction to perform Control Rod Suppression testing.

4 Instructions for Preparation of Data Entry sheets for Licensee Event Report (LER)

(NUREG-1022) 100 percent power without any significant events with the exception noted above.

E-5

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH: MARCH 2002 DOCKET NO:

UNIT NAME:

DATE:

COMPLETED BY:

T'h'T VIDUcn1rr.

50-296 BFN-3 APRIL 5, 2002 J. E. Wallace tlr~rý 0'72)-77A 1

03/26/02 S

135 C

2 N/A N/A N/A I _________

I ______

J __________

I _________

L ___________

I ______________

4. ________

.1 The unit was manually scrammed at 0859 hours0.00994 days <br />0.239 hours <br />0.00142 weeks <br />3.268495e-4 months <br /> on March 26, 2002, to begin the Cycle 10 refueling outage.

2 Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training and License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain) 3 Method 1 -Manual 2-Manual Scram 3-Automatic Scram 4-Continuation of Existing Outage 5-Reduction 9-Other Instructions for Preparation of Data Entry sheets for Licensee Event Report (LER)

(NUREG - 1022)

SUMMARY

Unit 3 has operated at or near 100 percent available power until the unit shut down for refueling.

E-6 IF: Forced S: Scheduled