ML023600032
| ML023600032 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 12/12/2002 |
| From: | Abney T Tennessee Valley Authority |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| Download: ML023600032 (8) | |
Text
Tennessee Valley Authonty, Post Office Box 2000, Decatur, Alabama 35609-2000 December 12, 2002 U.S. Nuclear Regulatory Commission ATTN:
Document Control Desk Mail Stop:
- OWFN, Pl-35 Washington, D.C. 20555-0001 Gentlemen:
In the Matter of Tennessee Valley Authority Docket Nos.
50-259 50-260 50-296 BROWNS FERRY NUCLEAR PLANT (BFN)
NOVEMBER 2002 MONTHLY OPERATING REPORT The enclosure provides the November-2002 Monthly Operating Report (MOR) as required by BFN Technical Specifications Section 5.6.4.
If you have any questions concerning this report, please call me at (256) 729-2636.
T. E Abbhey "**
Manager of Ljen and IAstry Affairs Prated on recycled paper
) )
- 1.
U.S. Nuclear Regulatory Commission Page 2 December 12, 2002 Enclosure cc (Enclosure):
(Via NRC Electronic Distribution)
Mr. Kahtan N. Jabbour, Senior Project Manager U.S. Nuclear Regulatory Commission One White Flint, North (MS 08G9)
Office of Nuclear Reactor Regulation 11555 Rockville Pike Rockville, Maryland 20852-2738 NRC Resident Inspector Browns Ferry Nuclear Plant 10833 Shaw Road Athens, Alabama 35611-6970 Regional Administrator U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, S.W.,
Suite 23T85 Atlanta, Georgia 30303-8931
ENCLOSURE TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)
MONTHLY OPERATING REPORT NOVEMBER 2002 UNIT I DOCKET NUMBER 50-259 LICENSE NUMBER DPR-33 UNIT 2 DOCKET NUMBER 50-260 LICENSE NUMBER DPR-52 UNIT 3 DOCKET NUMBER 50-296 LICENSE NUMBER DPR-68
.-v OPERATING DATA REPORT Docket No.
50-259 Unit Name BFN Unit 1 Date December 5, 2002 Completed By J. E Wallace Telephone (256) 729-7874 Reporting Period November 2002
- 1. Design Electrical Rating (Net MWe):
- 2.
Maximum Dependable Capacity (MWe-Net)
Yr-to-Date Cumulative*
- 3.
Number of Hours Reactor was Critical
- 4.
Hours Generator On-Line
- 5.
Unit Reserve Shutdown Hours
- 6.
Net Electrical Energy Generated (MWh) 0
- Excludes hours under Administration Hold (June 1, 1985 to Present)
Docket No.
50-260 Unit Name BFN Unit 2 Date December 5, 2002 Completed By J. E. Wallace Telephone (256) 729-7874 Reporting Period November 2002
- 1.
Design Electrical Rating (Net MWe):
- 2.
Maximum Dependable Capacity (MWe-Net)
Yr-to-Date Cumulative
- 3.
Number of Hours Reactor was Critical
- 4.
Hours Generator On-Line
- 5.
Unit Reserve Shutdown Hours
- 6.
Net Electrical Energy Generated (MWh) 720 7,554 147,663 720 7,526 145,017 0
0 0
785,730 8,136,063 144,377,528 E-2 1065 0
Month 0
0 59521 0
0 58267 0
0 0
0 53,796,427 OPERATING DATA REPORT 1120 1118 Month
Docket No 50-296 Unit Name BFN Unit 3 Date December 5, 2002 Completed By J. E. Wallace Telephone (256) 729-7874 Reporting Period November 2002
- 1. Design Electrical Rating (Net MWe):
- 2.
Maximum Dependable Capacity (MWe-Net)
Yr-to-Date Cumulative
- 3.
Number of Hours Reactor was Critical
- 4.
Hours Generator On-Line
- 5.
Unit Reserve Shutdown Hours
- 6.
Net Electrical Energy Generated (MWh) 720 7,674 104,504 720 7,663 103,080 0
0 0
815,742 8,418,175 105,140,968 E-3 OPERATING DATA REPORT 1120 1118 Month
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH: NOVEMBER 2002 DOCKET NO:
UNIT NAME:
DATE:
COMPLETED TELEPHONE:
50-259 BFN-1 December 5, 2002 BY: J. E. Wallace (256) 729-7874 "L
Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training and License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain)
"Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation of Existing Outage 5-Reduction 9-Other "Instructions for Preparation of Data Entry sheets for Licensee Event Report (LER)
SUMMARY
Unit 1 has been on administrative hold since June 1, 1985.
E-4 No. ate Type Dui Reason Method f eeSystem Co)mponent Cause and Corrective Action to. Prevent o.r.)eShutting Ewei nRepott Code4 CAde Recurrence,..
Reactor3 1
06/01/85 S
720 F
4 N/A N/A N/A Administrative hold to resolve various TVA and NRC concerns.
'F: Forced S: Scheduled
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH: NOVEMBER 2002 DOCKET NO:
UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
50-260 BFN-2 December 5, 2002 J. E. Wallace (256) 729-7874 A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training and License Examination F-Administrative G-Operational Enror (Explain)
H-Other (Explain) 1 -Manual 2-Manual Scram 3-Automatic Scram 4-Continuation of Existing Outage 5-Reduction 9-Other Data Entry sheets for Licensee Event Report (LER)
SUMMARY
Unit 2 operated 100 percent power except as noted above.
E-5 Unit 2 began coastdown for refueling outage.
No.
Date TypeT DrA Method of,.censee System.ý Component Cause and Corrective Action ton P'vent (H
.rs)
Sbutti"ng E
Code 4 Code' Recurrence,...
J~owR Rport No.'
6 11/12/02 S
N/A A
5 N/A N/A N/A At 1730 hours0.02 days <br />0.481 hours <br />0.00286 weeks <br />6.58265e-4 months <br />, Unit 2 reduced power level to 77 percent to troubleshoot and repair the 2C1 high pressure heater level control valve. Unit 2 was returned to 100 percent power at 2030 hours0.0235 days <br />0.564 hours <br />0.00336 weeks <br />7.72415e-4 months <br /> on November 15, 2002.
1F: Forced LReann:
J Methnd 4 Instructions fnr Prpneratinn nf S: Scheduled I
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH: NOVEMBER 2002 DOCKET NO:
UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
50-296 BFN-3 December 5, 2002 J. E. Wallace (256) 729-7874 2 Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training and License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain) 3 Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation of Existing Outage 5-Reduction 9-Other Instructions for Preparation of Data Entry sheets for Licensee Event Report (LER)
(NUREG - 1022)
SUMMARY
Unit 3 has operated at or near 100 percent available power without any significant events.
E-6 NToype.,
Duration ReasOn 2.,, TMethod of-licesee Systemn" Component, Cause and Corrective nto Prevent
(......'.
Shutting L...Rt:enorr CodCo d eode4
..ecurrence "i'olvn' No.
N/A 1F: Forced S: Scheduled