ML030560738
| ML030560738 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 02/14/2003 |
| From: | Abney T Tennessee Valley Authority |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| Download: ML030560738 (8) | |
Text
Tennessee Valley Authonty, Post Office Box 2000, Decatur, Alabama 35609-2000 February 14, 2003 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Stop: OWFN, Pl-35 Washington, D.C. 20555-0001 Gentlemen:
In the Matter of ) Docket Nos. 50-259 Tennessee Valley Authority 50-260 50-296 BROWNS FERRY NUCLEAR PLANT (BFN) - JANUARY 2003 MONTHLY OPERATING REPORT The enclosure provides the January 2003 Monthly Operating Report (MOR) as required by BFN Technical Specifications, Section 5.6.4.
If you have any questions concerning this report, please call me at (256) 729-2636.
rs q,
Pnnted om recycled paper
U.S. Nuclear Regulatory Commission Page 2 February 14, 2003 Enclosure cc (Enclosure):
(Via NRC Electronic Distribution)
Mr. Kahtan N. Jabbour, Senior Project Manager U.S. Nuclear Regulatory Commission One White Flint, North (MS 08G9)
Office of Nuclear Reactor Regulation 11555 Rockville Pike Rockville, Maryland 20852-2738 NRC Resident Inspector Browns Ferry Nuclear Plant 10833 Shaw Road Athens,. Alabama 35611-6970 Regional Administrator U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, S.W., Suite 23T85 Atlanta, Georgia 30303-8931
MONTHLY OPERATING REPORT JANUARY 2003 UNIT 1 DOCKET NUMBER 50-259 LICENSE NUMBER DPR-33 UNIT 2 DOCKET NUMBER 50-260 LICENSE NUMBER DPR-52 UNIT 3 DOCKET NUMBER 50-296 LICENSE NUMBER DPR-68
OPERATING DATA REPORT Docket No. 50-259 Unit Name BFN Unit 1 Date February 6, 2003 Completed By J. E. Wallace Telephone (256) 729-7874 Reporting Period January 2003
- 1. Design Electrical Rating (Net MWe): 1065
- 2. Maximum Dependable Capacity (MWe-Net) 0 Month Yr-to-Date Cumulative*
- 3. Number of Hours Reactor was Critical 0 0 59521
- 4. Hours Generator On-Line 0 0 58267
- 5. Unit Reserve Shutdown Hours 0 0 0
- 6. Net Electrical Energy Generated (MWh) 0 0 53,796,427
- Excludes hours under Administration Hold (June 1, 1985 to Present)
OPERATING DATA REPORT Docket No. 50-260 Unit Name BFN Unit 2 Date February 6, 2003 Completed By J. E. Wallace Telephone (256) 729-7874 Reporting Period January 2003
- 1. Design Electrical Rating (Net MWe): 1120
- 2. Maximum Dependable Capacity (MWe-Net) 1118 Month Yr-to-Date Cumulative
- 3. Number of Hours Reactor was Critical 744 744 149,151
- 4. Hours Generator On-Line 744 744 146,505
- 5. Unit Reserve Shutdown Hours 0 0 0
- 6. Net Electrical Energy Generated (MWh) 687,718 687,718 145,840,444 E-2
k, 1--e OPERATING DATA REPORT Docket No. 50-296 Unit Name BFN Unit 3 Date February 6, 2003 Completed By J. E. Wallace Telephone (256) 729-7874 Reporting Period January 2003
- 1. Design Electrical Rating (Net MWe): 1120
- 2. Maximum Dependable Capacity (MWe-Net) 1118 Month Yr-to-Date Cumulative
- 3. Number of Hours Reactor was Critical 744 744 105,992
- 4. Hours Generator On-Line 744 744 104,568
- 5. Unit Reserve Shutdown Hours 0 0 0
- 6. Net Electrical Energy Generated (MWh) 845,265 845,265 106,828,136 E-3
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH: JANUARY 2003 DOCKET NO: 50-259 UNIT NAME: BFN-1 DATE: February 6, 2003 COMPLETED BY: J. E. Wallace TELEPHONE: (256) 729-7874 Datei.!.ii Type1 .,Duration' so....,.Method of .Licenseeii:i:i::ii::
Re
..... Syst emnt.* Component ....Cause nd Crrective.Acti to ... ire.t...
S(H*ou .... Si"htti*n*g*-g',.ý:,;`,!;,::,: Event Repor".t Co de 4.
No.'........................
ii~ii!*::: Re..rre.. ...........
- 3 *ii~iii~ *:
~~ii*
t t I I
.1Reactor I 1 06/01/85 S 744 F 4 N/A N/A N/A Administrative hold to resolve various TVA and NRC concerns.
3 4 Instructions
'F: Forced Z Reason: Method for Preparation of S: Scheduled A-Equipment Failure (Explain) 1-Manual Data Entry sheets for Licensee B-Maintenance or Test 2-Manual Scram Event Report (LER)
C-Refueling 3-Automatic Scram (NUREG - 1022)
D-Regulatory Restriction 4-Continuation of Existing E-Operator Training and License Outage Examination 5-Reduction F-Administrative 9-Other G-Operational Error (Explain)
H-Other (Explain)
SUMMARY
- Unit 1 has been on administrative hold since June 1, 1985.
E-4
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH: JANUARY 2003 DOCKET NO: 50-260 UNIT NAME: BFN-2 DATE: February 6, 2003 COMPLETED BY: J. E. Wallace TELEPHONE:
(256) 729-7874 ..........
D ate.. .. ......ype urn ion Metho'd of n e, Sy"stm" ornponen t G. §` A"d C&ftdiv "Aifti" c iowt""T 6--- re-ve t"
-X -X ........ tfin",
Xowa.;< Sh* 16,ven t C"A od" X
- 9. . .................
..... X-X. ... X-X.X-X-X.X.-1 1 X-.1 X.
.............. ar- 6 ............
_X-IM N/A
- F: Forced Reason: Method Instructions for Preparation of S: Scheduled A-Equipment Failure (Explain) 1-Manual Data Entry sheets for Licensee B-Maintenance or Test 2-Manual Scram Event Report (LER)
C-Refueling 3-Automatic Scram (NUREG - 1022)
D-Regulatory Restriction 4-Continuation of Existing E-Operator Training and License Outage Examination 5-Reduction F-Administrative 9-Other G-Operational Error (Explain)
H-Other (Explain)
SUMMARY
- Unit 2 has operated without any significant events and is coasting down for refueling outage.
E-5
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH: JANUARY 2003 DOCKET NO: 50-296 I UNIT NAME: BFN-3 DATE: February 6, 2003 COMPLETED BY: J. E. Wallace TELEPHONE: (256) 729-7874 Durationf. ReasonW., ...Method of
- ..:i.......
"Da Type.
iiiiii~iiiii (flou s) "i .i l~iiiiiii i! 2icens eei.ii:ii,. steni.. Sys Cau
- nd Correctiv"*Actiontjo Prevent Re. enc ........... .rr ...
.Sh~utting-'-:,,': Event"Reiort . ....... .. :..
Down 3 N..................... C........ .
.Reactor*:!*i:!~i:!!
I 4-.
. .. . . . . . .. *..I : .. 4-...*....
.. :.. . . *...:...¢.
N/A 2
iF: Forced Reason: 3Method 4 Instructions for Preparation of S: Scheduled A-Equipment Failure (Explain) 1-Manual Data Entry sheets for Licensee B-Maintenance or Test 2-Manual Scram Event Report (LER)
C-Refueling 3-Automatic Scram (NUREG - 1022)
D-Regulatory Restriction 4-Continuation of Existing E-Operator Training and License Outage Examination 5-Reduction F-Administrative 9-Other G-Operational Error (Explain)
H-Other (Explain)
SUMMARY
- Unit 3 has operated at or near 100 percent available power without any significant events.
E-6