Tennessee Valley Authority, Post Office Box 2000, Decatur, Alabama 35609-2000 March 12, 2002 U.S. Nuclear Regulatory Commission ATTN:

Document Control Desk Mail Stop OWFN, P1-35 Washington, D.C.

20555-0001 Gentlemen:

In the Matter of Tennessee Valley Authority Docket Nos.

50-259 50-260 50-296 BROWNS FERRY NUCLEAR PLANT (BFN)

FEBRUARY 2002 MONTHLY OPERATING REPORT The enclosure provides the February 2002 Monthly Operating Report (MOR) as required by BFN Technical Specifications Section 5.6.4.

Only one paper copy of this document is being sent to the NRC Document Control Desk.

If you have any questions concerning this report, please call me at (256) 729-2636.

Prnted on recycled paper

) )

U.S. Nuclear Regulatory Commission Page 2 March 12, 2002 Enclosure cc (Enclosure):

(Via NRC Electronic Distribution)

Mr.

Kahtan N.

Jabbour, Senior Project Manager U.S. Nuclear Regulatory Commission One White Flint, North (MS 08G9)

Office of Nuclear Reactor Regulation 11555 Rockville Pike Rockville, Maryland 20852-2738 NRC Resident Inspector Browns Ferry Nuclear Plant P.O. Box 149 Athens, Alabama 35611 Regional Administrator U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, S.W.,

Suite 23T85 Atlanta, Georgia 30303-8931

ENCLOSURE 1 TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)

MONTHLY OPERATING REPORT FEBRUARY 2002 UNIT 1 DOCKET NUMBER 50-259 LICENSE NUMBER DPR-33 UNIT 2 DOCKET NUMBER 50-260 LICENSE NUMBER DPR-52 UNIT 3 DOCKET NUMBER 50-296 LICENSE NUMBER DPR-68

Docket No.

50-259 Unit Name BFN Unit 1 Date March 5, 2002 Completed By J. E. Wallace Telephone (256) 729-7874 Reporting Period February 2002

1.

Design Electrical Rating (Net MWe):

2.

Maximum Dependable Capacity (MWe-Net)

3.

Number of Hours Reactor was Critical

4.

Hours Generator On-Line

5.

Unit Reserve Shutdown Hours

6.

Net Electrical Energy Generated (MWh)

Month Yr-to-Date Cumulative*

0 0

59521 0

0 58267 0

0 0

0 0

53,796,427

  • Excludes hours under Administration Hold (June 1, 1985 to Present)

OPERATING DATA REPORT Docket No.

50-260 Unit Name BFN Unit 2 Date March 5, 2002 Completed By J. E. Wallace Telephone (256) 729-7874 Reporting Period February 2002

1. Design Electrical Rating (Net MWe):
2.

Maximum Dependable Capacity (MWe-Net) 1120 1118

3.

Number of Hours Reactor was Critical

4.

Hours Generator On-Line

5.

Unit Reserve Shutdown Hours

6.

Net Electrical Energy Generated (MWh)

Month Yr-to-Date Cumulative 672 1416 141,525 672 1416 138,908 0

0 0

767,114 1,608,420 137,849,885 E-2 OPERATING DATA REPORT 1065 0

Docket No.

50-296 Unit Name BFN Unit 3 Date March 5 2002 Completed By J. E. Wallace Telephone (256) 729-7874 Reporting Period February 2002

1.

Design Electrical Rating (Net MWe):

2.

Maximum Dependable Capacity (MWe-Net)

3.

Number of Hours Reactor was Critical

4.

Hours Generator On-Line

5.

Unit Reserve Shutdown Hours

6.

Net Electrical Energy Generated (MWh)

Month Yr-to-Date Cumulative 672 1416 98,246 672 1416 96,832 0

0 0

745,791 1,589,894 98,312,686 E-3 OPERATING DATA REPORT 1120 1118

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH: FEBRUARY 2002 DOCKET NO:

UNIT NAME:

DATE:

COMPLETED BY:

TJ*.

Pi4P n

.1VP 1

06/01/85 S

672 F

4 N/A N/A I

L L ___________

i 1F: Forced S: Scheduled 2 Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training and License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain) 3Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation of Existing Outage 5-Reduction 9-Other N/A 50-259 BFN-1 March 5 2002 J. E. Wallace

;' 79Q.7R7A Administrative hold to resolve various TVA and NRC concerns.

4 Instructions for Preparation of Data Entry sheets for Licensee Event Report (LER)

(NUREG - 1022)

SUMMARY

Unit 1 has been on administrative hold since June 1, 1985.

E-4

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH: FEBRUARY 2002 DOCKET NO:

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

50-260 BFN-2 MARCH 5, 2002 J. E. Wallace (256) 729-7874 N/A I

I I

J _________

I ___________

I _____________

-j- ________

+/-

'F: Forced 2 Reason:

'Method Instructio S: Scheduled A-Equipment Failure (Explain) 1-Manual Data Enti B-Maintenance or Test 2-Manual Scram Event Rei C-Refueling 3-Automatic Scram (NUREG D-Regulatory Restriction 4-Continuation of Existing E-Operator Training and License Outage Examination 5-Reduction F-Administrative 9-Other G-Operational Error (Explain)

H-Other (Explain)

SUMMARY

Unit 2 has operated near 100 percent power without any significant events.

ns for Preparation of

-y sheets for Licensee port (LER)

- 1022)

E-5 d[

  • UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH: FEBRUARY 2002 DOCKET NO:

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

50-296 BFN-3 MARCH 5, 2002 J. E. Wallace (256) 729-7874 2 Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training and License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain) 3Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation of Existing Outage 5-Reduction 9-Other 4 Instructions for Preparation of Data Entry sheets for Licensee Event Report (LER)

(NUREG - 1022)

SUMMARY

Unit 3 has operated near 100 percent power without any significant events.

E-6 1F: Forced S: Scheduled