March 14, 2003 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Stop: OWFN, P1-35 Washington, D.C. 20555-0001 Gentlemen:
In the Matter of
)
Docket Nos. 50-259 Tennessee Valley Authority
)
50-260 50-296 BROWNS FERRY NUCLEAR PLANT (BFN) - FEBRUARY 2003 MONTHLY OPERATING REPORT The enclosure provides the February 2003 Monthly Operating Report (MOR) as required by BFN Technical Specifications, Section 5.6.4.
If you have any questions concerning this report, please call me at (256) 729-2636.
Sincerely, original signed by:
T. E. Abney Manager of Licensing and Industry Affairs Enclosure cc: See page 2
U.S. Nuclear Regulatory Commission Page 2 March 14, 2003 Enclosure cc (Enclosure):
(Via NRC Electronic Distribution)
Mr. Kahtan N. Jabbour, Senior Project Manager U.S. Nuclear Regulatory Commission One White Flint, North (MS 08G9)
Office of Nuclear Reactor Regulation 11555 Rockville Pike Rockville, Maryland 20852-2738 NRC Resident Inspector Browns Ferry Nuclear Plant 10833 Shaw Road Athens, Alabama 35611-6970 Regional Administrator U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, S.W., Suite 23T85 Atlanta, Georgia 30303-8931
U.S. Nuclear Regulatory Commission Page 3 March 14, 2003 DTL:JEW:BAB Enclosure cc (Enclosure):
D. K. Baker, BR 3H-C A. S. Bhatnagar, PAB 1E-BFN M. J. Burzynski, BR 4X-C R. G. Jones, POB 2C-BFN D. C. Olcsvary, LP 6A-C C. M. Root, PAB 1G-BFN J. R. Rupert, LP 6A-C K. W. Singer, LP 6A-C E. J. Vigluicci ET 11A-K R. E. Wiggall, PEC 2A-BFN NSRB Support, LP 5M-C EDMS-K S:lic/submit/subs/MORFebruary2003.doc
ENCLOSURE TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)
MONTHLY OPERATING REPORT FEBRUARY 2003 UNIT 1 DOCKET NUMBER 50-259 LICENSE NUMBER DPR-33 UNIT 2 DOCKET NUMBER 50-260 LICENSE NUMBER DPR-52 UNIT 3 DOCKET NUMBER 50-296 LICENSE NUMBER DPR-68
E-2 OPERATING DATA REPORT Docket No.
50-259 Unit Name BFN Unit 1 Date March 6, 2003 Completed By J. E. Wallace Telephone (256) 729-7874 Reporting Period February 2003 1.
Design Electrical Rating (Net MWe):
1065 2.
Maximum Dependable Capacity (MWe-Net) 0 Month Yr-to-Date Cumulative*
3.
Number of Hours Reactor was Critical 0
0 59521 4.
Hours Generator On-Line 0
0 58267 5.
Unit Reserve Shutdown Hours 0
0 0
6.
Net Electrical Energy Generated (MWh) 0 0
53,796,427
- Excludes hours under Administration Hold (June 1, 1985 to Present)
OPERATING DATA REPORT Docket No.
50-260 Unit Name BFN Unit 2 Date March 6, 2003 Completed By J. E. Wallace Telephone (256) 729-7874 Reporting Period February 2003 1.
Design Electrical Rating (Net MWe):
1120 2.
Maximum Dependable Capacity (MWe-Net) 1118 Month Yr-to-Date Cumulative 3.
Number of Hours Reactor was Critical 561 1305 149,712 4.
Hours Generator On-Line 561 1305 147,066 5.
Unit Reserve Shutdown Hours 0
0 0
6.
Net Electrical Energy Generated (MWh) 450,704 1,138,422 146,291,148
E-3 OPERATING DATA REPORT Docket No.
50-296 Unit Name BFN Unit 3 Date March 6, 2003 Completed By J. E. Wallace Telephone (256) 729-7874 Reporting Period February 2003 1.
Design Electrical Rating (Net MWe):
1120 2.
Maximum Dependable Capacity (MWe-Net) 1118 Month Yr-to-Date Cumulative 3.
Number of Hours Reactor was Critical 672 1416 106,664 4.
Hours Generator On-Line 672 1416 105,240 5.
Unit Reserve Shutdown Hours 0
0 0
6.
Net Electrical Energy Generated (MWh) 678,123 1,523,388 107,506,259
E-4 UNIT SHUTDOWNS REPORT MONTH: FEBRUARY 2003 DOCKET NO:
50-259 UNIT NAME:
BFN-1 DATE:
March 6, 2003 COMPLETED BY: J. E. Wallace TELEPHONE:
(256) 729-7874 No.
Date Type1 Duration (Hours)
Reason2 Method of Shutting Down Reactor3 Licensee Event Report No.
System Code4 Component Code4 Cause and Corrective Action to Prevent Recurrence 1
06/01/85 S
672 F
4 N/A N/A N/A Administrative hold to resolve various TVA and NRC concerns.
1 F: Forced 2 Reason:
3 Method 4 Instructions for Preparation of S: Scheduled A-Equipment Failure (Explain) 1-Manual Data Entry sheets for Licensee B-Maintenance or Test 2-Manual Scram Event Report (LER)
C-Refueling 3-Automatic Scram (NUREG - 1022)
D-Regulatory Restriction E-Operator Training and License 4-Continuation of Existing Outage Examination 5-Reduction F-Administrative 9-Other G-Operational Error (Explain)
H-Other (Explain)
SUMMARY
- Unit 1 has been on administrative hold since June 1, 1985.
E-5 UNIT SHUTDOWNS REPORT MONTH: FEBRUARY 2003 DOCKET NO:
50-260 UNIT NAME:
BFN-2 DATE:
March 6, 2003 COMPLETED BY:
J. E. Wallace TELEPHONE:
(256) 729-7874 No.
Date Type Duration (Hours)
Reason2 Method of Shutting Down Reactor3 Licensee Event Report No.
System Code4 Component Code4 Cause and Corrective Action to Prevent Recurrence 1
02/24/03 S
111 C
2 N/A N/A N/A On February 24, 2003, at 0900 hours0.0104 days <br />0.25 hours <br />0.00149 weeks <br />3.4245e-4 months <br />, Unit 2 began its Cycle 12 refueling outage. The plant remained in an outage status through the remainder of February 2003.
1 F: Forced 2 Reason:
3 Method 4 Instructions for Preparation of S: Scheduled A-Equipment Failure (Explain) 1-Manual Data Entry sheets for Licensee B-Maintenance or Test 2-Manual Scram Event Report (LER)
C-Refueling 3-Automatic Scram (NUREG - 1022)
D-Regulatory Restriction E-Operator Training and License 4-Continuation of Existing Outage Examination 5-Reduction F-Administrative 9-Other G-Operational Error (Explain)
H-Other (Explain)
SUMMARY
Unit 2 has operated without any significant events and began its refueling outage on February 24, 2003.
E-6 UNIT SHUTDOWNS REPORT MONTH: FEBRUARY 2003 DOCKET NO:
50-296 UNIT NAME:
BFN-3 DATE:
March 6, 2003 COMPLETED BY: J. E. Wallace TELEPHONE:
(256) 729-7874 No.
Date Type1 Duration (Hours)
Reason2 Method of Shutting Down Reactor3 Licensee Event Report No.
System Code4 Component Code4 Cause and Corrective Action to Prevent Recurrence N/A 1 F: Forced 2 Reason:
3 Method 4 Instructions for Preparation of S: Scheduled A-Equipment Failure (Explain) 1-Manual Data Entry sheets for Licensee B-Maintenance or Test 2-Manual Scram Event Report (LER)
C-Refueling 3-Automatic Scram (NUREG - 1022)
D-Regulatory Restriction E-Operator Training and License 4-Continuation of Existing Outage Examination 5-Reduction F-Administrative 9-Other G-Operational Error (Explain)
H-Other (Explain)
SUMMARY
Unit 3 has operated at or near 100 percent available power except to make minor repairs.