MONTHYEARNPL-99-0569, Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with NPL-99-0051, Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with NPL-99-0449, Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with ML20209D2691999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Pbnps,Units 1 & 2 NPL-99-0328, Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with ML20209D2751999-05-31031 May 1999 Revised MORs for May 1999 for Pbnps,Units 1 & 2 NPL-99-0273, Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-99-0193, Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with NPL-99-0134, Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with NPL-99-0008, Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with NPL-98-1006, Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-98-0948, Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-98-0826, Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With ML20151W3851998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Pbnp Units 1 & 2 ML20151W4541998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 1 ML20151W4471998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 2 NPL-98-0653, Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 2 NPL-98-0558, Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 2 ML20151W4261998-06-30030 June 1998 Corrected Page to MOR for June 1998 for Pbnp Unit 2 ML20151W4221998-05-31031 May 1998 Corrected Page to MOR for May 1998 for Pbnp Unit 2 NPL-98-0481, Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W4011998-04-30030 April 1998 Corrected Page to MOR for April 1998 for Pbnp Unit 2 NPL-98-0356, Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20216D7071998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3981998-03-31031 March 1998 Corrected Page to MOR for March for Pbnp Unit 2 NPL-98-0159, Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3891998-02-28028 February 1998 Corrected Page to MOR for Feb 1998 for Pbnp Unit 2 ML20216D7121998-02-28028 February 1998 Revised Corrected MOR for Feb 1998 for Point Beach Nuclear Plant,Unit 2 NPL-98-0084, Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 21998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20198M2251997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20198M2331997-11-30030 November 1997 Corrected Monthly Operating Repts for Nov 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9171997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Point Beach Nuclear Plant,Units 1 & 2 NPL-97-0715, Monthly Operating Repts for Oct 1997 for Point Beach Nuclear Plant,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9361997-10-31031 October 1997 Revised Monthly Operating Rept for Oct 1997 for Point Beach Nuclear Plant,Unit 2 NPL-97-0621, Monthly Operating Repts for Sept 1997 for Point Beach Nuclear Plant,Units 1 & 21997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9311997-09-30030 September 1997 Revised Monthly Operating Rept for Sept 1997 for Point Beach Nuclear Plant,Unit 2 NPL-97-0553, Monthly Operating Repts for Aug 1997 for Point Beach Nuclear Plant,Units 1 & 21997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9261997-08-31031 August 1997 Revised Monthly Operating Rept for Aug 1997 for Point Beach Nuclear Plant,Unit 2 ML20210H9531997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20210H9601997-06-30030 June 1997 Revised Monthly Operating Rept for June 1997 for Point Beach Nuclear Plant,Units 1 & 2,which Provides Corrected Forced Outage Rates NPL-97-0318, Monthly Operating Repts for May 1997 for Point Beach Nuclear Plant,Unit 1 & 21997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Point Beach Nuclear Plant,Unit 1 & 2 ML20141C2381997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20141C2461997-03-31031 March 1997 Corrected Operating Data Rept for Mar 1997 for Point Beach Nuclear Plant,Unit 1 ML20137P5781997-03-31031 March 1997 Monthly Operating Repts for March 1997 for Point Beach Nuclear Plant Units 1 & 2 ML20137P5711997-02-28028 February 1997 Corrected MOR for Feb 1997 for Point Beach Nuclear Plant Unit 1 ML20135F2721997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20134J8711997-01-31031 January 1997 Monthly Operating Repts for Jan 1996 for Point Beach Nuclear Plant,Units 1 & 2 ML20135F2771997-01-31031 January 1997 Revised Monthly Operating Rept for Jan 1997 for Point Beach Nuclear Plant,Unit 2 ML20133N0601996-12-31031 December 1996 Revised MOR Rept for Dec 1996 for Point Beach Nuclear Plant, Units 1 & 2 ML20133F6471996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Point Beach Nuclear Plant,Unit 1 & 2 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARNPL-99-0569, Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with ML20212D5961999-09-15015 September 1999 Safety Evaluation Supporting Licensee IPEEE Process.Plant Has Met Intent of Suppl 4 to GL 88-20 NPL-99-0051, Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with NPL-99-0449, Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with ML20196J4251999-06-30030 June 1999 Safety Evaluation Authorizing Proposed Alternatives Described in Relief Requests VRR-01,ROJ-16,PRR-01 & VRR-02 ML20209D2691999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Pbnps,Units 1 & 2 ML20196F3341999-06-22022 June 1999 Safety Evaluation for Implementation of 422V+ Fuel Assemblies at Pbnp Units 1 & 2 ML20195F9781999-06-10010 June 1999 Unit 2 Refueling 23 Inservice Insp Summary Rept for Form NIS-1 ML20209D2751999-05-31031 May 1999 Revised MORs for May 1999 for Pbnps,Units 1 & 2 NPL-99-0328, Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with NPL-99-0273, Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With ML20196F3521999-04-30030 April 1999 Non-proprietary WCAP-14788, W Revised Thermal Design Procedure Instrument Uncertainty Methodology for Wepc Point Beach Units 1 & 2 (Fuel Upgrade & Uprate to 1656 Mwt - NSSS Power) NPL-99-0193, Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with NPL-99-0134, Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with ML20207D6751999-02-22022 February 1999 Assessment of Design Info on Piping Restraints for Point Beach Nuclear Plant,Units 1 & 2.Staff Concludes That Licensee Unable to Retrieve Original Analyses That May Have Been Performed to Justify Removal of Shim Collars ML20206R9001999-01-13013 January 1999 SER Accepting Nuclear Quality Assurance Program Changes for Point Beach Nuclear Plant,Units 1 & 2 NPL-99-0008, Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with NPL-99-0091, 1998 Annual Results & Data Rept for Pbnps,Units 1 & 2. with1998-12-31031 December 1998 1998 Annual Results & Data Rept for Pbnps,Units 1 & 2. with ML20198C7671998-12-10010 December 1998 Safety Evaluation Accepting Licensee Proposed Alternative to ASME BPV Code,1986 Edition,Section XI Requirement IWA-2232, to Use Performance Demonstration Initiative Program During RPV Third 10-yr ISI for Plant,Unit 2 NPL-98-1006, Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With ML20195J5101998-11-16016 November 1998 Proposed Revs to Section 1.3 of FSAR for Pbnp QA Program ML20198J5941998-11-0303 November 1998 1998 Graded Exercise,Conducted on 981103 NPL-98-0948, Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-98-0880, Special Rept:On 980913,fire Alarm Control Panels Inoperable for More That Fourteen Days.Troubleshooting of D-401 Panel Following Installation of Replacement Batteries Revealed No Apparent Cause for Spurious Alarms.Panel D-401 Restored1998-10-21021 October 1998 Special Rept:On 980913,fire Alarm Control Panels Inoperable for More That Fourteen Days.Troubleshooting of D-401 Panel Following Installation of Replacement Batteries Revealed No Apparent Cause for Spurious Alarms.Panel D-401 Restored ML20154M9121998-10-14014 October 1998 Unit 1 Refueling 24 Repair/Replacement Summary Rept for Form NIS-2 ML20154L6751998-10-14014 October 1998 Unit 1 Refueling 24 ISI Summary Rept for Form NIS-1 NPL-98-0826, Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With ML20151W3851998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Pbnp Units 1 & 2 NPL-98-0653, Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W4471998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 2 ML20151W4541998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 1 ML20236Q3161998-07-10010 July 1998 Safety Evaluation Accepting Licensee Proposed Alternative to ASME Code Requirements PTP-3-01 & PTP-3-02 ML20236L6771998-07-0707 July 1998 Safety Evaluation Approving Wepco Implementation Program to Resolve USI A-46 at Point Beach NPP Units 1 & 2 NPL-98-0558, Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 2 ML20151W4261998-06-30030 June 1998 Corrected Page to MOR for June 1998 for Pbnp Unit 2 ML20151W4221998-05-31031 May 1998 Corrected Page to MOR for May 1998 for Pbnp Unit 2 NPL-98-0481, Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W4011998-04-30030 April 1998 Corrected Page to MOR for April 1998 for Pbnp Unit 2 NPL-98-0356, Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20217F3131998-04-17017 April 1998 Safety Evaluation Accepting Proposed Alternative to ASME Code for Surface Exam of Nonstructural Seal Welds,For Plant, Unit 1 ML20216D7071998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3981998-03-31031 March 1998 Corrected Page to MOR for March for Pbnp Unit 2 NPL-98-0209, Special Rept Re Fire Barrier Inoperable for Greater than Seven Days.Compensatory Measures Implemented in Accordance W/Fire Protection Program Requirements During Time That Barriers Were Inoperable1998-03-30030 March 1998 Special Rept Re Fire Barrier Inoperable for Greater than Seven Days.Compensatory Measures Implemented in Accordance W/Fire Protection Program Requirements During Time That Barriers Were Inoperable ML20217A8501998-03-19019 March 1998 SER Accepting Proposed Changes Submitted on 980226 by Wiep to Pbnp Final SAR Section 1.8 Which Will Impact Commitments Made in Pbnp QA Program Description.Changes Concern Approval Authority for Procedures & Interviewing Authority ML20216J0101998-03-17017 March 1998 Safety Evaluation Accepting Third 10-yr Inservice Insp Interval Relief Request RR-1-18 for Plant NPL-98-0159, Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3891998-02-28028 February 1998 Corrected Page to MOR for Feb 1998 for Pbnp Unit 2 ML20216D7121998-02-28028 February 1998 Revised Corrected MOR for Feb 1998 for Point Beach Nuclear Plant,Unit 2 NPL-98-0084, Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 21998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20198L1151998-01-0808 January 1998 SER Accepting Licensee Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Point Beach Nuclear Plant,Units 1 & 2 1999-09-30
[Table view] |
Text
i; \
< - 6. .
' Wisconsin Electnc POWER COMPANY' Point Booch Nuclear Plant 6610NuclearRd TwoRhersWI54241 (414) 7 S 2321 1
Y PBL'95-0296 ,
December 6, 1995
-Document Control Desk '
U. S. NUCLEAR REGULATORY COMMISSION Mail Station P1-137 Washington, DC 20555 ,
Gentlemen t
DOCKETS 50-266 AND 50-301 HONTHLY OPERATING REPORTS POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 Attached are monthly operating reports for Units 1 and 2 of the Point Beach Nuclear Plant for the calendar month of November 1995. ,
Sincerely,
& I G. J. Maxf eld PBNP Manager amb.
Attachments l cca L. L. Smith, PSCW .
NRC Regional Administrator, Region III NRC Resident Inspector i
l i
i W
Coyg 9512110387 951230 l PDR ADOCK 05000266 i
. R _ _, __._, PDR ,, .
pi A sa6sainty af Hhassin Ewigy Qvywatin '
V >
- q OPERATING DATA REPORT
~
L DOCKET NO. 50-266 -
i DATE: '12/06/95 '
COMPLETED BY: M. B. Koudelka--
TELEPHONE: 414 755-6480' OPERATING STATUS
- 1. UNIT MAME
- POINT BEACH NUCLEAR PLANT - UNIT 1 . NOTES .,
- 2. REPORTING PERIOD: November - 1995 .
~
- 3. LICENSED THERMAL POWER (MNT) : '2518.5 ..
- 4. NAMEPLATE RATING (GROSS MWE) : 523.8 .
- 5. DESIGN ELECTRICAL RATING (NET MWE) : 497.0 .
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 509.0 . ,
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 485.0 . . . . . . . . . . . . . . . . . . t
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS: f NA r
- 9. POWER LEVEL TO WHICH RESTRICTED, IF-ANY (NET MWE): NA
- 10. REASONS FOR RESTRICTIONS, (IF ANY) :
-NA .
THIS MONTH YEAR TO DATE CUMULATIVE [
- 11. HOURS IN REPORTING PERIOD 720.0 8,016.0 219,744.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 7,070.8 183,910.4
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 667.3
- 14. HOURS GENERATOR ON LINE 720.0 7,025.0 180,737.4 ;
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 'O.0 _.846.9 !
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1093320.0 10L41426.0 .256086423.0 'L
- 17. GROSS ELECTRICAL ENERGY GENERATED 372630.0 3582530.0 86521180.0 -4
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 356852.5 3423228.5 82483879.5
- 19. UNIT SERVICE FACTOR 100.0% 87.6% 82.2% '
- 20. UNIT AVAILABILITY FACTOR 100.0%- 87.6% 82.6% !
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 102.2% 88.1%- 77.1% i
- 22. UNIT CAPACITY FACTOR (USING DER NET) 99.7% 85.9% 75.5% i
- 23. UNIT FORCED OCTTAGE RATE 0.0% 0.0%' 1.5% I
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH): i Refueling, 03/30/96, 34 days
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
'NA DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977
.j
~
a *
~
POINT BEACH NUCLEAR PLANT DOCKET NO. 50-266 * '
AVERAGE DAILY UNIT POWER LEVEL UINT NAME Point Beech, Unit 1 MONTH NOVEMBER - 1995 DATE December 6,1995 COMPLETED BY M. 6. Koudoka TELEPHONE 414-755-6480 i
AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1 496 11 497 21 494 2 496 12 496 .
22 499 3 496 13 494 23 492 4 495 14 495 24 495 5 496 15 496 25 496 6 497 16 496 26 496 7 497 17 495 27 496 8 497 18 494 28 495 9 496 19 495 29 495 10 497 20 496 30 495 v - _ . _ _ _ . , _ -ve- w. t- 3 s __ _ . _-_ m .- - .- r-. -W
POINT BEACH NUCLEAR PLANT Docket No. 50-266 ..
Unit Name - Point Beach. Unit 1 UNIT SHUrDOWNS AND POWER REDUCTIONS Date Dmour 6.1995 -
Cornpleted By _ M. B. Koudelka .
REPOU MGNTH NOVEMBER - 1995 Telephone No. 414n55-6480 ,
Method of Shutung No. Date Tyg e' Duration Reason' Down 1xensre Event System Component Cause and Comenvc Action NA NA' NA NA NA NA NA NA NA NA
'F: Forced 2 Reason: ' Method:
- Exhibit G - Instructions S: Scheduled A - Equipment Failure (explain) 1 - Manual for preparatum of B - Maintenance or Testing 2 - Manual Scram data entry sheets C - Refueling 3 - Automatic Scram D - Regulatory Restriction LER file (NUREG-0161) 4 - Continuation of E - Operator Trammg & Previous Shutdow11 Licensing Exam 5 - Reduced Imad F- Administrative 6 - Other (explain) 8 Exhibit I- Same Source G - Operational Error (explain)
H - Other (explain)
I i
PBF41028b
. (03-90)
i e e DOCKET NO.= 50-266 !'
U)iIT NAME Point Beach Unit 11 IndME' : December 7, 1995 l COMPLETED'BY M.:B. Koudelka.
TELEPHONE' ~414/755-6480 Unit 1 operated at an average of'496;MWe: net for the report period.
l Safety-related maintenance: included: ;
- 1. .1B52-13B' power to 1B313B-2B337B charging pump crosstie power ,
panel breaker overhaul.
' 2. 'FO-140 T173' emergency diesel generator fuel oil fill tank outlet isolation valve' body-to-bonnet. gasket replacement.
- 3. FO-151 T175A G0;/G02 emergency diesel generator fuel oil storage tank' inlet from T173 fuel oil fill tank body-to-bonnet gasket .
replacement. !
- 4. P32C service water pump' packing adjustment..
t i
l 4
I i
+
OPERATING DATA REPORT
. DOCKET NO. 50-301 .
DATE: 12/06/95
- COMPLETED BY: M. B. Koudelka ,
TELEPHONE: 414 755-6480 OPERATING STATUS
- 1. UNIT NAME: POINT BEACH NUCLEAR PLANT - UNIT 2 . NOTES .
- 2. REPORTING PERIOD: November - 1996 .
- 3. LICENSED THERMAL POWER (MWT) : 1518.5 .
- 4. NAMEPLATE RATING (GROSS MUE) : 523.8 .
- 5. DESIGN ELECTRICAL RATING (NET MWE): 497.0 .
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE) : 509.0 . .
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 485.0 . . . . . . . . . . . . . . . . . .
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
NA
- 9. POWER LEVEL 'IU WHICH RESTRICTED, IF ANY (NET MWE) : NA
- 10. REASONS FOR RESTRICTIONS, (IF ANY) :
NA THIS MONTH YEAR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 720.0 8,016.0 204,529.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 0.0 6,551.9 178,603.5
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 233.9
- 14. HOURS GENERATOR ON LINE 0.0 6,471.5 176,166.2
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 302.2
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 0.0 9662294.0 253644219.0
- 17. GROSS ELECTRICAL ENERGY GENERATED 0.0 3253280.0 86204390.0
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 0.0 3100508.5 82181023.5
- 19. UNIT SERVICE FACTOR 0.0% 80.7% 86.1%
- 20. UNIT AVAILABILITY FACTOR 0.0% 80.7% 86.3%
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 0.0% 79.8% 82.3%
- 22. UNIT CAPACITY FACTOR (USING DER NET) 0.0% 77.8% 80.8%
- 23. UNIT FORCED OUTAGE RATE 0.0% 0.0% 0.9%
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
NONE
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
12/03/95 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LE m x DATED SEPTEMBER 22, 1977
. _. . . . , _ . . - . . -- - - - - _ ~ .- - - - - - - ~ . . . - - - +- - - - - - ~ ~ ~ ' " -"-
F
- POINT BEACH NUCLEAR PLANT Docket No.- 50-301
- Unit Nanae.- Peint M Unit 2 -
UNIT SHUIDOWNS AND POWER REDUC 110NS Deee r- "
- 6. 1995
- Conipleted By - M. B. twv ,..
REPORT MONTH NOVEMBER - 1995 Telephone No.' 414n55-6480 - .
Meemd of Samams Durumon po,, Laceasee Event Syseene Conspement - Casse and Conecave Acaion -
Me. Dese Type' ' Glours) - Reason' as Iteport No. Code
- Code' - To Psevent Rocariance 5 10/785 S 720 C I NA NA NA Schedmied refuehus and unumeenmace (U2R21). Major work itemas incInde sessme gamesmest addy :
corrent sessing and Plus-Point ===parma==: toric acid and sencest makeup thyw nummmmeur '
W: sad insenses limit casupuser W shield fuel suuster embe inside comeammment: Phase 3C of new essergency diesel gemernest tie-in work; seplace 2MS-2016
. sneem dump vehe: repiece HP serbine enhamet escesunder piping: modify W for 4s0 vek semeion - .-. degaded grid vossage ndays-bypass time delay seisys:iod coment catanet anchorage of 2C41: sembus of co-isoianom vehe 2sC-955:2A05 2/3 :
loss of vohnge logic: seisene upgrades for cosmponent
- waeer samall bore piping; usein -
- seesmi condenesse dump valve repincemeses, adan=an of test poimes in Unit 2 safegueses cucales:
and AIARA shoekhag for reactor coolant pump cabecles.
'F: Forced 2 Reason: ' Method:
- Exhibit G -Instructions S: Scheduled A - Equipment Failure (explain) 1 - Manual for preparanon of B - Maintenance or Testing 2 - Manual Scram data entry sheets C - Refueling 3 - Automauc Scram LER Tde (NUREG-0161)
D - Regulatory Restnction 4 - Continuation of.
, E - Operator Trammt & Previous Shutskmn Lacensing Exam 5 - Reduced Load F - Admmatrative 6 - Other (explain) . 'Exhibit I - Same Source PBF 6
' (03-90) -
-_ _ . _ _ _--_ __ ___ _ ___ _ ___ _ _ ____ _ _ _ _ _ _ . . _ - . _ . . . _ _ . . . _ ~ _ . - . . _ . - -
I POWT BEACH NUCLEAR PLANT DOCKET NO. 50-301 '*
I AVERAGE DAILY UNIT POWER LEVEL UNIT NAME Point Beach, Unit 2 l
l MONTH NOVEMBER - 1995 DATE ' December 6,1995 -
i l
COMPLETED BY M. B. Koudelke TELEPHONE 414-755-6480 ,
AVERAGE AVERAGE AVERAGE.
DAR.Y DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1 -2 11 -2 21 -2 2 -2 12 -2 22 -2 3 -2 13 -2 23 -2 4 -2 14 -2 24 -2 5 -2 15 -2 25 -2 6 -2 16 -2 26 -2 7 -2 17 -2 27 -3 8 -2 18 -2 28 -5 9 -2 19 -2 29 -12 10 -2 20 -2 30 -15
mun ,
s'. _
.. a
- DOCKET NO. .50-301' UNIT NAME Point Beach Unit 2 DATE December 7,>1995 COMPLETED BY M. B. Koudelka TELEPHONE- 414/755-6480 Unit 2 was in' refueling shutdown 21 during the report period.
Licensee Event Report 301/95-004-00, Inadvertent ESF Actuation as a Result of Improper Relay Alignment, was submitted.
. Licensee Event Report 301/95-005-00, Steam Generator Tube Degradation, was submitted.
Safety-related maintenance included:
- 1. Service water to engineered' safeguards piping HB-19 elbow ,
replacement.
- 2. 2C-1 and 2C-2 equipment and personnel access air lock seals and packings replacement.
I
- 3. 2CC-17 T12 component cooling surge tank radiation controlled l
vent valve spring pressure and upper limit switch adjustment.
- 4. 2CC-719 containment equipment component cooling supply header outboard isolation valve packing adjustment.
- 5. 2CV-313A P1A&B reactor coolant pump No. 1 seal water return isolation valve stroke and spring pressure adjustment.
- 6. 2MS-265 HX-1A steam generator blowdown isolation valve replacement.
7, 2PIB-M reactor coolant pump motor oil lift strainer housing mounting holes repaired. l
- 8. 2P15A&B safety-injection pump oil indication sight glasses l installation and 2P15A control switch replacement.
4
- 9. 2RC-570A R1. reactor vessel head vent solenoid valve position ;
indicator adjustment.- l l
t
-10, 2SI-V-08 Train A safety injection to R1 reactor vessel vent valve-packing replacement.
i
- 11. 2SI-834C T34A&B safety injection accumulator nitrogen inlet !
. isolation valve and test connection added for containment isolation valve' purposes. l P
- 12. 2SI-843A T34A safety injection accumulator local sample !
valve replacement. !
I t
)
1 l
l
+