L-95-024, Monthly Operating Repts for Oct 1995 for Point Beach Nuclear Plant,Units 1 & 2

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Oct 1995 for Point Beach Nuclear Plant,Units 1 & 2
ML20094L024
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 10/31/1995
From: Koudelka M, Maxfield G
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
PBL-95-0242, PBL-95-242, NUDOCS 9511200008
Download: ML20094L024 (9)


Text

-

l Wisconsin Electnc POWER COMPANY Point Beoch Nuclear Plant 6610 Nuclear Rd., Two Rivers. WI $4241 (414) 7 S 2321 PBL 95-0242 November 7, 1995 Document Control Desk U. S. NUCLEAR REGULATORY COMMISSION Mail Station P1-137 Washington, DC 20555 Gentlemen:

DOCKETS 50-266 AND 50-301 MONTHLY OPERATING REPORTS POINT BEACH NUCLEAR PLANT. UNITS 1 AND 2 Attached are monthly operating reports for Units 1 and 2 of the Point Beach Nuclear Plant for the calendar month of October 1995.

Sincerely,

/

G. J. xfield PBNP Manager amb Attachments cc: L. L. Smith, PSCW NRC Regional Administrator, Region III NRC Resident Inspector

o. v ,,

4VvLUt 9511200008 951031 PDR ADDCK 05000266 R PDR y, A suhafwrofni.swukiEneascaproucw l/' g L/ I j

OPERATING DATA REPORT

  • DOCKET NO. 50-266 DATE: 11/07/95 COMPLETED BY: M. B. Koudelka .

TELEPHONE: 414 755-6480 OPERATING STATUS -

1. UNIT NAME: POINT BEACH NUCLEAR PLANT - UNIT 1 . NOTES .
2. REPORTING PERIOD: October - 1995 . .
3. LICENSED THERMAL POWER (MWT) : 1518.5 . .
4. NAMEPLATE RATING (GROSS MWE): 523.8 . .
5. DESIGN ELECTRICAL' RATING (NET MWE) : 497.0 . .
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE) : 509.0 . .
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE) : 485.0 . . . . . . . . . . . . . . . . . .
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

NA

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE) : NA
10. REASONS FOR RESTRICTIONS, (IF ANY) :

NA- - --

THIS MONTH YEAR *IO DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD 745.0 7,296.0 219,024.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 745.0 6,350.8 183,190.4
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 667.3
14. HOURS GENERATOR ON LINE 745.0 6,305.0 180,017.4
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 846.9
16. GROSS THERMAL ENERGY GENERATED (MWH) 1128397.0 9448106.0 254993103.0
17. GROSS ELECTRICAL ENERGY GENERATED 385000.0 3209900.0 86148550.0
18. NET ELECTRICAL ENERGY GENERATED (MWH) 368174.0 3066376.0 82127027.0
19. UNIT SERVICE FACTOR 100.0% 86.4% B2.2%
20. UNIT AVAILABILITY FACTOR 100.0% 86.4% 82.6%
21. UNIT CAPACITY FACTOR (USING MDC NET) 101.9% 86.7% 77.0%
22. UNIT CAPACITY FACTOR (USING DER NET) 99.4% 84.6% 75.4%
23. UNIT FORCED OUTAGE RATE 0.0% 0.0% 1.5%
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

Refueling, 03/30/96, 34 days

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

NA DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977

POINT EACH NUCLEAR PLANT bocket No. 50-266 .

Unit Name Point Beach. Unit 1 UNIT SHUrDOWNS AND POWER REDUCTIONS Date November 7.1995 .

Completed By M. B. Koudelka ,

REPORT MONTH OCTOBER - 1995 Telephone No. 414n55-6480 Method of .

Shutung NA Date  %' Duration Reason' Down Lacensee Event Sysaem Component Cause and Correcave Action NA NA NA NA NA NA NA NA NA NA l

2

'F: Forced Reason: ' Method:

  • Exhibit G - Instructions S: Scheduled A - Equipment Failure (explain) 1 - Manual for preparation of B - Maintenance or Testing 2 - Manual Scram data entry sheets C - Refueling 3 - Automatic Scram LER ille (NUREG-0161)

D - Regulatory Restriction 4 - Continuation of E - Operator Training & Previous Shutdown Licensing Exam 5 - Reduced Imad F - Administrative 6 - Other (explain) 8 Exhibit I - Same Source G - Operational Error (explain)

II - Other (explain) t PBF-0028b r (03-90)

I POINT BEACH NUCLEAR PLANT DOCKET NO. 50-266 AVERAGE DAILY UNIT POWER LEVEL UNIT NAME Point Beach, Unit 1 MONTH OCTOBER - 1995 DATE November 7,1995 COMPLETED BY M. B. Koudelita TELEPHONE (414)755-6480 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1 479 11 492 21 495 2 497 12 495 22 495 3 496 13 493 23 496 4 496 14 495 24 496 5 496 15 495 25 494 6 494 16 495 26 496 7 497 17 495 27 495 8 497 18 491 ,

28 495 9 498 19 499 29 517 10 474 20 495 30 496

, 31 495 l

l i

(

1 I

_ _ _ _ _ _ - _ _ _ - _ _ _ _ - - - _ _ - _ _ - _ _ - _ _ _ _ _ - _ _ - _ ~ - _ . - - . _ .- ,

DOCKET NO. 50-266 UNIT NAME Point Beach Unit 1 DATE, November 7, 1995 COMPLETED BY M. B. Koudelka TELEPHONE 414/755-6480 Unit 1 operated at an average of 495 MWe net for the report period.

Safety-related maintenance included:

1. G04 emergency diesel generator DA-471 and DA-472 starting air vent valves installation. .

Y 1

OPERATING DATA REPORT .

DOCKET NO. 50-301 ,

DATE: 11/07/95 COMPLETED B,Y: M. B. Koudelka TELEPHONE: 414 755-6480 .

OPERATING STATUS

1. UNIT NAME: POINT BEACH NUCLEAR PLANT - UNIT 2 . NOTES .
2. REPORTING PERIOD: October - 1995 . .
3. LICENSED THERMAL POWER (MWT): 1518.5 . .
4. NAMEPLATE RATING (GROSS MWE) : 523.8 .
5. DESIGN ELECTRICAL RATING (NET MWE): 497.0 . .
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 509.0 . .
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE) : 485.0 . . . . . . . . . . . . . . . . . .
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

NA

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE) : NA
10. REASONS FOR RESTRICTIONS, (IF ANY):

--NA -- - - - - - -

THIS MONTH YEAR TO DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD 745.0 7,296.0 203,809.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 146.5 6,551.9 178,603.5
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 233.9
14. HOURS GENERATOR ON LINE 147.2 6,471.5 176,166.2
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 302.2
16. GROSS THERMAL ENERGY GENERATED (MWH) 219821.0 9662294.0 253644219.0
17. GROSS ELECTRICAL ENERGY GENERATED 74610.0 3253280.0 86204390.0
18. NET ELECTRICAL ENERGY GENERATED (MWH) 69586.0 3102333.0 82182848.0
19. UNIT SERVICE FACTOR 19.8% 88.7% 86.4%
20. UNIT AVAILABILITY FACTOR 19.8% 88.7% 86.6%
21. UNIT CAPACITY FACTOR (USING MDC NET) 19.3% 87.7% 82.6%
22. UNIT CAPACITY FAC'IVR (USING DER NET) 18.8% 85.6% 81.1%
23. UNIT FORCED OUTAGE RATE 0.0% 0.0% 0.9%
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

NONE

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

12/01/95 i DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977

POINT BEACH NUCLEAR PIANT Docket Ns. 50-301 .

Unit Name ' Point u Unit 2 UNIT SHUTDOWNS AND POWER REDUCHONS Date NoW 7.1995 *-

Completed By M. B. Knudelira .

! REPORT MONDI OCTOBER - 1995 Tel aha=a No. 414n55-6480 9

Meehod of

% ~

Duranon Down 1.3censee Event Syseese t'__, Came and Conocove Aceien No. Dese Type' (Hours) Reason' Reacapr s Report No. Code' Code' To Fievent Recuneure +

5' 10/7/95 5 597.8 C 1 NA NA NA mmeteehms and - (U2R21). Major work isees incInde sneens generaser eddy '

I j curvest sessing and PhPoint W- boric acid and sencear mehemp Sow namammeer j . . ved insernos limmit ===g===e W shield fuel e embe inside '

4 m Phase 3C of new emergency dieest generaser sie-im week; nylace 2MS-2016

% seensa dump valve; suplace HP aubine enkmast csoasunder piping; modify '

for 400 voit semeion aamsfonners, degaded grid volage relays-bypass aime delay relays; tod ._ i commet cabimet anchorage of 2C41; seenbeng of- h valve 2SC-955;2A05 2/3 i loss of vahage logic; sessumac upgendes for P 'wahnp water senE bone piping; mania seensa h dump valve regewn=ema =dd=== of east poimes in Unit 2 safeguards circuies; and AIARA May for teacsor coolant pusep cubecles.

i i

i i

i i i

'F: Forced rReason: ' Method: ' Exhibit G - Instructions S: Scheduled A - Equipment Failure (explain) 1 - Manual for preparation of B - Maintenance or Testing 2 - Manual Scram data entry sheets C - Refueling 3 - Automatic Scram LER file (NUREG-0161)

D - Regulatory Restriction 4 - Continuation of E - Operator Training & .

Previous Shutdown i Licensing Exam 5 - Reduced Load F - Administrative 6 - Other (explain) 8 Exhibit I - Same Source PBF-0028b (03-90)

_ _ _ _ . _ _ _ _ . . _ . _ _ _ . . -- - . . . _ . _ _ _ - - . _ _ _ _ _ . . , _ _ . _ _ _ _ _ _ . _ . . _ . . . _ _ . . - . _ _ . _. ._ ~ _ _ .

L

~

POINT BEACH NUCLEAR PLANT DOCKET NO. 50-301 AVERAGE DAILY UNIT POWER LEVEL UNIT NAME Point Beach, Unit 2 MONTH OCTOBER - 1995 DATE November 7,1995 COMPLETED BY M. B. Koudelka TELEPHONE (414)755-6480 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY '

POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1 491 11 -2 21 -2 2 491 12 -2 22 -2 3 492 13 -2 23 -2 4 492 14 -3 24 -2 5 493 15 -2 25 -2 6 492 16 -2 26 -2 7 3 17 -2 27 -2 8 -8 18 -2 28 -2 9 -2 19 -2 29 -2 10 -2 20 -2 30 -2 31 -2

DOCKET NO. 50-301 .

UNIT-NAME Point Beach Unit 2 DATE September 7, 1995 COMPLETED BY M. B. Koudelka TELEPHONE 414/755-6480 ,

Unit 2 operated at an average'of 94 MWe net for the. report period. ,

Safety-related maintenance included:

1. 2HX-15D W1D1 containment accident recirculation fan motor cooling coil weld repair.
2. 2SC-966B&C pressurizer liquid sample and reactor coolant hot leg sample containment isolation valves packing readjusted.  !
3. 2SI-852B-O low head safety injection core deluge isolation operator replaced and torque switch reset. .
4. 2SI-856A and 2SI-856A-O T13 refueling wate : storage tank outlet to P10A&B residual heat removal pump suction header  ;

valve and operator.

I

5. 2X13 B03~ station service transformer seismic supports installed.
6. 2X14 B04 station service transfer seismic supports )

installed. l 1

i i

i 8

2 1

i

. - . . ~ . . --