L-81-277, Forwards Public Version of Revised Emergency Implementing Procedures,Including Rev 15 to EP M-1, Employee Injury or Illness (Nonradiological) & Rev 8 to EP G-4, Personnel Accountability & Assembly

From kanterella
(Redirected from L-81-277)
Jump to navigation Jump to search
Forwards Public Version of Revised Emergency Implementing Procedures,Including Rev 15 to EP M-1, Employee Injury or Illness (Nonradiological) & Rev 8 to EP G-4, Personnel Accountability & Assembly
ML20206J008
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 06/16/1986
From: Shiffer J
PACIFIC GAS & ELECTRIC CO.
To: Martin J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Shared Package
ML20206J011 List:
References
DCL-86-170, GL-81-27, GL-81-2770, NUDOCS 8606260383
Download: ML20206J008 (2)


Text

- ,

PACIFIC GFAS AND EIsE C T RIC C O M PANY bb91 [ 77 BEALE STREET . SAN FRANCISCO, C AurORNIA 94[O6 . (415)781 4211 . TFX 910 372 6587 June 16, 1986

,, . o 7=

PGandE Letter No.: DCL-86-170 Mr. John B. Martin, Regional Administrator  !

U. S. Nuclear Regulatory Commission, Region V 1450 Maria Lane, Suite 210 Walnut Creek, CA 94596-5368 1 Re: Docket No. 50-275, OL-DPR-80 ..

Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Emergency Plan Implementing Procedures Updates s

Dear Mr. Martin:

In accordance with Section V, " Implementing Procedures," of 10 CFR 50, Appendix E, PGandE is submitting one copy of the updates to the detailed Implementing Procedures (Enclosure 3) for the Diablo Canyon Power Plant Units 1 '

and 2 Emergency Plan. These updates are listed in Enclosure 1. Concurrently, two copies of each update are being submitted to the Document Control Desk.

Some of the updates contain privacy / proprietary information. This privacy /

proprietary information has been bracketed in accordance with NRC Generic Letter 81-27 and is identified in Enclosure 2.

Kindly acknowledge receipt of this material on the enclosed copy of this letter and return it in the enclosed addressed envelope.

Sincerely, l

. J' J. D. iffer Enclosures (3) j cc w/enes: R. F. Fish  !

M. M. Mendonca i Document Control Desk (2) i cc w/o Enc. 3: L. J. Chandler B. Norton H. E. Schierling S. A. Varga CPUC Diablo Distribution s Enclosure 3 is available for review at:

8606260383 860616 NRA ACTS Files i

PDR ADOCK 05000275 45 Fremont Street

F _PDR 23rd Floor, Room C-40 0916S/0045K/BJB/1345

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NDR:N DOC. DATE: 86/06"/15 'NOTAR I ZED: NO DOCKET # l FACIL: 50--275 Diatlo Canyon Nuclear Power Plant, Unit 1, Pac i fi c Ca 05000275 l 50-323 Diablo Canyon Nuclear Power Plant, Unit 2, PaciFit Oa 05000323

, l AUTH.NAME AUTHOR AFFILIATION SHIFFER,J.D. Paci Pic Cas Se Electric Co.

RECIP.NAME RECIPIENT AFFILIATION MARTIN,J.B. Region 5, Office of Director SUB JECT: Forwstds Central Files version of updates to emergency implementing procedures, including Rev 15 to EP M-1,

" Employee Injury or Illness (Nonradiological)" t< Rev 8 to EP G-4, " Personnel Accountability.. . " Withheld.

DISTRIDUTION CODE: XOO5D COPIES RECEIVED: LTR lITLE: Emerg Plan (CF Avail)

ENCL _ SIZE: ff _

NOT ES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE /NAME LTTR ENCL ID CODE /NAME L1TR ENCL FWR-A PD3 L A 1 0 PWR-A PD3 PD 1 0 SCHIERLING,H 01 1 1#Y INTERNAL: JDhh 02 1 1M IE/DEPER/EPB 03 2 2 N 'd

'IE/DEPER/IRB 1 1 $ $ REG FILES 07 1 1g/

TOTAL NU.MDER OF COPIES REGUIRED: LTTR 8 ENCL [

Text

- ,

PACIFIC GFAS AND EIsE C T RIC C O M PANY bb91 [ 77 BEALE STREET . SAN FRANCISCO, C AurORNIA 94[O6 . (415)781 4211 . TFX 910 372 6587 June 16, 1986

,, . o 7=

PGandE Letter No.: DCL-86-170 Mr. John B. Martin, Regional Administrator  !

U. S. Nuclear Regulatory Commission, Region V 1450 Maria Lane, Suite 210 Walnut Creek, CA 94596-5368 1 Re: Docket No. 50-275, OL-DPR-80 ..

Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Emergency Plan Implementing Procedures Updates s

Dear Mr. Martin:

In accordance with Section V, " Implementing Procedures," of 10 CFR 50, Appendix E, PGandE is submitting one copy of the updates to the detailed Implementing Procedures (Enclosure 3) for the Diablo Canyon Power Plant Units 1 '

and 2 Emergency Plan. These updates are listed in Enclosure 1. Concurrently, two copies of each update are being submitted to the Document Control Desk.

Some of the updates contain privacy / proprietary information. This privacy /

proprietary information has been bracketed in accordance with NRC Generic Letter 81-27 and is identified in Enclosure 2.

Kindly acknowledge receipt of this material on the enclosed copy of this letter and return it in the enclosed addressed envelope.

Sincerely, l

. J' J. D. iffer Enclosures (3) j cc w/enes: R. F. Fish  !

M. M. Mendonca i Document Control Desk (2) i cc w/o Enc. 3: L. J. Chandler B. Norton H. E. Schierling S. A. Varga CPUC Diablo Distribution s Enclosure 3 is available for review at:

8606260383 860616 NRA ACTS Files i

PDR ADOCK 05000275 45 Fremont Street

F _PDR 23rd Floor, Room C-40 0916S/0045K/BJB/1345

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NDR:N DOC. DATE: 86/06"/15 'NOTAR I ZED: NO DOCKET # l FACIL: 50--275 Diatlo Canyon Nuclear Power Plant, Unit 1, Pac i fi c Ca 05000275 l 50-323 Diablo Canyon Nuclear Power Plant, Unit 2, PaciFit Oa 05000323

, l AUTH.NAME AUTHOR AFFILIATION SHIFFER,J.D. Paci Pic Cas Se Electric Co.

RECIP.NAME RECIPIENT AFFILIATION MARTIN,J.B. Region 5, Office of Director SUB JECT: Forwstds Central Files version of updates to emergency implementing procedures, including Rev 15 to EP M-1,

" Employee Injury or Illness (Nonradiological)" t< Rev 8 to EP G-4, " Personnel Accountability.. . " Withheld.

DISTRIDUTION CODE: XOO5D COPIES RECEIVED: LTR lITLE: Emerg Plan (CF Avail)

ENCL _ SIZE: ff _

NOT ES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE /NAME LTTR ENCL ID CODE /NAME L1TR ENCL FWR-A PD3 L A 1 0 PWR-A PD3 PD 1 0 SCHIERLING,H 01 1 1#Y INTERNAL: JDhh 02 1 1M IE/DEPER/EPB 03 2 2 N 'd

'IE/DEPER/IRB 1 1 $ $ REG FILES 07 1 1g/

TOTAL NU.MDER OF COPIES REGUIRED: LTTR 8 ENCL [