ML20206J008

From kanterella
Jump to navigation Jump to search
Forwards Public Version of Revised Emergency Implementing Procedures,Including Rev 15 to EP M-1, Employee Injury or Illness (Nonradiological) & Rev 8 to EP G-4, Personnel Accountability & Assembly
ML20206J008
Person / Time
Site: Diablo Canyon  
Issue date: 06/16/1986
From: Shiffer J
PACIFIC GAS & ELECTRIC CO.
To: Martin J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Shared Package
ML20206J011 List:
References
DCL-86-170, GL-81-27, GL-81-2770, NUDOCS 8606260383
Download: ML20206J008 (2)


Text

-

PACIFIC GFAS AND EIsE C T RIC C O M PANY bb91

[

77 BEALE STREET. SAN FRANCISCO, C AurORNIA 94[O6. (415)781 4211. TFX 910 372 6587 June 16, 1986 7=

,,. o PGandE Letter No.: DCL-86-170 Mr. John B. Martin, Regional Administrator U. S. Nuclear Regulatory Commission, Region V 1450 Maria Lane, Suite 210 Walnut Creek, CA 94596-5368 Re: Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Emergency Plan Implementing Procedures Updates s

Dear Mr. Martin:

In accordance with Section V, " Implementing Procedures," of 10 CFR 50, Appendix E, PGandE is submitting one copy of the updates to the detailed Implementing Procedures (Enclosure 3) for the Diablo Canyon Power Plant Units 1 and 2 Emergency Plan. These updates are listed in Enclosure 1.

Concurrently, two copies of each update are being submitted to the Document Control Desk.

Some of the updates contain privacy / proprietary information. This privacy /

proprietary information has been bracketed in accordance with NRC Generic Letter 81-27 and is identified in Enclosure 2.

Kindly acknowledge receipt of this material on the enclosed copy of this letter and return it in the enclosed addressed envelope.

Sincerely, J'

J. D.

iffer Enclosures (3) j cc w/enes:

R. F. Fish M. M. Mendonca i

Document Control Desk (2) i cc w/o Enc. 3: L. J. Chandler B. Norton H. E. Schierling S. A. Varga CPUC Diablo Distribution s is available for review at:

8606260383 860616 NRA ACTS Files i

PDR ADOCK 05000275 45 Fremont Street F

_PDR 23rd Floor, Room C-40 0916S/0045K/BJB/1345

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NDR:N DOC. DATE: 86/06"/15 'NOTAR I ZED: NO DOCKET #

FACIL: 50--275 Diatlo Canyon Nuclear Power Plant, Unit 1, Pac i fi c Ca 05000275 50-323 Diablo Canyon Nuclear Power Plant, Unit 2, PaciFit Oa 05000323 AUTH.NAME AUTHOR AFFILIATION SHIFFER,J.D.

Paci Pic Cas Se Electric Co.

RECIP.NAME RECIPIENT AFFILIATION MARTIN,J.B.

Region 5, Office of Director SUB JECT: Forwstds Central Files version of updates to emergency implementing procedures, including Rev 15 to EP M-1,

" Employee Injury or Illness (Nonradiological)" t< Rev 8 to EP G-4,

" Personnel Accountability...

Withheld.

ff DISTRIDUTION CODE: XOO5D COPIES RECEIVED: LTR ENCL

_ SIZE:

lITLE: Emerg Plan (CF Avail)

NOT ES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE /NAME LTTR ENCL ID CODE /NAME L1TR ENCL FWR-A PD3 L A 1

0 PWR-A PD3 PD 1

0 SCHIERLING,H 01 1

1#Y 2 N 'd JDhh 02 1

1M IE/DEPER/EPB 03 2

INTERNAL:

1 $ $ REG FILES 07 1

1g/

'IE/DEPER/IRB 1

[

TOTAL NU.MDER OF COPIES REGUIRED: LTTR 8

ENCL