Insp Repts 50-528/85-46 & 50-530/85-30 on 851209-13.No Violation or Deviation Noted.Major Areas Inspected: Activities Associated W/Containment Structures & Supports, Reactor Coolant Loop Piping & Other safety-related Piping
ML17299A928
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 12/18/1985
From: Wagner W, Thomas Young
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To:
Shared Package
ML17299A927 List:
References
50-528-85-46, 50-530-85-30, NUDOCS 8601160323
Download: ML17299A928 (12)


Text

860fih0323 851223 PDR ADOCK 05000528 G

PDR

'

U.

Report Nos.

Docket Nos.

License No.

S.

NUCLEAR REGULATORY COMMISSION

REGION V

50-528/85-46 and 50-530/85-30 50-528 and 50-530 NPF-41 Construction Permit No.

CPPR-143 Licensee:

Arizona Public Service Company P.

O. Box 21666 Phoenix, Arizona 85036 Facility Name:

Xnspection at:

Inspection conducted:

Palo Verde Nuclear Generating Station - Units 1 and

Palo Verde Site, Wintersburg, Arizona December 9-13, 1985 Inspector:

W. J agner, Rea or nspector t

Approved By:

T. Young, Jr.,

Ch f, Engi er g Section Z--/-

Date Signed

]p /C'- P Date Signed Summary:

Xns ection on December 9-13 1985 (Re ort Nos. 50-528/85-46 50-530/85-30)

Areas Ins ected:

Routine unannounced inspection by a regional based inspector of activities associated with containment structures and supports, reactor coolant loop piping, other safety-related piping, and follow-up on a commitment to review AWS welder qualifications for Unit 1.

The inspection involved 35 inspector-hours by one NRC inspector.

During this inspection, Inspection Procedures 49054B, 53051B, 55053B, 55075B, 55081B and 55181B were covered.

Results:

No violations of NRC requirements or deviations were identifie ~

~I i

I

~

~

DETAILS 1.

Persons Contacted hI l

a.

Arizona -Nuclear Power Pro ect (ANPP)

"(W.

PD.

"C

'G

"W

"-R.

d T D.

D.

1'

E. Ide, Director, Corporate QA/QC B. Fasnacht, Nuclear Construction Manager N. Russo, Manager, 'Quality Audits and Monitoring Pankonin, Mechanical Nuclear Construction Iead Montefor, QA Engineer J. Poche,'ompliance Engineer A. 'Petersen, Nuclear'icensing Engineer M. LeBoeuf, QA Engineer M. Eastman, QA Engineer b.

Bechtel Power Cor oration (Bechtel)

J D

"G

"H

'"R.

G.

E.

R. Hawkinson, Project:

QA Manager A. Hierzer, Field Construction Manager D. Foster, Project QC Engineer W. Gillison, Project Engineer I. Horst, Project Field Engineer Stam, Lead Field Welding Engineer DeLaPaz, Field Welding Engineer

"-Denotes those attending the exit meeting on December 12, 1985.

Licensee Action on Previousl Identified Follow-u Item (50-528/84-56-05): Verification of Welders'glification-Unit

The licensee established a program for verification of welder qualifications that provided a 100 percent review of ASME weld records and associated welder certification documentation.

This program was reviewed and reported in NRC Report No. 50-528/84-56.

Since the welder verification program was limited to ASME welds, the licensee committed to include AWS certified welders in a similar program to be completed by January 15, 1985.

The inspector reviewed the results of this effort which is documented in Quality Investigation Report QI-85-0088.

The work was performed in accordance with SCIP 619.0 and completed on January 8,

1985.

The inspector reviewed the description of the various nonconformances and was satisfied with the technical justification that resulted in dispositions of use-as-is; no weld rework was required.

This item is closed.

3.

Containment Penetrations (Mechanical) - Unit 3 a ~

Review of ualit Assurance Im lementin Procedures The inspector reviewed the following quality assurance documents relating to activities associated with the installation of containment penetrations:

C

~

~

)'

I',

F l

s,t't/

1/

A l

kt

'

d J

C )

.co

'4

(1)

WPP/QCI No. 4.0 Revision 26, "Receiving Inspection".

This procedure provides instructions for the receipt of equipment and materials in accordance with the requirements of ANSl N45.2.2-1972

"Packaging, Shipping, Receiving, Storage and Handling of Items for Nuclear Power Plants".

(2)

Specification No.

13-CM-370, Revision 4, "Installation Specification for Erecting the Containment Building Liner Plate System".

This, specification includes the appropriate requirements for the installation, including assembly, erection, welding, and testing (NDE and leak testing) of mechanical penetrations.

(3)

WPP/QCI No.,61, Revision 5, "Containment Cylindrical Liner Plate 'Installation".

This procedure provides instructions for the erection, welding, inspection, testing, and documentation of the containment cylindrical liner plates.

Documentation includes installation, of penetrations.

)

(4)

Project Quality Program Manual, Procedure 18: This procedure defines the requirements a'nd responsibilities for establishing programs for iauditing activities.

This is implemented by QA

', Department'loce'dure No.~ 5.1, "Project QA Audits" which defines the project~audits of field r'elated activities.

The

'inspector's review of the "Quality Audit Schedule" revealed that audits were conducted of',;gC inspection activities.

J The inspector concl'uded that the above procedures provide assurance that appropriate and 'ade'quate inspection and work procedures existed tp assure that con'tainment penetration activities were controlled and performed to the applicable requirements.

b.

':-

Observation 'of Weldin Activities

't Welding on steel containment "structures and steel supports for major equipment within containment was completed prior to this inspection.

No welding or NDE activities were in process during this inspection nor were any scheduled.

No violations of NRC requirements or deviations were identified.

Safet -Related Pi in (Weldin ) - Vnit 3 a

~

Review of Qualit Assurance Im lementin Procedures The inspector reviewed selected procedures associated with welding, NDE and QC inspections to assure that specific activities were addressed and in conformance with applicable code requirements.

The following procedures were reviewed.

(1)

RT-XG-2, Revision 2 "Radiography" (2)

PX-BPC-l, Revision 2 "Liquid Penetrant"

L t

~

F w

I

,,n t'

]Ii I'"

ll

g la il l

(3)

MT-P-1, 2, Revision 2 "Magnetic Particle" The technique requirements covered in these NDE procedures conform to applicable codes and standards and have been qualified.

The control of contaminants in NDE materials is addressed in procedures PT-BPC-1 and UT-PE-1,2.

f (4)

Welding Standard,'D-1.

This procedure defines the requirements for documenting the activities related to welding and NDE of welds and weld repairs, such as weld location, w'elder's i'dentification, weld procedure used, weld filler

'material, NDE,,NDE technician's identification, NDE results and inspection re@'uirements.

I

"1 (5)

'Specification No. PHT-500 "Code Requirements for Postweld Heat Treatment of Field Welds",.

(6) 'eneral Welding Standard GWS-FM.

This procedure contains requirements for preheat and interpass temperature control, and the repair of defects.

(7)

Procedure Specification, WFMC-1.

This procedure addresses the requirements for receipt, inspection, storage and disbursement of welding filler materials.

b.

Weldin Procedure S ecifications The preparation, qualification, approval, distribution and revisions of welding procedure specifications (WPS) is performed by Bechtel's Materials and Quality Services Department.

These requirements are specified in the Bechtel ANPP Project Welding Manual Section 2.1 and in Welding Standard WD-1.

The following WPS's selected for review were controlled in accordance with these requirements.

WPS No.

Revision Date Weldin Process P8-T-Ag-0 Pl-M-PA Pl-F-d P1"T Pl-A-Th Pl-AT-Lh

2

1

5 10/15/79 9/22/83 9/4/79 5/11/76 3/12/80 3/1/79 GTAW GMAW FCAW GTAW SMAW GTAW/SMAW The WPS's selected and the supporting Procedure Qualification Records (PQR) contain all the essential, supplementary essential and nonessential variables as required by Section 1X of the ASME Code.

The PQR's essential variable values were consistent with those permitted by the WPS.

Mechanical test results and PQR certifications were in compliance with ASME Code requirements.

All WPS's reviewed were properly qualified.

No violations of NRC requirements or deviations were identifie C fj ~

P, P

t l

'1 l N

V I

F

lr Jl d

I J I

, <,t

'I C

'C

~

~

~

~

5.

Reactor Coolant Pressure Bounda Pi in

- Unit 3 a.

Review of NDE Records The inspector reviewed the installation records for 'the following field piping welds to ascertain whether the NDE records covering evaluation of weld quality were in accordance with established procedures.

Line No.

ZM No.

~Pi e Dia.

NDE Process RC 034 W001 RC 068 W001 RC 062 W004 RC 058 COO RC 017 W004 b.

Observation of Work Activities 30lt 31I 2tl 3 II PT, RT PT, RT PT, RT PT, RT PT, RT Al,l in process piping activities were completed prior to this inspection.

However, the inspector reviewed the records of the following piping activitie's:

(1') 'Inst'allation of,16" pipe ispoolt Tag No.

3RC 068S002.

The

, '"Large Pipe Control Card",documented the QC inspection for various:, activities to assure an acceptable installation.

e(2)

NDE.for i'nstallation of the RC Piping Cold Leg lA to RC Piping Dis'charge Nozzle.'his activity is documented on WPP/QCI No. 72-3 the'construction inspection plan for NSSS equipment.

The records indi'cate that the required NDE was performed and that QC inspected as required.

(3)

Valve Installation Card, Valve Tag No.

3PRCEV241.

All the required QC inspections, such's cleanliness, valve identification and flow direction, were performed.

I The inspector reviewed the qualification records for the QC inspection personnel utilized for these installations and found them to be satisfactory.

The above installation records also indicate that the piping runs between major components were installed as required by the applicable specification and that NDE activities were performed in accordance with approved NDE procedures and by qualified NDE personnel.

The inspector performed a walkdown inspection of RCPB piping for pipe lines in 3 systems to compare the actual installation with the design (ISO) drawings.

No discrepancies were observed for the following pipe lines inspected:

~

~

~'

t I,

I r II I

A I

1>

rtt I

r<

j t,'

I I

r r If tt rI Tj,

>>J ltr,t i~g

'"4P II rt C

I II

<<C1 IIII,

'rll t I

It t'

tt

  • r r

I t'

Line No.

SI 223 RC 060 RC 061 CH 275 CH 276 Drawin (ISO) No.

13-P-SIF-103 13"P-CHF-110 13-P-CHF-110 13-P-CHF"112 13-P-CHF-112 Revision

13

7

No violations of NRC requirements or deviations were identified.

The inspector met with licensee management representatives denoted in paragraph 1 on December 12, 1985.

The scope of the inspection and the inspector findings as noted in this report were discusse J

/

I I W

(

f H

,t