U. S NUCLEAR REGULATORY COMMISSION
REGION V
Report Nos.
50-529/85-13 and 50-530/85-06 Docket Nos.
50-529 -and 50-530 Construction Permit Nos.
CPPR 142 and 143 Licensee:
Arizona Public Service Company P.
O. 'Box 2166 Phoenix, Arizona 85036 Facility Name:
Palo Verde Nuclear Generating Station - Units 2 and
Inspection at:
Palo Verde Site, Wintersburg, Arizona Inspection conducted:
March 4-8 and 18-22, 1985 1nspector:
Approved by:
T. Young, Jr.,
En eeri c ief, on F. Miller r., Chief, Reactor Projects Section
.2 W.
.
agner,,
Re tor Inspector Dat si ed-p-Ps Date signed-3-F>
Date signed
~Summa Ins ection on March 4-8 and 18-22 1985 (Re ort Nos. 50-529/85-13 and 50-530/85-06)
~u of activities associated with welding of steel structures and supports,'and implementation of the licensee's (}A program for handling and storage of equipment and materials.
The inspection involved 62 inspector-hours by one NRC inspector.
Results:
No violations of NRC requirements or deviations were identified.
850425054b 850404 PDR ADOCK 05000529
Details 1.
Persons Contacted a.
Arizona Public Service Com an (APS)
~D f/~"L.
-W.
"J 7f"=C.
y"-.w.
/3M.
NB.
NL.
8J.
NJ.
y"-T.
H.
R'.
D.
A.
C.
C.
F.
Karner, Assistant Vice President Nuclear Production Souza, Assistant Corporate QA/QC Manager Quinn, Manager Licensing Bayless, QA Engineer Russo, Manager Quality Audits and Monitoring Montefour, QA Engineer Dougherty, Material Control Supervisor Kaplan, Procurement Quality Manager Wright, Lead Procurement Receiving Engineer Tench, Manager Administrative Services Bynum, Plant Manager Bloom, Licensing Engineer Smith, Jr.,
Compliance Engineer Green, QA Engineer Boughman, Procurement Receiving Engineer Hutton, QA Engineer Matura, Procurement Quality Engineer Lewis, Procurement Quality Supervisor Sifrit, Water Reclamation Warehouse Foreman Wright, Materials Foreman b.
Bechtel Power Co oration (Bechtel)
'W-H.
M.
E.
C.
Stubblefield, Field Construction Manager Miller, Construction Engineer Foster, Project QC Engineer Vote, Assistant Project QA Manager Valdo, Lead Field Welding Engineer Miller, Field Welding Engineer Klingaman, Hanger Support Foremen Denotes those attending the exit interview on March 8, 1985
'enotes those attending the exit interview on March 22, 1985 2.
Recei t Stora e and Handlin of E ui ment and Materials - Unit 2 The inspector conducted a detailed inspection of warehouses to assure that the administrative controls for storage of safety-related items were being properly implemented.
The warehouses inspected were the Water Reclamation Facility, the Main Warehouse, and Warehouse C.
There are no offsite warehouses.
The storage level requirements and environmental conditions were in accordance with ANSI N45.2.2.
There were no safety-related'tems classified to Level A; most items, including Level C
items, were classified,to Level B which is satisfactory since Level B's the higher level designation.
Access control, identification of items, designated.hold'reas, and cleanliness were properly maintaine g4 I
2.
The Material Control Department conducts monthly inspections of the warehouses, and documents this activity in the Storage Verification Report.
These inspections are performed to assure that controlled conditions are being maintained.
The inspector reviewed reports generated
.from October 1984 through February 1985.
The reports were satisfactory with no evidence of previous identified NRC concerns regarding approvals, who performed the inspection, or identification of the warehouse inspected.
Material Control also reports on a weekly basis the shelf life of stored materials.
The inspector verified that maintenance was notified of items stored in the warehouse requiring, preventative maintenance.
This was accomplished in accordance with
"Department Instruction for the Notification of the Maintenance Control Center (MCC) for Material Placed'n Storage that Requires Preventative Maintenance" per memo of November ll, 1984.
The inspector reviewed the following Material, Handling and Storage procedures, which have recently been approved or revised, and verified implementation of specific areas:
a
~
12AC-OZZOl "Inventory Control",.Procedure Change Notice (PCN) Ol of 9/8/84 and PCN 02 of 2/11/85.
The procedure requires that a Data Capture Sheet (DCS) be used to provide traceability and accountability of received materials.
The inspector reviewed a
number of DCS forms to verify that the Safety 'Section, Radiation Section, or the Metrology Lab, had indicated their review of the items received when required.
This review was evident on the DCS forms examined by the inspector.
b.
3N513.15.00 "Material Receiving", Revision 0 of 9/17/84.
Material Control visually inspects all shipments in accordance with Department Operating Instructions and subsequently places a
Receiving Label on each item received.
The inspector randomly selected
.a number of received items and confirmed that the Receiving Labels were on the items, and properly fi:lied out with the required signatures.
c.
3N513.23.00 Transferring Material and Equipment" Revision 0 of 9/17/84.
The inspector verify that material transfer from. the Main Warehouse to Warehouse C was in accordance with this procedure.
d.
3N513.23.00 "Control of Over, Short and Damaged Material", Revision 0 of 9/17/84.
The inspector reviewed a number of Reports of Unsatisfactory, Over, Short and Damaged Material, in order to determine if any potential problems exist on replacement of
.safety-related items.
No apparent problems were identified from these reports.
Interviews with receiving personnel revealed no potential problems or concerns.
The following items, recently purchased,,and received on-site, were inspected to verify that receipt inspections, di'spositions and'torage requirements were in accordance with established administrative controls:
Purchase Order No.
33002537 33002538 3300245'6 33400943 33400831 60089309 Date 2/13/85 2/13/85 1/15/85 1/31/85 1/3/85 12/11/84 Descri tion Hexadecimal Display Amphenol Connectors C-2 Common Module Programmable Logic Controller Valve Diaphragm Assembly Brass Regulating Valve Date Received 2/22/85 2/23/85 2/4/85 2/7/85 1/22/85 1/15/85 The inspector also verified that the stored items were labeled allowing traceability 'back to the purchasing, receiving and quality certification documents.
The inspector verified that administrative controls for nonconforming items were properly implemented including marking, segregation, disposition and documentation.
Provisions were established to assure that Vendor (}uality is notified of nonconforming items.
Also, there are provisions to assure that repaired or reworked items are inspected in accordance with applicable procedures.
No violations of NRC requirements or deviations were identified.
3.
Steel Structures and Su orts - Unit 3 a
~
Observation of Meldin Activities Within Containment The inspector observed in-process structural welding activities within the Unit 3 containment building to assure that welding was performed in accordance to the AWS Dl.l "Structural Welding Code".
This was accomplished by visual examination of welding associated with the following steel structures and supports:
(1)
SS-004.
(2)
RD-053 (3)
RC-003 (4)
SI-130 (5)
SI-130 (6)
CS-513 Hanger H
(Fillet Weld)
Hanger A
(Fillet Meld)
Hanger A
(Flare Bevel/Fillet Weld)
Hanger
(Fillet Weld)
Hanger
(Fillet Weld)
Hiscellaneous Steel Plate (Single Bevel Groove Weld)
Prior to welding of the assembled parts, the inspector examined the following conditions to verify conformity to the applicable specifications:
(1)
Meld joint geometry, preparation and finish.
(2)
Fit-up 'and alignment.
(3)
Cleanliness.
During in-process welding operations the following verifications were performed by the inspector:
il
!
(1) Welding procedures and, drawings were available.
(2)
Welder technique and sequence in accordance with the welding procedure.
(3)
Melding filler metals of the specified type and grade.
(4)
Interpass chipping, grinding and controls performed in accordance with applicable procedures.
(5)
Melding electrodes used in the positions and with the electrical characteristics specified in,the welding procedure.
(6)
Welding equipment, including power cables, in good condition.
b.
Welder uglification The inspector reviewed the qualification records of the six welders involved in the welding operations observed during this inspection.
All were satisfactory qualified to weld under the respective welding procedures according to documents reviewed which conformed to AWS Dl.l requirements.
The inspector also observed the completion of a welder qualification test, plate used for qualifying a welder for unlimited thickness.
The joint detail, plate dimensions and preparation for radiographic examination were in accordance with AMS Dl.l qualification test requirements.
c ~
Weldin Procedure S ecification The inspector examined Bechtel welding. procedure number Pl-A-Lh (Structural) Revision 3, Amendment 5 of April 1, 1984.
'This welding procedure
, utilized on the welding observed during this inspection,.
met all the requirements specified in the AMS Dl.l'ode.
d.
Visual Examination of Weld The inspector visually examined the following structural welds for compliance to AMS Dl.l Code:
(1)
RC-021 Hanger A'2)
CH-008 Hanger AJ (3)
Support to Beam 788BR (4)'C-105 Hanger 005 (5)
RC-161 Hanger C
(6)
SG-180 Hanger AB (7)
CH-152 Hanger G
(8)
CH-227 Hanger C
Also examined were clips welded to structural beams at various locations.
All welds were examined for location, size, shape, surface condition, removal of arc strikes and weld spatter, and surface defect I
The inspector reviewed the quality records associated'ith welds CH-008, RC-021 and CH-152.
The records indicated that the specified inspections for visual and dimensional inspections were completed, and that the weld quality was satisfactory.
e.
Weldin Material Control The welding materials utilized in the welding operations observed during this inspection were identified and controlled in accordance with the AWS Code.
Rod room numbers 12, 15 and 16 serving Unit 3 were inspected to assure that controls for dispersion and handling of weld fill'er materials were being properly implemented.
All filler material located in holding ovens and in opened containers were correctly identified.
The holding ovens were calibrated and operating within the required temperature range.
No violations of NRC requirements or deviations were identified.
The inspector,met with licensee management representatives denoted in paragraph l,on March 8 and 22, 1985.
The scope of the inspections and the inspector's findings as noted in this report were discusse il
0