Similar Documents at Byron |
---|
Category:INSPECTION REPORT
MONTHYEARIR 05000454/19990121999-10-0808 October 1999 Insp Repts 50-454/99-12 & 50-455/99-12 on 990803-0916.One NCV Occurred.Major Areas Inspected:Operations,Engineering, Maint/Surveillance & Plant Support IR 05000454/19990161999-10-0101 October 1999 Insp Repts 50-454/99-16 & 50-455/99-16 on 990907-10.No Violations Noted.Major Areas Inspected:Radiation Protection & Chemistry Program Included Water Chemistry Control Program & Chemistry Instrument Quality Control Program IR 05000454/19990151999-09-30030 September 1999 Revised Pages Eight Through Eleven to Insp Repts 50-454/99-15 & 50-455/99-15,correcting Inaccuracies with Docket Numbers & Tracking Numbers IR 05000454/19990141999-09-17017 September 1999 Insp Repts 50-454/99-14 & 50-455/99-14 on 990823-27.No Violations Noted.Major Areas Inspected:Physical Security Program ML20211P2001999-09-0808 September 1999 Insp Repts 50-454/99-15 & 50-455/99-15 on 990824-26.No Violations Noted.Major Areas Inspected:Evaluation of Licensee Performance During Exercise of EP IR 05000454/19990101999-08-25025 August 1999 Insp Repts 50-454/99-10 & 50-455/99-10 on 990622-0802.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000254/19990101999-08-20020 August 1999 Insp Repts 50-254/99-10,50-265/99-10,50-454/99-09, 50-455/99-09,50-456/99-10 & 50-457/99-10 on 990628-0721. Major Areas Inspected:Licensee C/A Approach & Implementation of Configuration Control Processes at Each Site IR 05000454/19990081999-07-16016 July 1999 Insp Repts 50-454/99-08 & 50-455/99-08 on 990511-0621.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000454/19990041999-06-0404 June 1999 Insp Repts 50-454/99-04 & 50-455/99-04 on 990330-0510.No Violations Noted.Major Areas Inspected:Operations,Maint & Surveillance & Plant Support IR 05000454/19990071999-05-28028 May 1999 Insp Repts 50-454/99-07 & 50-455/99-07 on 990517-20.No Violations Noted.Major Areas Inspected:Fire Protection Program,Aspect of Plant Support IR 05000454/19990051999-05-20020 May 1999 Insp Rept 50-454/99-05 on 990401-22.No Violations Noted. Major Areas Inspected:Adequacy of Licensee Programs, Procedures,Equipment & Supporting Documentation for ISI Program IR 05000454/19990061999-05-19019 May 1999 Insp Repts 50-454/99-06 & 50-455/99-06 on 990419-23.No Violations Noted.Major Areas Inspected:Liquid & Gaseous Effluent Program,Radiological Environ Monitoring Program, Auditing Program & Outage Activities IR 05000454/19990031999-04-14014 April 1999 Insp Repts 50-454/99-03 & 50-455/99-03 on 990217-0329. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000454/19990021999-03-10010 March 1999 Insp Repts 50-454/99-02 & 50-455/99-02 on 990105-0216.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000454/19990011999-02-11011 February 1999 Insp Repts 50-454/99-01 & 50-455/99-01 on 990119-22.No Violations Noted.Major Areas Inspected:Adequacy of Licensee Programs,Procedures,Equipment & Supporting Documentation for Maint of Medium Voltage & Low Voltage Circuit Breakers IR 05000454/19980251999-01-19019 January 1999 Insp Repts 50-454/98-25 & 50-455/98-25 on 981124-990104.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000454/19980241998-12-30030 December 1998 Insp Repts 50-454/98-24 & 50-455/98-24 on 981130-1204.No Violations Noted.Major Areas Inspected:Ro & SRO Requalification Programs,Review of Training Administrative Procedures & Written & Operating Exam Matl IR 05000454/19980201998-12-18018 December 1998 Insp Repts 50-454/98-20 & 50-455/98-20 on 981006-1123.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000454/19980231998-12-17017 December 1998 Insp Repts 50-454/98-23 & 50-455/98-23 on 981116-17.No Violations Noted.Major Areas Inspected:Verification of Adequacy of Training to Plant Operators in Dealing with Fluctuations in Electric Grid Stability IR 05000454/19980221998-12-10010 December 1998 Partially Withheld Insp Repts 50-454/98-22 & 50-455/98-22 on 981116-20 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Selected Aspects of Physical Security Program & Testing of Licensee Access Control Equipment IR 05000454/19980211998-11-0505 November 1998 Insp Repts 50-454/98-21 & 50-455/98-21 on 981013-16.No Violations Noted.Major Areas Inspected:Alara Planning & Radiation Work Permit Programs & Whole Body Counting & Screening Programs IR 05000454/19980191998-10-29029 October 1998 Insp Repts 50-454/98-19 & 50-455/98-19 on 980825-1005.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000454/19980171998-09-18018 September 1998 Insp Repts 50-454/98-17 & 50-455/98-17 on 980714-0824.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint & Engineering IR 05000454/19980161998-07-31031 July 1998 Insp Repts 50-454/98-16 & 50-455/98-16 on 980713-17.No Violations Noted.Major Areas Inspected:Security Equipment Maint,Procedure & Records Review,Personnel Performance, Self Assessment & Previously Identified Issues IR 05000454/19980141998-07-31031 July 1998 Insp Repts 50-454/98-14 & 50-455/98-14 on 980531-0713. Violations Noted.Major Areas Inspected:Operations, Maint/Surveillance,Engineering & Plant Support IR 05000454/19980151998-07-22022 July 1998 Insp Repts 50-454/98-15 & 50-455/98-15 on 980706-09.No Violations Noted.Major Areas inspected:follow-up of April 1997 Maintenance Rule Baseline Insp That Reviewed Licensee Implementation of 10CFR50.65 ML20236H0321998-06-29029 June 1998 Insp Repts 50-454/98-11 & 50-455/98-11 on 980407-0530. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000454/19980101998-05-28028 May 1998 Insp Repts 50-454/98-10 & 50-455/98-10 on 980403-27 & 0506. Violations Noted.Major Areas Inspected:Review of Radiation Protection Program IR 05000454/19980131998-05-26026 May 1998 Insp Repts 50-454/98-13 & 50-455/98-13 on 980415-0508. Violations Noted.Major Areas Inspected:Plant Support ML20217R0141998-05-0505 May 1998 Insp Repts 50-454/98-09 & 50-455/98-09 on 980223-0406. Violations Noted.Major Areas Inspected:Operation, Maint Surveillance & Plant Support ML20217E8671998-03-27027 March 1998 Insp Repts 50-454/98-04 & 50-455/98-04 on 980120-0210. Violations Noted.Major Areas Inspected:Engineering,Technical Support & Self Assessment Activities ML20217E5501998-03-26026 March 1998 Insp Rept 50-454/97-21 on 970919-980228.Violations Noted. Major Areas Inspected:Observations of Operations Training, Preparation for SG Replacement,Maint/Construction Activities & Review of Engineering & Quality Assurance IR 05000454/19980081998-03-20020 March 1998 Insp Repts 50-454/98-08 & 50-455/98-08 on 980302-06. Violations Noted.Major Areas Inspected:Transportation & Solid Radioactive Waste Programs IR 05000454/19980051998-03-16016 March 1998 Insp Repts 50-454/98-05 & 50-455/98-05 on 980113-0223. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000454/19980071998-03-13013 March 1998 Insp Repts 50-454/98-07 & 50-455/98-07 on 980217-25.No Violations Noted.Major Areas Inspected:Various Aspects of Physical Security Program IR 05000454/19980061998-02-17017 February 1998 Insp Repts 50-454/98-06 & 50-455/98-06 on 980120-23 & 26. Noncited Violation Identified.Major Areas Inspected:Review of Radiation Protection Program IR 05000454/19980031998-02-11011 February 1998 Insp Repts 50-454/98-03 & 50-455/98-03 on 980108-27.No Violations Noted.Major Areas Inspected:Review of Security Measures Implemented to Support SG Replacement Project ML20202B9931998-02-0303 February 1998 Insp Repts 50-454/97-24 & 50-455/97-24 on 971202-980112. Violations Noted.Major Areas Inspected:Operations Maint/Surveillance Engineering & Plant Support IR 05000454/19980021998-01-21021 January 1998 Insp Repts 50-454/98-02 & 50-455/98-02 on 980105-09.No Violations Noted.Major Areas Inspected:Review of Emergency Preparedness Program & Aspect of Plant Support IR 05000454/19970231998-01-14014 January 1998 Insp Repts 50-454/97-23 & 50-455/97-23 on 971117-1218. Violations Noted.Major Areas Inspected:Radiological Protection & Chemistry (Rp&C) Controls & Staff Knowledge & Performance in Rp&C ML20199J9091997-12-24024 December 1997 Insp Repts 50-454/97-22 & 50-455/97-22 on 971017-1201. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000454/19970201997-12-0404 December 1997 Insp Repts 50-454/97-20 & 50-455/97-20 on 970909-1016. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support & Security Event That Occurred on 970815 IR 05000454/19970131997-10-30030 October 1997 Insp Rept 50-454/97-13 on 970811-0918.Violations Noted.Major Areas Inspected:Engineering & Plant Efforts for Upcoming Unit 1 SG Replacement Project IR 05000454/19970151997-10-20020 October 1997 Insp Repts 50-454/97-15 & 50-455/97-15 on 970725-0908. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000454/19970191997-10-0202 October 1997 Insp Repts 50-454/97-19 & 50-455/97-19 on 970908-18. Violations Noted & Being Considered for Escalated Enforcement Action.Major Areas Inspected:Several post-fire Safe Shutdown Issues IR 05000454/19970171997-10-0101 October 1997 Insp Repts 50-454/97-17 & 50-455/97-17 on 970825-0912. Violations Noted.Major Areas Inspected:Review of Radiation Protection Program & Planning for SG Replacement Project IR 05000454/19970161997-09-30030 September 1997 Insp Repts 50-454/97-16 & 50-455/97-16 on 970612-0918. Violations Noted.Major Areas Inspected:Review of NRC follow-up Items,Problem Identification Forms,Qa C/A Repts & Emphasis on EOPs & EOP Operator Response Times IR 05000454/19970121997-08-22022 August 1997 Insp Repts 50-454/97-12 & 50-455/97-12 on 970613-0724.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000454/19970141997-08-0101 August 1997 Insp Repts 50-454/97-14 & 50-455/97-14 on 970714-18.No Violations Noted.Major Areas Inspected:Review of Effluent Radiation Monitoring Sys,Cr & Auxiliary Bldg Filtered HVAC & REMP IR 05000454/19970111997-08-0101 August 1997 Insp Repts 50-454/97-11 & 50-455/97-11 on 970630-0707. Violations Noted.Major Areas Inspected:Insp Included Review of Physical Security Program 1999-09-08
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000454/19990121999-10-0808 October 1999 Insp Repts 50-454/99-12 & 50-455/99-12 on 990803-0916.One NCV Occurred.Major Areas Inspected:Operations,Engineering, Maint/Surveillance & Plant Support IR 05000454/19990161999-10-0101 October 1999 Insp Repts 50-454/99-16 & 50-455/99-16 on 990907-10.No Violations Noted.Major Areas Inspected:Radiation Protection & Chemistry Program Included Water Chemistry Control Program & Chemistry Instrument Quality Control Program IR 05000454/19990151999-09-30030 September 1999 Revised Pages Eight Through Eleven to Insp Repts 50-454/99-15 & 50-455/99-15,correcting Inaccuracies with Docket Numbers & Tracking Numbers IR 05000454/19990141999-09-17017 September 1999 Insp Repts 50-454/99-14 & 50-455/99-14 on 990823-27.No Violations Noted.Major Areas Inspected:Physical Security Program ML20211P2001999-09-0808 September 1999 Insp Repts 50-454/99-15 & 50-455/99-15 on 990824-26.No Violations Noted.Major Areas Inspected:Evaluation of Licensee Performance During Exercise of EP IR 05000454/19990101999-08-25025 August 1999 Insp Repts 50-454/99-10 & 50-455/99-10 on 990622-0802.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000254/19990101999-08-20020 August 1999 Insp Repts 50-254/99-10,50-265/99-10,50-454/99-09, 50-455/99-09,50-456/99-10 & 50-457/99-10 on 990628-0721. Major Areas Inspected:Licensee C/A Approach & Implementation of Configuration Control Processes at Each Site IR 05000454/19990081999-07-16016 July 1999 Insp Repts 50-454/99-08 & 50-455/99-08 on 990511-0621.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000454/19990041999-06-0404 June 1999 Insp Repts 50-454/99-04 & 50-455/99-04 on 990330-0510.No Violations Noted.Major Areas Inspected:Operations,Maint & Surveillance & Plant Support IR 05000454/19990071999-05-28028 May 1999 Insp Repts 50-454/99-07 & 50-455/99-07 on 990517-20.No Violations Noted.Major Areas Inspected:Fire Protection Program,Aspect of Plant Support IR 05000454/19990051999-05-20020 May 1999 Insp Rept 50-454/99-05 on 990401-22.No Violations Noted. Major Areas Inspected:Adequacy of Licensee Programs, Procedures,Equipment & Supporting Documentation for ISI Program IR 05000454/19990061999-05-19019 May 1999 Insp Repts 50-454/99-06 & 50-455/99-06 on 990419-23.No Violations Noted.Major Areas Inspected:Liquid & Gaseous Effluent Program,Radiological Environ Monitoring Program, Auditing Program & Outage Activities IR 05000454/19990031999-04-14014 April 1999 Insp Repts 50-454/99-03 & 50-455/99-03 on 990217-0329. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000454/19990021999-03-10010 March 1999 Insp Repts 50-454/99-02 & 50-455/99-02 on 990105-0216.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000454/19990011999-02-11011 February 1999 Insp Repts 50-454/99-01 & 50-455/99-01 on 990119-22.No Violations Noted.Major Areas Inspected:Adequacy of Licensee Programs,Procedures,Equipment & Supporting Documentation for Maint of Medium Voltage & Low Voltage Circuit Breakers IR 05000454/19980251999-01-19019 January 1999 Insp Repts 50-454/98-25 & 50-455/98-25 on 981124-990104.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000454/19980241998-12-30030 December 1998 Insp Repts 50-454/98-24 & 50-455/98-24 on 981130-1204.No Violations Noted.Major Areas Inspected:Ro & SRO Requalification Programs,Review of Training Administrative Procedures & Written & Operating Exam Matl IR 05000454/19980201998-12-18018 December 1998 Insp Repts 50-454/98-20 & 50-455/98-20 on 981006-1123.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000454/19980231998-12-17017 December 1998 Insp Repts 50-454/98-23 & 50-455/98-23 on 981116-17.No Violations Noted.Major Areas Inspected:Verification of Adequacy of Training to Plant Operators in Dealing with Fluctuations in Electric Grid Stability IR 05000454/19980221998-12-10010 December 1998 Partially Withheld Insp Repts 50-454/98-22 & 50-455/98-22 on 981116-20 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Selected Aspects of Physical Security Program & Testing of Licensee Access Control Equipment IR 05000454/19980211998-11-0505 November 1998 Insp Repts 50-454/98-21 & 50-455/98-21 on 981013-16.No Violations Noted.Major Areas Inspected:Alara Planning & Radiation Work Permit Programs & Whole Body Counting & Screening Programs IR 05000454/19980191998-10-29029 October 1998 Insp Repts 50-454/98-19 & 50-455/98-19 on 980825-1005.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000454/19980171998-09-18018 September 1998 Insp Repts 50-454/98-17 & 50-455/98-17 on 980714-0824.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint & Engineering IR 05000454/19980161998-07-31031 July 1998 Insp Repts 50-454/98-16 & 50-455/98-16 on 980713-17.No Violations Noted.Major Areas Inspected:Security Equipment Maint,Procedure & Records Review,Personnel Performance, Self Assessment & Previously Identified Issues IR 05000454/19980141998-07-31031 July 1998 Insp Repts 50-454/98-14 & 50-455/98-14 on 980531-0713. Violations Noted.Major Areas Inspected:Operations, Maint/Surveillance,Engineering & Plant Support IR 05000454/19980151998-07-22022 July 1998 Insp Repts 50-454/98-15 & 50-455/98-15 on 980706-09.No Violations Noted.Major Areas inspected:follow-up of April 1997 Maintenance Rule Baseline Insp That Reviewed Licensee Implementation of 10CFR50.65 ML20236H0321998-06-29029 June 1998 Insp Repts 50-454/98-11 & 50-455/98-11 on 980407-0530. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000454/19980101998-05-28028 May 1998 Insp Repts 50-454/98-10 & 50-455/98-10 on 980403-27 & 0506. Violations Noted.Major Areas Inspected:Review of Radiation Protection Program IR 05000454/19980131998-05-26026 May 1998 Insp Repts 50-454/98-13 & 50-455/98-13 on 980415-0508. Violations Noted.Major Areas Inspected:Plant Support ML20217R0141998-05-0505 May 1998 Insp Repts 50-454/98-09 & 50-455/98-09 on 980223-0406. Violations Noted.Major Areas Inspected:Operation, Maint Surveillance & Plant Support ML20217E8671998-03-27027 March 1998 Insp Repts 50-454/98-04 & 50-455/98-04 on 980120-0210. Violations Noted.Major Areas Inspected:Engineering,Technical Support & Self Assessment Activities ML20217E5501998-03-26026 March 1998 Insp Rept 50-454/97-21 on 970919-980228.Violations Noted. Major Areas Inspected:Observations of Operations Training, Preparation for SG Replacement,Maint/Construction Activities & Review of Engineering & Quality Assurance IR 05000454/19980081998-03-20020 March 1998 Insp Repts 50-454/98-08 & 50-455/98-08 on 980302-06. Violations Noted.Major Areas Inspected:Transportation & Solid Radioactive Waste Programs IR 05000454/19980051998-03-16016 March 1998 Insp Repts 50-454/98-05 & 50-455/98-05 on 980113-0223. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000454/19980071998-03-13013 March 1998 Insp Repts 50-454/98-07 & 50-455/98-07 on 980217-25.No Violations Noted.Major Areas Inspected:Various Aspects of Physical Security Program IR 05000454/19980061998-02-17017 February 1998 Insp Repts 50-454/98-06 & 50-455/98-06 on 980120-23 & 26. Noncited Violation Identified.Major Areas Inspected:Review of Radiation Protection Program IR 05000454/19980031998-02-11011 February 1998 Insp Repts 50-454/98-03 & 50-455/98-03 on 980108-27.No Violations Noted.Major Areas Inspected:Review of Security Measures Implemented to Support SG Replacement Project ML20202B9931998-02-0303 February 1998 Insp Repts 50-454/97-24 & 50-455/97-24 on 971202-980112. Violations Noted.Major Areas Inspected:Operations Maint/Surveillance Engineering & Plant Support IR 05000454/19980021998-01-21021 January 1998 Insp Repts 50-454/98-02 & 50-455/98-02 on 980105-09.No Violations Noted.Major Areas Inspected:Review of Emergency Preparedness Program & Aspect of Plant Support IR 05000454/19970231998-01-14014 January 1998 Insp Repts 50-454/97-23 & 50-455/97-23 on 971117-1218. Violations Noted.Major Areas Inspected:Radiological Protection & Chemistry (Rp&C) Controls & Staff Knowledge & Performance in Rp&C ML20199J9091997-12-24024 December 1997 Insp Repts 50-454/97-22 & 50-455/97-22 on 971017-1201. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000454/19970201997-12-0404 December 1997 Insp Repts 50-454/97-20 & 50-455/97-20 on 970909-1016. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support & Security Event That Occurred on 970815 IR 05000454/19970131997-10-30030 October 1997 Insp Rept 50-454/97-13 on 970811-0918.Violations Noted.Major Areas Inspected:Engineering & Plant Efforts for Upcoming Unit 1 SG Replacement Project IR 05000454/19970151997-10-20020 October 1997 Insp Repts 50-454/97-15 & 50-455/97-15 on 970725-0908. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000454/19970191997-10-0202 October 1997 Insp Repts 50-454/97-19 & 50-455/97-19 on 970908-18. Violations Noted & Being Considered for Escalated Enforcement Action.Major Areas Inspected:Several post-fire Safe Shutdown Issues IR 05000454/19970171997-10-0101 October 1997 Insp Repts 50-454/97-17 & 50-455/97-17 on 970825-0912. Violations Noted.Major Areas Inspected:Review of Radiation Protection Program & Planning for SG Replacement Project IR 05000454/19970161997-09-30030 September 1997 Insp Repts 50-454/97-16 & 50-455/97-16 on 970612-0918. Violations Noted.Major Areas Inspected:Review of NRC follow-up Items,Problem Identification Forms,Qa C/A Repts & Emphasis on EOPs & EOP Operator Response Times IR 05000454/19970121997-08-22022 August 1997 Insp Repts 50-454/97-12 & 50-455/97-12 on 970613-0724.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000454/19970141997-08-0101 August 1997 Insp Repts 50-454/97-14 & 50-455/97-14 on 970714-18.No Violations Noted.Major Areas Inspected:Review of Effluent Radiation Monitoring Sys,Cr & Auxiliary Bldg Filtered HVAC & REMP IR 05000454/19970111997-08-0101 August 1997 Insp Repts 50-454/97-11 & 50-455/97-11 on 970630-0707. Violations Noted.Major Areas Inspected:Insp Included Review of Physical Security Program 1999-09-08
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000454/19990121999-10-0808 October 1999 Insp Repts 50-454/99-12 & 50-455/99-12 on 990803-0916.One NCV Occurred.Major Areas Inspected:Operations,Engineering, Maint/Surveillance & Plant Support IR 05000454/19990161999-10-0101 October 1999 Insp Repts 50-454/99-16 & 50-455/99-16 on 990907-10.No Violations Noted.Major Areas Inspected:Radiation Protection & Chemistry Program Included Water Chemistry Control Program & Chemistry Instrument Quality Control Program IR 05000454/19990151999-09-30030 September 1999 Revised Pages Eight Through Eleven to Insp Repts 50-454/99-15 & 50-455/99-15,correcting Inaccuracies with Docket Numbers & Tracking Numbers IR 05000454/19990141999-09-17017 September 1999 Insp Repts 50-454/99-14 & 50-455/99-14 on 990823-27.No Violations Noted.Major Areas Inspected:Physical Security Program ML20211P2001999-09-0808 September 1999 Insp Repts 50-454/99-15 & 50-455/99-15 on 990824-26.No Violations Noted.Major Areas Inspected:Evaluation of Licensee Performance During Exercise of EP IR 05000454/19990101999-08-25025 August 1999 Insp Repts 50-454/99-10 & 50-455/99-10 on 990622-0802.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000254/19990101999-08-20020 August 1999 Insp Repts 50-254/99-10,50-265/99-10,50-454/99-09, 50-455/99-09,50-456/99-10 & 50-457/99-10 on 990628-0721. Major Areas Inspected:Licensee C/A Approach & Implementation of Configuration Control Processes at Each Site IR 05000454/19990081999-07-16016 July 1999 Insp Repts 50-454/99-08 & 50-455/99-08 on 990511-0621.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000454/19990041999-06-0404 June 1999 Insp Repts 50-454/99-04 & 50-455/99-04 on 990330-0510.No Violations Noted.Major Areas Inspected:Operations,Maint & Surveillance & Plant Support IR 05000454/19990071999-05-28028 May 1999 Insp Repts 50-454/99-07 & 50-455/99-07 on 990517-20.No Violations Noted.Major Areas Inspected:Fire Protection Program,Aspect of Plant Support IR 05000454/19990051999-05-20020 May 1999 Insp Rept 50-454/99-05 on 990401-22.No Violations Noted. Major Areas Inspected:Adequacy of Licensee Programs, Procedures,Equipment & Supporting Documentation for ISI Program IR 05000454/19990061999-05-19019 May 1999 Insp Repts 50-454/99-06 & 50-455/99-06 on 990419-23.No Violations Noted.Major Areas Inspected:Liquid & Gaseous Effluent Program,Radiological Environ Monitoring Program, Auditing Program & Outage Activities IR 05000454/19990031999-04-14014 April 1999 Insp Repts 50-454/99-03 & 50-455/99-03 on 990217-0329. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000454/19990021999-03-10010 March 1999 Insp Repts 50-454/99-02 & 50-455/99-02 on 990105-0216.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000454/19990011999-02-11011 February 1999 Insp Repts 50-454/99-01 & 50-455/99-01 on 990119-22.No Violations Noted.Major Areas Inspected:Adequacy of Licensee Programs,Procedures,Equipment & Supporting Documentation for Maint of Medium Voltage & Low Voltage Circuit Breakers IR 05000454/19980251999-01-19019 January 1999 Insp Repts 50-454/98-25 & 50-455/98-25 on 981124-990104.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000454/19980241998-12-30030 December 1998 Insp Repts 50-454/98-24 & 50-455/98-24 on 981130-1204.No Violations Noted.Major Areas Inspected:Ro & SRO Requalification Programs,Review of Training Administrative Procedures & Written & Operating Exam Matl IR 05000454/19980201998-12-18018 December 1998 Insp Repts 50-454/98-20 & 50-455/98-20 on 981006-1123.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000454/19980231998-12-17017 December 1998 Insp Repts 50-454/98-23 & 50-455/98-23 on 981116-17.No Violations Noted.Major Areas Inspected:Verification of Adequacy of Training to Plant Operators in Dealing with Fluctuations in Electric Grid Stability IR 05000454/19980221998-12-10010 December 1998 Partially Withheld Insp Repts 50-454/98-22 & 50-455/98-22 on 981116-20 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Selected Aspects of Physical Security Program & Testing of Licensee Access Control Equipment IR 05000454/19980211998-11-0505 November 1998 Insp Repts 50-454/98-21 & 50-455/98-21 on 981013-16.No Violations Noted.Major Areas Inspected:Alara Planning & Radiation Work Permit Programs & Whole Body Counting & Screening Programs IR 05000454/19980191998-10-29029 October 1998 Insp Repts 50-454/98-19 & 50-455/98-19 on 980825-1005.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000454/19980171998-09-18018 September 1998 Insp Repts 50-454/98-17 & 50-455/98-17 on 980714-0824.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint & Engineering IR 05000454/19980161998-07-31031 July 1998 Insp Repts 50-454/98-16 & 50-455/98-16 on 980713-17.No Violations Noted.Major Areas Inspected:Security Equipment Maint,Procedure & Records Review,Personnel Performance, Self Assessment & Previously Identified Issues IR 05000454/19980141998-07-31031 July 1998 Insp Repts 50-454/98-14 & 50-455/98-14 on 980531-0713. Violations Noted.Major Areas Inspected:Operations, Maint/Surveillance,Engineering & Plant Support IR 05000454/19980151998-07-22022 July 1998 Insp Repts 50-454/98-15 & 50-455/98-15 on 980706-09.No Violations Noted.Major Areas inspected:follow-up of April 1997 Maintenance Rule Baseline Insp That Reviewed Licensee Implementation of 10CFR50.65 ML20236H0321998-06-29029 June 1998 Insp Repts 50-454/98-11 & 50-455/98-11 on 980407-0530. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000454/19980101998-05-28028 May 1998 Insp Repts 50-454/98-10 & 50-455/98-10 on 980403-27 & 0506. Violations Noted.Major Areas Inspected:Review of Radiation Protection Program IR 05000454/19980131998-05-26026 May 1998 Insp Repts 50-454/98-13 & 50-455/98-13 on 980415-0508. Violations Noted.Major Areas Inspected:Plant Support ML20217R0141998-05-0505 May 1998 Insp Repts 50-454/98-09 & 50-455/98-09 on 980223-0406. Violations Noted.Major Areas Inspected:Operation, Maint Surveillance & Plant Support ML20217E8671998-03-27027 March 1998 Insp Repts 50-454/98-04 & 50-455/98-04 on 980120-0210. Violations Noted.Major Areas Inspected:Engineering,Technical Support & Self Assessment Activities ML20217E5501998-03-26026 March 1998 Insp Rept 50-454/97-21 on 970919-980228.Violations Noted. Major Areas Inspected:Observations of Operations Training, Preparation for SG Replacement,Maint/Construction Activities & Review of Engineering & Quality Assurance IR 05000454/19980081998-03-20020 March 1998 Insp Repts 50-454/98-08 & 50-455/98-08 on 980302-06. Violations Noted.Major Areas Inspected:Transportation & Solid Radioactive Waste Programs IR 05000454/19980051998-03-16016 March 1998 Insp Repts 50-454/98-05 & 50-455/98-05 on 980113-0223. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000454/19980071998-03-13013 March 1998 Insp Repts 50-454/98-07 & 50-455/98-07 on 980217-25.No Violations Noted.Major Areas Inspected:Various Aspects of Physical Security Program IR 05000454/19980061998-02-17017 February 1998 Insp Repts 50-454/98-06 & 50-455/98-06 on 980120-23 & 26. Noncited Violation Identified.Major Areas Inspected:Review of Radiation Protection Program IR 05000454/19980031998-02-11011 February 1998 Insp Repts 50-454/98-03 & 50-455/98-03 on 980108-27.No Violations Noted.Major Areas Inspected:Review of Security Measures Implemented to Support SG Replacement Project ML20202B9931998-02-0303 February 1998 Insp Repts 50-454/97-24 & 50-455/97-24 on 971202-980112. Violations Noted.Major Areas Inspected:Operations Maint/Surveillance Engineering & Plant Support IR 05000454/19980021998-01-21021 January 1998 Insp Repts 50-454/98-02 & 50-455/98-02 on 980105-09.No Violations Noted.Major Areas Inspected:Review of Emergency Preparedness Program & Aspect of Plant Support IR 05000454/19970231998-01-14014 January 1998 Insp Repts 50-454/97-23 & 50-455/97-23 on 971117-1218. Violations Noted.Major Areas Inspected:Radiological Protection & Chemistry (Rp&C) Controls & Staff Knowledge & Performance in Rp&C ML20199J9091997-12-24024 December 1997 Insp Repts 50-454/97-22 & 50-455/97-22 on 971017-1201. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000454/19970201997-12-0404 December 1997 Insp Repts 50-454/97-20 & 50-455/97-20 on 970909-1016. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support & Security Event That Occurred on 970815 IR 05000454/19970131997-10-30030 October 1997 Insp Rept 50-454/97-13 on 970811-0918.Violations Noted.Major Areas Inspected:Engineering & Plant Efforts for Upcoming Unit 1 SG Replacement Project IR 05000454/19970151997-10-20020 October 1997 Insp Repts 50-454/97-15 & 50-455/97-15 on 970725-0908. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000454/19970191997-10-0202 October 1997 Insp Repts 50-454/97-19 & 50-455/97-19 on 970908-18. Violations Noted & Being Considered for Escalated Enforcement Action.Major Areas Inspected:Several post-fire Safe Shutdown Issues IR 05000454/19970171997-10-0101 October 1997 Insp Repts 50-454/97-17 & 50-455/97-17 on 970825-0912. Violations Noted.Major Areas Inspected:Review of Radiation Protection Program & Planning for SG Replacement Project IR 05000454/19970161997-09-30030 September 1997 Insp Repts 50-454/97-16 & 50-455/97-16 on 970612-0918. Violations Noted.Major Areas Inspected:Review of NRC follow-up Items,Problem Identification Forms,Qa C/A Repts & Emphasis on EOPs & EOP Operator Response Times IR 05000454/19970121997-08-22022 August 1997 Insp Repts 50-454/97-12 & 50-455/97-12 on 970613-0724.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000454/19970141997-08-0101 August 1997 Insp Repts 50-454/97-14 & 50-455/97-14 on 970714-18.No Violations Noted.Major Areas Inspected:Review of Effluent Radiation Monitoring Sys,Cr & Auxiliary Bldg Filtered HVAC & REMP IR 05000454/19970111997-08-0101 August 1997 Insp Repts 50-454/97-11 & 50-455/97-11 on 970630-0707. Violations Noted.Major Areas Inspected:Insp Included Review of Physical Security Program 1999-09-08
[Table view] Category:UTILITY
MONTHYEARIR 05000455/19900211990-11-14014 November 1990 Insp Rept 50-455/90-21 on 900910-11,24-26 & 1107.No Violations or Deviations Noted.Major Areas Inspected: Inservice Insp Activities Including Review of Program, Procedures,Observation of Work Activities & Data Review IR 05000455/19900221990-11-13013 November 1990 Insp Rept 50-455/90-22 on 901002-1107.One Violation Noted. Major Areas Inspected:Circumstances Re Closed Unit 2 Intermediate Head Safety Injection Throttle valve,2518822A ML20058G3741990-11-0505 November 1990 Page 9 to Insp Repts 50-454/90-16 & 50-455/90-15,erroneously Deleted from Original Rept IR 05000454/19900161990-08-29029 August 1990 Insp Repts 50-454/90-16 & 50-455/90-15 on 900814-17.No Violations Noted.Major Areas Inspected:Emergency Prepardness Exercise,Licensee Action on Previously Identified Items & Status of Onsite Meteorological Monitoring Program IR 05000454/19900171990-08-17017 August 1990 Insp Repts 50-454/90-17 & 50-455/90-16 on 900701-0811.No Violations or Deviations Noted.Major Areas Inspected:Esf Sys,Onsite Event Follow Up,Reactor Startup,Current Matl Condition,Radiological Controls & Security IR 05000454/19900141990-07-16016 July 1990 Safety Insp Rept 50-454/90-14 & 50-455/90-13 on 900513-0630. Major Areas Inspected:Operational Safety,Esf Sys,Onsite Event follow-up,current Matl Condition,Security,Radiological Controls & Self Assessment/Quality Verification IR 05000454/19900151990-06-26026 June 1990 Insp Repts 50-454/90-15 & 50-455/90-14 on 900611-14.No Violations or Deviations Noted.Major Areas Inspected: Radiological Protection Program Including,Changes,Audits & Surveillances,External & Maint Exposure Control IR 05000454/19890161989-08-30030 August 1989 Safety Insp Repts 50-454/89-16 & 50-455/89-18 on 890701-0819.Violations Noted.Major Areas Inspected:Plant Matl Condition,Operational Safety,Mud in Essential Svc Water Sys,Security & Discrepancy Records IR 05000454/19890141989-07-11011 July 1989 Safety Insp Repts 50-454/89-14 & 50-455/89-16 on 890518-0630.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety,Esf Sys Walkdown,Fire Protection,Event Followup & Maint/Surveillance IR 05000454/19890151989-07-0707 July 1989 Insp Repts 50-454/89-15 & 50-455/89-17 on 890612-20.No Violations Noted.Major Areas Inspected:Radiological Protection Program During Power Operation,Including Changes in Organization,Audits & Training & Qualification IR 05000454/19890101989-06-0505 June 1989 Insp Repts 50-454/89-10 & 50-455/89-12 on 890401-0517.No Violations or Deviations Noted.Major Areas Inspected: Operational Safety,Event Followup,Mud Buildup in Essential Svc Water Lines,Security & LERs IR 05000454/19890131989-05-24024 May 1989 Insp Repts 50-454/89-13 & 50-455/89-15 on 890424-28.No Violations Noted.Major Areas Inspected:Chemistry Program, Including Procedures,Organization & Training & Primary & Secondary Sys Water QC Programs IR 05000454/19890081989-04-24024 April 1989 Partially Withheld Physical Security Insp Repts 50-454/89-08 & 50-455/89-11 on 890327-0403 (Ref 10CFR73.21(c)(2)).No Violations Noted.Major Areas Inspected:Mgt Support - Security Program Audits & Protected Alarm Barriers IR 05000454/19890041989-04-19019 April 1989 Insp Repts 50-454/89-04 & 50-455/89-07 on 890217-0331. Violations Noted.Major Areas Inspected:Operational Safety, Event Followup,Maint/Surveillance,Plant Startup from Refueling & Use of under-rated Gaskets in Manways IR 05000454/19890091989-04-12012 April 1989 Insp Repts 50-454/89-09 & 50-455/89-06 on 890227-0316. Violations Noted.Major Areas Inspected:Design Changes & Mods & Dedication of Commercial Grade Equipment for safety-related Applications IR 05000454/19890071989-03-31031 March 1989 Insp Repts 50-454/89-07 & 50-455/89-10 on 890313-17 & 22. Violation Noted.Major Areas Inspected:Implementation of Inservice Testing,Including Administrative & Technical Procedures,Performance of Testing & Retention of Records IR 05000454/19890031989-03-23023 March 1989 Physical Security Insp Repts 50-454/89-03 & 50-455/89-05 on 890201-0303.Major Areas Inspected:Licensee Plans for Coping W/Strikes,Licensee Initial Implementation of Strike Plan & Return to Normal Security Operations IR 05000454/19890021989-03-0202 March 1989 Insp Repts 50-454/89-02 & 50-455/89-02 on 890123-0206.No Violations Noted.Major Areas Inspected:Implementation of Fire Protection Program.Weaknesses Noted in Control of Transient Combustible Matls & Control of Flammable Liquids IR 05000454/19890011989-02-28028 February 1989 Safety Insp Repts 50-454/89-01 & 50-455/89-01 on 890101- 0216.Major Areas Inspected:Licensee Action on Previous Insp Findings,Operational Safety,Event Followup & Refueling & Spent Fuel Pit Activities.Util Identified Violation Noted IR 05000455/19890031989-02-27027 February 1989 Insp Rept 50-455/89-03 on 890118,24-26,31 & 0207,09,15 & 16. No Violations or Deviations Noted.Major Areas Inspected: Inservice Insp Activities,Including Programs,Procedures, Observation of Work Activities & Data Review IR 05000454/19880171988-10-19019 October 1988 Insp Rept 50-454/88-17 on 880914,20-22,27-29 & 1017.No Violations Noted.Major Areas Inspected:Inservice Insp Activities,Including Review of Program (73051),procedures (73052) & Observation of Work activities(73753) ML20207N8801988-10-12012 October 1988 Insp Rept 50-454/88-19 on 880919-28.Violations Noted: Inadequate Procedures for Installation & Use of Tygon Tubing for RCS Level Indication.Major Areas Inspected:Loss of Train of RHR When Water Level in RCS Lowered on 880919 IR 05000454/19880161988-10-0505 October 1988 Safety Insp Repts 50-454/88-16 & 50-455/88-15 on 880816- 0930.Violations Noted.Major Areas Inspected:Previous Insp Findings,Operations Summary,Training & Refueling & Spent Fuel Pit Activities IR 05000454/19880181988-10-0303 October 1988 Insp Repts 50-454/88-18 & 50-455/88-16 on 880919-22.No Violations Noted.Major Areas Inspected:Action on Previously Identified Items,Emergency Plan Activations & Status of Emergency Preparedness Program.Two Open Items Identified IR 05000454/19880131988-09-13013 September 1988 Team Insp Repts 50-454/88-13 & 50-455/88-13 on 880801-12.No Violations Noted.Major Areas Inspected:Operation Radiation Protection,Radwaste Mgt & Nonradiological Chemistry Programs,Including Health Physics Organization IR 05000454/19880141988-08-29029 August 1988 Safety Insp Rept 50-454/88-14 on 880810-12.No Violations or Deviations Noted.Major Areas Inspected:Facility Mods Associated W/Snubber Reduction,Training & Licensee Action on Previous Insp Findings IR 05000454/19880111988-08-19019 August 1988 Safety Insp Repts 50-454/88-11 & 50-455/88-11 on 880701- 0815.Violation Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings,Lers,Bulletin Followup,Operations Summary,Training,Refueling,Surveillance & Maint IR 05000454/19880101988-07-14014 July 1988 Partially Withheld Insp Repts 50-454/88-10 & 50-455/88-10 on 880623-0701 (Ref 10CFR73.21).No Violation Noted.Major Areas Inspected:Mgt Effectiveness - Security,Security Program Audits,Testing & Maint & Communications IR 05000454/19880091988-07-11011 July 1988 Safety Insp Repts 50-454/88-09 & 50-455/88-09 on 880517- 0630.Violations Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings,Lers,Bulletins,Generic Ltrs, Operations Summary,Training & Spent Fuel Storage Racks IR 05000454/19880071988-06-0101 June 1988 Safety Insp Repts 50-454/88-07 & 50-455/88-07 on 880401- 0516.Violations Noted.Major Areas Inspected:Util Action on Previous Insp Findings,Lers,Bulletins,Operations Summary, Engineering & Technical Support & QA Programs IR 05000454/19880081988-05-27027 May 1988 Insp Repts 50-454/88-08,50-455/88-08 & 50-456/88-16 on 880509-19.No Violations or Deviations Noted.Major Areas Inspected:Review of Action on Previous Insp Items & Followup on SER Items IR 05000454/19880061988-04-11011 April 1988 Safety Insp Repts 50-454/88-06 & 50-455/88-06 on 880212-0331.No Violations Noted.Major Areas Inspected: Licensee Action on Previous Insp Findings,Lers,Bulletins, Generic Ltrs,Operations Summary,Training & Surveillance IR 05000454/19880051988-03-28028 March 1988 Safety Insp Repts 50-454/88-05 & 50-455/88-04 on 880113-0317.No Violations or Deviations Noted.Major Areas Inspected:Licensee Actions on Previous Insp Findings,Startup Test Results Evaluation & Startup Test Results Verification IR 05000456/19880061988-03-0909 March 1988 Safety Insp Repts 50-456/88-06 & 50-457/88-08 on 880216-25. No Violations or Deviations Noted.Major Area Inspected: Licensee Implementation of Generic Ltr 83-28 in Areas of Equipment Classification & Vendor Interface IR 05000454/19880031988-02-26026 February 1988 Insp Repts 50-454/88-03 & 50-455/88-03 on 880111-0217. Violations Noted.Major Areas Inspected:Licensee Action on Previously Identified Finding,Ser/Technical Evaluation Rept Commitment & Environ Qualification Program Compliance IR 05000454/19880021988-02-24024 February 1988 Safety Insp Repts 50-454/88-02 & 50-455/88-02 on 880101- 0211.Violation Noted.Major Areas Inspected:Previous Insp Findings,Lers,Operations Summary,Training,Surveillance,Maint & Operational Safety,Esf Sys Walkdown & Info Notices ML20147H3091988-01-14014 January 1988 Safety Insp Repts 50-454/87-27 & 50-455/87-25 on 870707-09 & 0820-21.Violations Noted.Major Areas Inspected:Previous Insp Findings,Observation of Maint Surveillance Activities & Training IR 05000454/19870441988-01-0808 January 1988 Insp Repts 50-454/87-44 & 50-455/87-42 on 871208-11.No Violations or Deviations Noted.Major Areas Inspected: Operational Radiation Protection Activities During Surveillance Outage,Including Organization & Mgt Control IR 05000454/19870431988-01-0808 January 1988 Insp Repts 50-454/87-43 & 50-455/87-40 on 871201-31.No Violations or Deviations Noted.Major Areas Inspected:Util Actions on Previous Insp Findings,Bulletins,Lers,Operations Summary,Training,Local Leak Rate Testing & Surveillance IR 05000454/19870421987-12-11011 December 1987 Insp Repts 50-454/87-42 & 50-455/87-39 on 871118-20,23 & 24. No Violations or Deviations Noted.Major Areas Inspected:Qa, Confirmatory Measurements for in-plant Radiochemical Analyses & Organizaton & Mgt Control IR 05000454/19870411987-12-0909 December 1987 Insp Repts 50-454/87-41 & 50-455/87-38 on 871031-1130.No Violation or Deviation Noted.Major Areas Inspected:Lers, Generic Ltrs,Operations Summary,Training,Surveillance,Maint, Operational Safety,Allegations & Mgt Changes IR 05000454/19870391987-11-19019 November 1987 Safety Insp Repts 50-454/87-39 & 50-455/87-36 on 871002-30. No Violations or Deviations Noted.Major Areas Inspected: Licensee Action on Previous Insp Findings,Operations Summary,Design Changes & Mods,Training & Surveillance IR 05000454/19870401987-11-0202 November 1987 Insp Repts 50-454/87-40 & 50-455/87-34 on 871013-15.No Violations,Deficiencies or Deviations Noted.Major Areas Inspected:Emergency Preparedness Exercise,Including Key Functions & Locations During Exercise.Related Info Encl IR 05000454/19870381987-10-13013 October 1987 Insp Repts 50-454/87-38 & 50-455/87-35 on 870901-1001. Violation Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings,Lers,Operations Summary,Training, Surveillance,Maint,Operational Safety & Allegations IR 05000454/19870361987-09-23023 September 1987 Insp Repts 50-454/87-36 & 50-455/87-33 on 870831-0904.No Violations or Deviations Noted.Major Areas Inspected: Chemistry Program,Procedures,Organization,Training,Qa,Water Quality Control & Confirmatory Measurements IR 05000454/19870341987-09-21021 September 1987 Insp Repts 50-454/87-34 & 50-455/87-32 on 870824-0904.No Violations or Deviations Noted.Major Areas Inspected: Operational Radiation Protection & Transportation Activities,Including Organization & Mgt Control IR 05000454/19870351987-09-14014 September 1987 Partially Withheld Physical Security Insp Repts 50-454/87-35 & 50-455/87-32 on 870817-21 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Review of Records & Repts,Keys & Combinations & Physical Barriers - Vital Areas IR 05000454/19870331987-09-10010 September 1987 Safety Insp Repts 50-454/87-33 & 50-455/87-31 on 870801-31. No Violations or Deviations Noted.Major Areas Inspected: Operations Summary,Training,Surveillance,Maint,Operational Safety & ESF Walkdown,Headquarters Request & Event Followup ML20234D2531987-09-10010 September 1987 Insp Repts 50-454/87-32,50-455/87-30 & 50-456/87-28 on 870810-17.No Violations Noted.Major Areas Inspected: Emergency Operation Procedures IR 05000454/19870301987-08-31031 August 1987 Special Fitness for Duty Program Insp Repts 50-454/87-30 & 50-455/87-28 on 870713-17.Major Areas Inspected:Policies, Procedures & Practices of Fitness Duty Program & Employee Assistance Program 1990-08-29
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000454/19990121999-10-0808 October 1999 Insp Repts 50-454/99-12 & 50-455/99-12 on 990803-0916.One NCV Occurred.Major Areas Inspected:Operations,Engineering, Maint/Surveillance & Plant Support IR 05000454/19990161999-10-0101 October 1999 Insp Repts 50-454/99-16 & 50-455/99-16 on 990907-10.No Violations Noted.Major Areas Inspected:Radiation Protection & Chemistry Program Included Water Chemistry Control Program & Chemistry Instrument Quality Control Program IR 05000454/19990151999-09-30030 September 1999 Revised Pages Eight Through Eleven to Insp Repts 50-454/99-15 & 50-455/99-15,correcting Inaccuracies with Docket Numbers & Tracking Numbers IR 05000454/19990141999-09-17017 September 1999 Insp Repts 50-454/99-14 & 50-455/99-14 on 990823-27.No Violations Noted.Major Areas Inspected:Physical Security Program ML20211P2001999-09-0808 September 1999 Insp Repts 50-454/99-15 & 50-455/99-15 on 990824-26.No Violations Noted.Major Areas Inspected:Evaluation of Licensee Performance During Exercise of EP PNO-III-99-041, on 990902,employees at Station Reported Feeling Ground Motion Associated with Earthquake.Plant Staff Checked Plant Sys & Equipment & No Evidence of Damage Was Found1999-09-0303 September 1999 PNO-III-99-041:on 990902,employees at Station Reported Feeling Ground Motion Associated with Earthquake.Plant Staff Checked Plant Sys & Equipment & No Evidence of Damage Was Found IR 05000454/19990101999-08-25025 August 1999 Insp Repts 50-454/99-10 & 50-455/99-10 on 990622-0802.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000254/19990101999-08-20020 August 1999 Insp Repts 50-254/99-10,50-265/99-10,50-454/99-09, 50-455/99-09,50-456/99-10 & 50-457/99-10 on 990628-0721. Major Areas Inspected:Licensee C/A Approach & Implementation of Configuration Control Processes at Each Site IR 05000454/19990081999-07-16016 July 1999 Insp Repts 50-454/99-08 & 50-455/99-08 on 990511-0621.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000454/19990041999-06-0404 June 1999 Insp Repts 50-454/99-04 & 50-455/99-04 on 990330-0510.No Violations Noted.Major Areas Inspected:Operations,Maint & Surveillance & Plant Support IR 05000454/19990071999-05-28028 May 1999 Insp Repts 50-454/99-07 & 50-455/99-07 on 990517-20.No Violations Noted.Major Areas Inspected:Fire Protection Program,Aspect of Plant Support IR 05000454/19990051999-05-20020 May 1999 Insp Rept 50-454/99-05 on 990401-22.No Violations Noted. Major Areas Inspected:Adequacy of Licensee Programs, Procedures,Equipment & Supporting Documentation for ISI Program IR 05000454/19990061999-05-19019 May 1999 Insp Repts 50-454/99-06 & 50-455/99-06 on 990419-23.No Violations Noted.Major Areas Inspected:Liquid & Gaseous Effluent Program,Radiological Environ Monitoring Program, Auditing Program & Outage Activities IR 05000454/19990031999-04-14014 April 1999 Insp Repts 50-454/99-03 & 50-455/99-03 on 990217-0329. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000454/19990021999-03-10010 March 1999 Insp Repts 50-454/99-02 & 50-455/99-02 on 990105-0216.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000454/19990011999-02-11011 February 1999 Insp Repts 50-454/99-01 & 50-455/99-01 on 990119-22.No Violations Noted.Major Areas Inspected:Adequacy of Licensee Programs,Procedures,Equipment & Supporting Documentation for Maint of Medium Voltage & Low Voltage Circuit Breakers ML20199H8811999-01-19019 January 1999 Notice of Violation from Insp on 981124-990104.Violation Noted:From 871029 to 981123,test Controls for Stroke Time Testing of AFW Pump Discharge Valves Were Not Properly Established IR 05000454/19980251999-01-19019 January 1999 Insp Repts 50-454/98-25 & 50-455/98-25 on 981124-990104.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000454/19980241998-12-30030 December 1998 Insp Repts 50-454/98-24 & 50-455/98-24 on 981130-1204.No Violations Noted.Major Areas Inspected:Ro & SRO Requalification Programs,Review of Training Administrative Procedures & Written & Operating Exam Matl IR 05000454/19980201998-12-18018 December 1998 Insp Repts 50-454/98-20 & 50-455/98-20 on 981006-1123.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000454/19980231998-12-17017 December 1998 Insp Repts 50-454/98-23 & 50-455/98-23 on 981116-17.No Violations Noted.Major Areas Inspected:Verification of Adequacy of Training to Plant Operators in Dealing with Fluctuations in Electric Grid Stability IR 05000454/19980221998-12-10010 December 1998 Partially Withheld Insp Repts 50-454/98-22 & 50-455/98-22 on 981116-20 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Selected Aspects of Physical Security Program & Testing of Licensee Access Control Equipment IR 05000454/19980211998-11-0505 November 1998 Insp Repts 50-454/98-21 & 50-455/98-21 on 981013-16.No Violations Noted.Major Areas Inspected:Alara Planning & Radiation Work Permit Programs & Whole Body Counting & Screening Programs IR 05000454/19983011998-11-0303 November 1998 NRC Operator Licensing Exam Repts 50-454/98-301(OL) & 50-455/98-301(OL) for Tests Administered on 980914-22.Out of Five License Applicants,One SRO Passed All Portions of Exam. Two RO & Two SRO Applicants Failed Portions of Exam IR 05000454/19980191998-10-29029 October 1998 Insp Repts 50-454/98-19 & 50-455/98-19 on 980825-1005.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000454/19980171998-09-18018 September 1998 Insp Repts 50-454/98-17 & 50-455/98-17 on 980714-0824.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint & Engineering ML20153D7701998-09-18018 September 1998 Notice of Violation from Insp on 980714-0824.Violation Noted:During 980616-18,AP 1100-3,Rev 11,inappropriate to Circumstances,In That Procedural Guidance Led to Belief That Main CR Ventilation Envelope Altered When CR Doors Opened ML20236W2081998-07-31031 July 1998 Notice of Violation from Insp on 980531-0713.Violation Noted:As of 980713,SF Storage Pool Design Would Not Have Prevented Inadvertent Draining Below 423 Feet 2 Inches IR 05000454/19980161998-07-31031 July 1998 Insp Repts 50-454/98-16 & 50-455/98-16 on 980713-17.No Violations Noted.Major Areas Inspected:Security Equipment Maint,Procedure & Records Review,Personnel Performance, Self Assessment & Previously Identified Issues IR 05000454/19980141998-07-31031 July 1998 Insp Repts 50-454/98-14 & 50-455/98-14 on 980531-0713. Violations Noted.Major Areas Inspected:Operations, Maint/Surveillance,Engineering & Plant Support IR 05000454/19980151998-07-22022 July 1998 Insp Repts 50-454/98-15 & 50-455/98-15 on 980706-09.No Violations Noted.Major Areas inspected:follow-up of April 1997 Maintenance Rule Baseline Insp That Reviewed Licensee Implementation of 10CFR50.65 ML20236H0291998-06-29029 June 1998 Notice of Violation from Insp on 980407-0530.Violation Noted:On 980502,OOS 970012670 Not Sufficient to Isolate Equipment Being Worked on ML20236H0321998-06-29029 June 1998 Insp Repts 50-454/98-11 & 50-455/98-11 on 980407-0530. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20248C0441998-05-28028 May 1998 Notice of Violation from Insp on 980403-27 & 0506.Violations Noted:Radiologically Posted Area Established for sodium-24 Used in Moisture Carryover Test Was Not Posted W/Sign Bearing Radiation Symbol & Listed Words IR 05000454/19980101998-05-28028 May 1998 Insp Repts 50-454/98-10 & 50-455/98-10 on 980403-27 & 0506. Violations Noted.Major Areas Inspected:Review of Radiation Protection Program IR 05000454/19980131998-05-26026 May 1998 Insp Repts 50-454/98-13 & 50-455/98-13 on 980415-0508. Violations Noted.Major Areas Inspected:Plant Support ML20248B0931998-05-26026 May 1998 Notice of Violation from Insp on 980415-0508.Violation Noted:Ffd Program Was Not Appropriately Implemented ML20248C7271998-05-21021 May 1998 Errata to Notice of Violation from Insp on 980113-0223 W/Combined Violations ML20217Q9671998-05-0505 May 1998 Notice of Violation from Insp on 980224-0406.Violations Noted:Unit 1 Changed Operational Mode from Mode 5 to Mode 4 When Conditions for LCO of TS 3.4.6.1.b Were Not Met & Associated Action Required Shutdown within Specified Time ML20217R0141998-05-0505 May 1998 Insp Repts 50-454/98-09 & 50-455/98-09 on 980223-0406. Violations Noted.Major Areas Inspected:Operation, Maint Surveillance & Plant Support ML20217E8421998-03-27027 March 1998 Notice of Violation from Insp on 980120-0210.Violation Noted:On 960607,team Identified That Field Change Request (Fcr) 960062 Was Not Subjected to Design Control Measures Commensurate W/Measures Applied to Original Design ML20217E8671998-03-27027 March 1998 Insp Repts 50-454/98-04 & 50-455/98-04 on 980120-0210. Violations Noted.Major Areas Inspected:Engineering,Technical Support & Self Assessment Activities ML20217E5501998-03-26026 March 1998 Insp Rept 50-454/97-21 on 970919-980228.Violations Noted. Major Areas Inspected:Observations of Operations Training, Preparation for SG Replacement,Maint/Construction Activities & Review of Engineering & Quality Assurance ML20217E5261998-03-26026 March 1998 Notice of Violation from Insp on 970919-980226.Violations Noted:Licensee Contracted Level II Liquid Penetrant Exam Examiner Incorrectly Performed Liquid Penetrant Exam of SG IR 05000454/19980081998-03-20020 March 1998 Insp Repts 50-454/98-08 & 50-455/98-08 on 980302-06. Violations Noted.Major Areas Inspected:Transportation & Solid Radioactive Waste Programs ML20217D1031998-03-20020 March 1998 Notice of Violation from Insp on 980302-06.Violation Noted: on 980306,chemistry Technician Failed to Close Valve V8 Before Withdrawing 2 Gas Samples from Panel for Hydrogen & Isotopic Analyses ML20248L8161998-03-16016 March 1998 Notice of Violation from Insp on 980113-0223.Violations Noted:On 980117,plant Administrative Procedure 330-1,section c.b.c.4,not Implemented & on 970910,licensee Operated Gwps Differently from Ufsar,Section 11.3.2.1 IR 05000454/19980051998-03-16016 March 1998 Insp Repts 50-454/98-05 & 50-455/98-05 on 980113-0223. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000454/19980071998-03-13013 March 1998 Insp Repts 50-454/98-07 & 50-455/98-07 on 980217-25.No Violations Noted.Major Areas Inspected:Various Aspects of Physical Security Program IR 05000454/19980061998-02-17017 February 1998 Insp Repts 50-454/98-06 & 50-455/98-06 on 980120-23 & 26. Noncited Violation Identified.Major Areas Inspected:Review of Radiation Protection Program 1999-09-08
[Table view] |
Inspection Report - Byron - 1985015 |
---|
|
|
Text
. ,.
U.S. NUCLEAR REGULATORY COMMISSION
REGION III
Reports No. 50-454/85015(DRSS); 50-455/85010(DRSS)
Docket Nos. 50-454; 50-455 Licenses No. NPF-23; CPPR-131 Licensee: Commorwealth Edison Company Post Office Box 767 Chicago, Illinois 60690 Facility Name: Byron' Nuclear Generating Station, Units 1 and 2 Inspection At: Byron Site, Byron, Illinois Inspection Conducted: June 10-13, 1985 Inspectors:
$$h T. Ploski
'
Team Leader Date
'
y. Patterson Date'
h$h 7/8/Is'
Date
-
Ji Approved By: W. P. Phillips, Chief Efnergency Preparedness Section Dath /
8[f[
Inspection Summary Inspection on June 10-13, 1985 (Reports No. 50-454/85015(DRSS);
50-455/85010(ORSS)
Areas Inspected: Routine, announced inspection of the Byron Nuclear Generating Station's emergency preparedness exercise, involving observations by seven NRC representatives of key functions and locations during the exercise. The inspection involved 155 inspector-hours onsite by three NRC inspectors and four consultant Results: No~ items of noncompliance, deficiencies, or deviations were identifie However, one_ exercise weakness was. identified as summarized in the Appendi PDR ADOCK 05000454 G PDR-L.
k:
}
< . .
DETAILS Persons Contacted NRC Observers and Areas Observed T. Ploski, Control Room, Technical Support Center (TSC)
J. Patterson, Emergency Operations Facility (E0F)
M. Smith, E0F and Joint Public Information Center (JPIC)
K. Loposer, Control Room, Operational Support Center (OSC), Inplant Health Physics Teams G. Stoetzel, OSC and Inplant Health Phys.ics Teams R. Campbell, TSC T. Lonergan, Fire Drill and Radiological Environmental Monitoring'
Teams Commonwealth Edison Personnel
- R. Querto, Station Superintendent, Observer
- G. Wagner, P.ower Operations Manager, Recovery Manager
- Pleniewicz, Assistant Superintendent for Operations, Station Director
- J. Golden, Controller, E0F
- T. Blackmon, Controller, E0F
- Whitemore, Controller, TSC
- D. Vestal, Controller, Control Room
- A. Chomacke, Lead Controller, Control Room
- B. Schnell, Controller, OSC
- Chrzanowski, Security Administrator
- D. Bump, Quality Assurance Staff M. Vonk, Controller, TSC T. Greene, Controller, Environs Team L. Duchek, Controller, Environs Team K. Licari, Controller, JPIC W. Biskie, Administrative Assistant for Construction Non-Commonwealth Edison Personnel J. Becker, Project Manager G. Vanderhei, Project Manager R.-Weiss, Project Manager
- Indicates those who attended the June 12, 1985 exit intervie . -Licensee Action on Previously-Identified Items (Closed) Open Item Nos. 50-454/85010-01 and 50-455/85007-01: Include in the annual emergency response training provided to those contractor personnel not required to complete NGET training, adequate information regarding the following: the method (s) of transportation to be utilized
m
i
!
. .
l by station evacuees to predesignated offsite relocation areas and a brief description of provisions at these relocation areas to perform evacuee monitoring, decontamination, and bioassay, as necessary. The inspector reviewed the May, 1985 revision of the " Byron Station N-GET Site Specific" handout which included " Byron Site Accountability Guidelines" that adequately detailed those actions to be taken by persons within the Owner Controller Area should assembly, accountability, or even site evacuation be ordered during an emergency situation. Evacuation instruc-tions were appropriately kept general in nature so that evacuees would utilize the mode of transportation and evacuation route told them during the emergency, rather than proceeding however they felt was best or most convenient. Assurances were also given that radiation chemistry personnel would be made available at one or more offsite relocation centers to survey evacuees for radioactive contamination and also to perform decontamination and bioassay collection tasks, as neede The inspector determined that the revised guidelines had been distributed in May, 1985 to those Commonwealth Edison personnel having unescorted access privileges to the Byron Station and who had, in fact, obtained unescorted access. Adequate provisions had been made-to ensure that any badged personnel who had not entered the Protected Area since May, 1985, as well as visitors who would be escorted onsite, would be given a copy of the guidelines upon their first entry into the Protected Are The inspector also determined that the guidelines would be provided to badged personnel during their annual N-GET requalification training. This item is considered close (Closed) Open Item Nos. 50-455/85010-02 and 50-455/85007-02: Develop, implement, and maintain an administrative system to ensure that all construction workers onsite, but not required to complete NGET training, receive adequate, annual instructions on their required emergency response actions. The inspector determined that the licensee had met with all onsite contractors' security administrators on April 30, 1985 to establish an administrative system to ensure that all construction workers had received the May 1985 revised site accountability guidelines, regardless of whether or not the personnel had been granted unescorted access privileges. Each company was tasked with maintaining an information distribution and recordkeeping system for its own employees, including any new hires. The inspector reviewed correspondence from the offices of the four largest employers of onsite construction personnel which indicated that this distribution had taken place prior to the June 1985 emergency preparedness exercise. The inspector also interviewed onsite project managers, from one large and two smaller contractor organizations, who described how they had handled the information distribution and record-keeping task. The inspector spot-checked employee files at each of-the three contractors' offices and verified that adequate documentation existed to show that those employees whose records had been spot-checked had acknowledged receipt of the May 1985 guidelines. The licensee has established a mechanism to remind the GSEP Coordinator to arrange for annual redistribution of the assembly, accountability, site evacuation guidelines. This item is considered close _ _
.
<
. .
3. General An exercise ~of the licensee's Generating Stations Emergency Plan (GSEP)
and the Byron Annex was conducted at the Byron Station on June 11-12, 1985, testing the integrated response of licensee, State, and local organizations to a hypothetical accident scenario resulting in a major release of radioactive material. The off-hours exercise was integrated with a test of the Illinois State and Ogle County emergency plans. This was a partial participation exercise for the State of Illinoi Attachment 1 describes the licensee's scope and objectives for the exercise. Attachment 2 describes the scenari . General Observations Procedures This exercise was conducted in accordance with 10 CFR Part 50, Appendix E requirements using the GSEP, Byron Annex, and the emergency plan implementing procedures used by the Station and Emergency Operations Facility (E0F). Coordination The licensee's response was coordinated, orderly, and timely. If the events had been real, actions taken by the licensee would have been sufficient to permit the State and local authorities to take appropriate actions to protect public health and safet Observers Licensee observers observed and critiqued this exercise along with seven NRC observers and several Federal Emergency Management Agency (FEMA) observers. FEMA observations on the response of the State and local governments will be provided in a separate repor Critique The licensee held a critique immediately following the exercise on June 12, 1985. The NRC critique was held at'the EOF later that da In addition, a public critique was held on June 13, 1985, to present both the onsite and offsite preliminary findings by the NRC and FEMA representatives, respectivel . Specific Observations Control Room Exercise participants demonstrated good teamwork and proper use of various emergency procedures throughout the exercise. The Shift Engineer (SE) demonstrated strong leadership by coordinating the efforts of his staff, being decisive, and by keeping his staff informed of changing events and decisions, including the decision
.
,,;
to transfer appropriate emergency responsibilities to the Technical-Support Center's '(TSC's) Station Director (SD). The SE also
-
maintained an adequately detailed Control Room lo The SE, as acting-SD, properly classified the Unusual Event and the Alert in a timely manner. Several minutes elapsed, however, before personnel concluded that separate reports of a tornado sighting and the loss of all remaining sources of. offsite power were relate The:SE classified an Alert after asking for and receiving confirma-tion that the tornado had struck the station. Between the Unusual Event and Alert declarations, the SE ordered several good'onsite-
-protective-actions, including a halt to new fuel handling and radwaste processing, activation of the Operational Support Center (OSC), and visual inspection of the emergency diesel generators operational for this exercis The correct decision to visually inspect the diesels caused some temporary confusion in the Control
~ Room when the operator dispatched for this task reported seeing signs posted by one diesel generator room that indicated there was a
~
fire in the roo Controllers in that area had failed to anticipate-this Control Room response to scenario events and had posted these signs over one hour before the simulated fire was to occur. Control Room controllers adjusted to'this early fire report by telling the SE that it was fals .The~SE kept the Corporate Nuclear Duty Officer and the on-call SD adequately informed of scenario events and onsite emergency response actions. During one of these calls, a decision was made to activate-the TSC shortly after the tornado sighting. Timely, initial notifications to State officials, NRC Headquarters, and the licensee's load dispatcher were accomplished despite actual problems with the dedicated Nuclear Accident Reporting System (NARS)'used to-communicate with the State and load dispatcher. Static on this dedicated line was sufficient to declare the NARS telephones inoperable in both the Control Room and TSC. Control Room communicators quickly adjusted.to this problem and utilized commercial telephones to contact the State and another dedicated line~to reach the load dispatche The NARS malfunction was promptly reported to NRC Headquarters and equipment checks were quickly initiate All notifications to the State and NRC Headquarters were adequately documente Both the station's fire and assembly alarms were sounded during the-exercise. .Both were very loud.in the Control Room and in the TSC and lasted several minutes. The loudness and duration of both alarms disrupted ongoing communications in both facilitie B'ased on the above findings, the following item'should be considered for improvement:
. Audibility of station fire and assembly alarms should not disrupt ongoing communications in onsite emergency response facilities.
!
. .
b. Technical Support Center (TSC)
The TSC achieved fully operational status with an adequate number of directors and support staff within one hour of the decision to activate this facilit The 50 assumed command and control only after several onsite telephone discussions with the SE on scenario events and ongoing response activities. TSC staff performed their duties in a timely and competent manner. The Station, Operations, and Rad / Chem Directors used the facility's public address system to frequently brief TSC personnel of relevant plant status and mainten-ance activities and activities at the Emergency Operations Facility (E0F), including offsite protective action recommendation A contingency message was issued to require that a NARS message be transmitted to report an onsite fire requiring offsite firefighting assistance. Participants expressed some concern for the need to transmit this message, as the emergency classification would be unchanged from that already in effect. This followup notification to State agencies and the load dispatcher was warranted in order to keep them adequately informed of new abnormal conditions onsite and the resulting increased emergency response activities, including the involvement of a local offsite support organization. The Site Area Emergency was promptly classified by the SD after he had confirmed with the SE that the loss of coolant rate exceeded the makeup ,
capabilities of available charging pumps. All initial offsite notifications were completed in a timely manner and adequately documente Actual assembly and accountability of all onsite personnel was promptly initiated after the Site Area Emergency declaration. All onsite personnel were accounted for within the thirty minute time goa Accountability of TSC personnel was accomplished with minimal disruption of their activitie The Station, Security, and Rad / Chem Directors chose the correct mode of transportation and route to be used by nonessential personnel whose evacuation from the Station was simulated after the accountability proces County officials were informed before the simulated evacuatio With two exceptions, TSC staff did a very good job in trending key plant parameters and monitoring the progress of onsite repair activitie Trending was accomplished either on a status board or on a computerized display, both of which were readily visible to technical personnel. However, status board updating was slow for the first forty-five minutes of TSC operation. At one point, a plotter refused to accept updated meteorological data from a director who recognized that current wind speeds had decreased by almost one order of magnitude from that plotted. The plotter incorrectly waited until an update was available from another director who normally provided him with new information. Later in the exercise, several personnel were slow to recognize and call attention to the rapidly increasing hydrogen gas concentration inside containment. The rate of increase was artificially high for
. .
,
purposes of the scenario to preclude use of the hydrogen recombiner In any event, the concentration increased about seven percent. in thirty minutes before a director finally called everyone's attention to this critical paramete TSC. staff generated offsite dose projections and monitored communications with offsite teams even after responsibilities for such actions had been transferred to the E0F. This continued involvement allowed the SD to receive prompt confirmation of the unmonitored release and also to meaningfully discuss proposed offsite protective action recommendations with the Recovery Manager (RM). However, several persons exhibited difficulty when trying to read the reduced-scale protective action flowchart reproduced in
~
procedure BZP 300-A Individual directors maintained adequately detailed records of their actions. Internal message flow was good. Early arrangements were made by the Administrative Director for the relief of onsite emergency worker Similar arrangements were later made for E0F clerical staf Contamination control was adequately maintained by a radiation chemistry technician (RCT) at the TSC's entranc Periodic habitability monitoring was adequate in the TS Based on the above findings, the following items should be considered for improvement:
. Followup notifications to State authorities should be ma'e d in accordance with the criteria in Section 6 of the GSE !
. -Individuals who first become aware of significant events or other changes in plant conditions should promptly share the information with affected personne . Decisionmakers in the TSC should utilize a legible copy of the offsite protective action flow chart, as found in the GSE c. Operational Support Center (OSC) and-Fire Drill Activation and staffing of the facility was orderly and timely. The OSC Director assumed control of the facility after being briefed in the Control Room by the S Assembled technicians were periodically briefed on plant status, emergency classifications, and inplant activitie Records were maintained of radiation exposures supposedly received by individuals assigned to various inplant teams. The OSC supervisor properly coordinated with the TSC to obtain prior authorization of emergency worker exposures in excess of the licensee's quarterly limit, which is less than the regulatory limi Personnel accountability was established and maintained. An adequately detailed OSC log was kept. Although collection of an air sample was simulated and periodic radiation surveys were conducted in the OSC, no frisker station was established at an OSC entrance to better ensure that radioactive contamination was not brought into the facility by personnel returning from inplant assignment . .
Collection of a post-accident reactor coolant sample was accomplished within the time goal with little difficult Sampling team members donned only those articles of protective clothing procedurally required for routine sampling tasks. Following sample collection, another technician dispatched from the OSC to the Hot Lab to assist in sample analysis. tasks neglected to take a radiation survey instrument. On another occasion, one RCT and two maintenance tech-nicians were in the plant on a maintenance assignment for about forty-five minutes. The team simulated donning protective clothing and respiratory protection. Although each person was equipped with a dosimeter, no one was observed to check their dosimeter while in the plan The plant fire brigade,. led by the OSC Director, responded from the OSC to a simulated fire in an emergency diesel generator roo Prior to his dep&rture, the OSC Director assigned an assistant to manage the facility during his absence. The local offs _ite fire department actually responded to the fire as part of this exercis The station's security force was alerted when these firefighters were enrout There were no unnecessary delays in getting the firefighters and their vehicles onsit Security personnel ensured that these personnel were given badges and dosimetry, and directed them to a plant entrance close to the fire scen Based on the above findings, the following items should be considered for improvement:
. Additional contamination control measures should be implemented at the entrance (s) to the OS . Personnel dispatched from the OSC should be equipped with adequate survey instruments and should periodically check-their self-reading dosimetry, per station procedure d. Emergency Operations Facility (EOF)
Transfer of overall command and control of the licensee's emergency response from the TSC's Station Director (50) to the EOF's Recovery Manager (RM) was smooth and timel The RM effectively managed emergency response activitie He kept well aware of the progress of EOF staff activities; solicited their advice as necessary; and kept them informed of scenario events and decisions. He remained in frequent contact with the SD regarding the status of inplant conditions, onsite corrective and protective actions, and proposed offsite protective action recommendations. EOF staff did an adequate job of trending critical plant parameters and documenting their activities and decision The RM declared the General Emergency promptly after confirming with the SD that a radioactive release had begun following the hydrogen gas explosion in the containment building. The appropriate initial protective action recommendation was given to State and County officials along with the General Emergency declaration. The
l L
. .
-
recommendation was correctly revised, in a timely manner, after additional plant status information became available in the EO The RM took time to discuss these recommendations with State agencies' representatives present in the E0F. Environmental staff were observed to be communicating dose projection, meteorological,
'
and offsite survey data to State agency personnel in Springfield, Illinoi Minutes before the scenario's 24-hour time advance, but after the release'had been terminated, the RM made a hasty decision to reclassify the situation as a Site Area Emergency. State representatives in the E0F were aware of his decisionmaking prior to transmittal of the.NARS message. Although a reclassification was made, there were no' associated changes to offsite protective action recommendations, onsite corrective actions, or offsite survey activitie Since nothing was to be accomplished by essentially only making a title change to the emergency situation, the reclassification would have been appropriate following completion of additional equipment restoration tasks onsite as well as offsite survey Following the scenario time advance, the EOF staff participated in discussion to identify and prioritize short-term damage assessment, repair tasks and to identify long-term recovery concern Radiological Environmental Monitoring Teams Two teams'were assembled and sent from the OS Teams had completed checking their equipment, obtained their vehicles, and were ready for dispatch prior to the radioactive release. Due to communications equipment problems in the TSC, a correct decision was made by TSC and EOF environs staffs to transfer control of the teams to the latter several minutes before the E0F was declared fully operational. EOF staff kept the teams appraised of the plant and release status and emergency classification changes during the exercis .
An inspector accompanied one of the monitoring teams once they had left the statio Although E0F personnel controlling the team habitually repeated messages received from the team to ensure proper understanding, the team neglected to repeat back messages received from the EOF. Problems.were noted with the GSEP van's radio communications equipment. Volume and squelch control were erratic and breakup was noted during some transmission receptions. A backup handi-talkie radio was available in the van but was not used in spite of the problems experienced with the principal radio equipmen Direction of the monitoring teams by EOF environs staff was goo Teams were positioned down wind of the station before the radio-
~ active release began. Proper concern for team exposure control was repeatedly expressed by adv. sing the teams.to withdraw from the vicinity of the plume once samples and measurements had been take Team members properly bagged and labeled soil, vegetation, and air sample filter cartridges for later analyse However, contamination
. .
control practices by team members were inadequate, as evidenced by the following observations: gloves were not always worn while collecting soil and vegetation samples; gloves were not always changed prior to taking new samples; gloves were not worn by all team members who handled air sample cartridges and filter elements prior to the survey of the:: items; monitoring instruments were typically set on the ground without being bagged prior to making a survey of the ground; and gloves were not always removed prior ~to technicians driving or riding in the van to the next sampling locatio Team members also exhibited uncer'ainty c when performing operability checks on the SAM II instrument provided with their other equipmen They did not reference appropriate procedures that were available in the van. The team also appeared unfamiliar with guidance contained in procedure EG-3 regarding use of a Cutie Pie survey instrument to take measurements at 6 foot and 6 inch distances from a potential radiation source. The procedure also required that readings be taken for a 30'second duration. Readings were typically taken for only 1 to'5 second The offsite monitoring team's inadequate contamination control practices, uncertainty in operating the SAM II, and failure to follow procedure EG-3 together constitute an exercise weakness (50-454/85015-01 and 50-455/85010-01).
In addition to the exercise weakness, the following items should be considered for improvement:
. Persons involved in communications with offsite monitoring teams should ensure that messages have been received and properly understoo . The GSEP van's radio equipment should be promptly checked and repaire f. Joint Public Information Center (JPIC)
Accommodations in the Joint Public Information Center (JPIC) were spartan, but adequate. Licensee spokespersons responded to questions from the media and evaluators from the NRC and FEMA in a timely manner without using excessive technical jargon. An adequate number of press releases (11) were issued during the exercise. The RM's designee, the Advisory Support Director, reviewed all press releases prior to issuance. Though numerous and technically accurate, press releases were too concise, being two to six sentences in lengt They did not include explanations or definitions of mentioned emergency classes and plant component . .
Based on the above findings, the following item should be considered for improvement:
. Press releases should include explanations of technical
. terminology to improve their understanding by the medi . Exit Interview The inspectors held an exit interview on June 12, 1985 with those individuals identified in Paragraph 1. The inspectors discussed the scope and preliminary findings of the inspection. The licensee agreed to consider the items discussed. The inspectors determined from the licensee that none of the information discussed was proprietary in natur Attachments: Exercise Scope and Objectives Scenario Narrative Summary
,
._
_ ._
,
. .
,
Byron station Exercise 1985
" SCOPE OF PARTICIPATION" r e alth Edison will participate in the Byron Station exercise by activating the on-site emergency response organization and the near-site EOF as appropriate, subject to limitations that may become necessary to provide for safe efficient operation of Byron Station and other Ceco nuclear generating station Activation of the TSC.and other on-site participants will be conducted on a real time basis during the evening time hours. An exercise shift will receive the initial scenario information and respond accordingl The Nuclear Duty Person and the balance of the Recovery Group will be prepositioned close to Byron to permit use of Recovery Group personnel from distant location i Commonwealth Edison will demonstrate the capability to make contact with contractors whose assistance would be required by the simulated accident situation, but will not actually incur the expense of using contractor services to simulate emergency response except as prearranged specifically for the exercis On-site assembly and accountability will be conducted during this exercise. A fire drill will also be conducted at this time with off-site assistance being utilize Commonwealth Edison will arrange'to provide actual transportation and communication support in accordance with existing agreements to the extent specifically prearranged for the exercis (
..
.
Byron Station Exercise 1985 O OBJECTIVES Primary Obiective:
Demonstrate the capability to implement the Commonwealth Edison Generating Stations Emergency Plan in cooperation with the Illinois Plan for Radiological Accidents to protect the public in the event of a major accident at the Byron Station. Demonstrate this capability during the hours to qualify as a evening time exercise in accordance with NRC guidanc Supporting Obieciivest 1) Incident Assessment and classification
'
a. Demonstrate the capability to assess the accident conditions, to determine which Emergency Action Level (EAL) has been reached, and to classify the accident level correctly in accordance with GSE (EOF, TSC, CR)
2) Notification and Communication Demonstrate the capability to notify the principal offsite organizations within 15 minutes of declaring an accident (% classificatio * - (EOF, TSC, CR)
s Demonstrate the capability to notify the NRC within one 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> of the initial incident.
i~
- (EOF, TSC, CA)
!
Demonstrate the capability to contact organi7a+ tens that would normally assist in an emergency, b- are nc participating in this exercise (e.g. INIO, Murray b Trettel, Westinghouse, etc.)
- (CR, EOF, TSC) Demonstrate the ability to provide accurate and timely information so that reports may be made to the emergency news center for press release (EOF)
3) Radiological Assessment Demonstrate the capability to calculate off-site dose projection **'
!
i
- (EOF, TSC) Demonstrate the capability of environmental field teams to O conduct field radiation surveys and collect air, liquid, vegetation and soil samples when neede (EOF, TSC, ENV)
'
6264E/1 l
_. -
. .
~ ~
. Demonstrate the capability to conduct in-plant radiation protection activitie (HP) Demonstrate the capability to collect and simulate analysis of air or liquid samples on-sit (HP, CHEM) Demonstrate the ability to perform calculations with radiological survey information, trend.this informetion, and make appropriate reconmendations concerning protective action (EOF, TSC, HP)
4) Emergency Facilities Demonstrate the capability to activate the emergency organization and staff the nuclear station emergency
,
response facilities in accordance with procedures during a J
evening time perio (EOF, TSC, HP, CHEM) Demonstrate through discussion and staff planning, the O ,
ability to perform a shift change in the TSC, EOF and control roo (EOF, TSC, CR)
5) Emergency Direction _and Control I Demonstrate the ability of the directors to manage the emergency organizations in the implementation of the GSE (EOF, OSC, TSC, CR) Demonstrate the capability of coordinating the direction of emergency response among CECO and Illinois offsite command centers by using Liasion personnel and communicators.
,
- (EOF)
!
6) Becovery and Re-entry Demonstrate the capability of the emergency response personnel to identify requirements, programs, and policies governing damage assessments and implementing procedures for recovery and re-entr *
- (EOF, TSC) ,
() - (croups that are primarily concerned)
6264E/2
__ _- .. - - - _ _ _ _ - - _ _ _ _ - . _ - _ , _ . - _ _ .
__ _ _ ._ _ _ _ . .
. .
a
O Byron Nuclear Power Station June 11, 1985 Exercise
!
Warrative Summary
INITIAL SITUATION 1900 - 1915 (Duration of 15 minutes)
i O Plant Status Unit one is operating at. full power with a normal at power electrical lineup. Surveillance testing of the Reactor Protection System is in' progress.
l
- Unit Two is under construction. Construction of the 2A Diesel Generator is complete to provide reserve feed to Unit One as required by the facility Operating License. Valve lineups are in progress to support the cold hydrostatic test of the Reactor Coolant
'
System. A partial shipment of Unit Two fuel assemblies is undergoing receipt inspection in the Fuel Handling Buildin O Service Report the Unit one positive displacement charging pump is out-of-service for repair of the hydraulic coupling. The carbon dioxide (co2) to
O' -
the 1A Diesel Generator Room is out-of-service and cannot be actuated electrically or manuall The Unit Two 2A Diesel Generator is out-of-service for a cylinder liner replacement. Approximately eight hours of repair work' remains
<
to be completed before returning the generator to operable statu O Precursor Event At 1900 hours0.022 days <br />0.528 hours <br />0.00314 weeks <br />7.2295e-4 months <br />, 345KV trasmission Line 0624 trips in the switchyard because of the severe weather at it's point of termination, the Wempletown Transmission Station. This reduces to three the number of transmission lines to the station switchyard. Two lines are required for operatio UNUSUAL EVENT 1915 - 1945 (Duration of 30 minutes)
)
EAL 8 - Sustained winds in excess of 60 mph.
j At 1915 hours0.0222 days <br />0.532 hours <br />0.00317 weeks <br />7.286575e-4 months <br />, Lustained wind speeds at the site have increased to j greater than 60 miles per hour. Unit one continues , full power
operation but implements precautionary measures for the conditio ;
Subsequently, surveillance testing of the Reactor Protection System
,
() and the receipt inspection of Unit Two new fuel assemblies are terminate E/33 f
._.w. ._ , _ . , . .,_.__. . _ _ _ _ , _ _ . , _ , _ , . . _ - _ _ . _ , _ _ , . , , _ , _ . , _ _ . _ _ , , _ _ _ _ _ _ _ _ _ , _ , _ . - . _ _ _ _ _ _ _ , _ , . - , _ _ . , . . _ , _ . , . , _ , . _ , . . _ , _ , , , . _ , , _ , _ _ . _ . _ , . - _ , , . . ,
_ _
_ _ . _ _ , - - . _ , _ . _
- .
A1.ERT 1945 - 2100 (Duration of I hour and 15 minutes)
EAL 8 - Tornado strikes facility and sustained winds of greater than 75 mp EAL 5 - Fire requiring offsite assistance and has degraded equipment described in Technical Specification At 1945 hours0.0225 days <br />0.54 hours <br />0.00322 weeks <br />7.400725e-4 months <br />, a tornado strikes the southern perimeter of the switchyard destroying the three remaining 345 kilovolt transmission lines connecting the station with the commonwealth Edison electric grid. Unit one reactor trips on undervoltage
to the reactor coolant pumps. A turbine tri and main generator trip follow. The plant automatically responds with a
' start of the two Unit one Diesel Generators and a sequence loading of the plant Safe Shutdown Equipment. Operators verify the automatic starting of the shutdown equipment and take action to promote natural circulation cooling of the reactor Cor At 2000 hours0.0231 days <br />0.556 hours <br />0.00331 weeks <br />7.61e-4 months <br />, stable plant conditions have been establishe Unit one reactor core decay heat is being dissipated to atmosphere through the four Steam Generator Pressure Operated Relief Valves. The natural circulation cooling proceeds nominall At 2020 hours0.0234 days <br />0.561 hours <br />0.00334 weeks <br />7.6861e-4 months <br />, the 1A diesel generator turbo-charger fails which deenergizes vital Bus 141 and one-half of the safe shutdown equipment. Missiles, from the failure, penetrate the diesel's local control panel and crank case, setting fire to the engine lube oil. offsite assistance is required to deal with the 1A Diesel Generator Room fire. Upon arrival, the Byron Fire Department quickly gains control of the fir SITE EMERGENCY 2100 - 2300 (Duration of 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />)
EAL 16 - Loss of Reactor Coolant greater than charging capabilit At 2100 hours0.0243 days <br />0.583 hours <br />0.00347 weeks <br />7.9905e-4 months <br />, with stable shutdown cooling of the reactor, the control Room observes indications of a major loss-of-coolant
accident. Train "B" emergency core cooling systems automatically start on the running Diesel Generato core 450,000 gallon cooling is established by pumping water from the Reactor Water Storage Tank to the Reactor Pressure Vesse Conditions proceed nominall At 2145 hours0.0248 days <br />0.596 hours <br />0.00355 weeks <br />8.161725e-4 months <br />, the Containment Sump is full and the RWST low-low level alarm is received. The operators, manually switchover from the injection phase to the recirc'ulation phase of core cooling. Only Train "B" valves are energized and are available for the transitio E/34 I- _._.__.___ _, _
-
..
GENERAL EMERGENCY 2300 - 0101 (Duration of 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> and 1 minute)
EAL 16 - Loss of Coolant Accident (LOCA) with no injection possibl At 2300 hours0.0266 days <br />0.639 hours <br />0.0038 weeks <br />8.7515e-4 months <br />, the Train "B" Residual Heat Removal pump trips on electrical fault. This results in the total loss of Emergency Core Cooling. Without any source of water makeup to the reactor pressure vessel core, decay heat increases the temperature of the remaining fluid inventory venting steam to the containment atmosphere. The upper core rapidly uncovers the top most fuel rod gas p.enums. Contsinment hydrogen concentration and pressure increas At 2350 hours0.0272 days <br />0.653 hours <br />0.00389 weeks <br />8.94175e-4 months <br />, a containment hydrogen explosion occurs, status monitor lights indicate the 48" diameter containment purge supply valves are not fully seate At 0000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br />, field monitoring teams detect an unmonitored release by the facility. Simultaneously, maintenance returns the 2A Diesel Generator to operable status. The operators manually initiate emergency core cooling and reflood the damaged cor At 0025 hours2.893519e-4 days <br />0.00694 hours <br />4.133598e-5 weeks <br />9.5125e-6 months <br />, the purge supply dampers are manually forced O, ,
closed. This isolated the release pat At 0101 hours0.00117 days <br />0.0281 hours <br />1.669974e-4 weeks <br />3.84305e-5 months <br />, a 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> time jump occur RECOVERY / REENTRY 0101 l