U. S. NUCLEAR REGULATORY COMMISSION
REGION III
.
Reports No. 50-454/88010(DRSS);50-455/88010(DRSS)
Docket Nos. 50-454; 50-455 Licenses No NPF-37; NPF-66
,
Licensee: Commonwealth Edison Company Post Office Box 767 Chicago,'IL 60690 Facility Name:
Byron Nuclear Power Station, Units 1 and 2 Inspection Conducted: June 23, 1988 at NRC Region III Office June 27-July 1~,1988 Onsite Date of Previous Physical Security Inspection: January 28-February 12, 1988 Type of Inspection: Unannounced Physical Security Inspection Inspector:
kk-
Si G. L. Pirtle J Date Physical Security Inspector Approved By:
C\\ crum fbtWt [cq
James R. Creed, Chief U Date Safeguard, Section Inspection Summary Inspection between June 23 and July 1,1988 (Reports No. 50-454/88010(DRSS);
No. 50-455/88010(DRSS))
Areas Inspected:
Included a review of Management Effectiveness - Security; Security Program Audits; Testing and Maintenance; Vital Area - Barriers and Alarms; Compensatory Measures; Access Control - Personnel, Packages, and Vehicles; Communications; and Followup on Previous Inspection Findings. The effectiveness of the transition process for the change in the contractor security force was also reviewed.
Results:
The licensee was found to be in compliance with NRL requirements
-
within th= areas examined, except as noted below:
Access Control Vehicles: The designated vehicle program was not adequately monitored (Section 6 of the Report Details).
'
PDR ADOCK 05000454 "
Enclosure containS 8807260107 880714 SAFEGUNIDS INFORMATION O
PNU Upon separation this p:ge is Decontrolled m
- -
- -
- -
- -
. -
-
-
- - -
.. ---
---: ---- --
-
,
....
.s
.
One previous inspection finding was closed.
Licensee's actions in resolving five other open items were reviewed and found to be adequate.
The transition for the change in security force contractors was reviewed and determined to be effective.
(Details - UNCLASSIFIED SAFEGUARDS INFORMATICN)