Safety Insp Repts 50-454/85-37 & 50-455/85-41 on 850820-21 & 1104-1218.No Violation or Deviation Noted.Major Areas Inspected:Organization & Mgt Controls,Exposure Controls & Control of Radioactive MatlsML20136J363 |
Person / Time |
---|
Site: |
Byron |
---|
Issue date: |
01/07/1986 |
---|
From: |
France G, Grant W, Greger L, Nicholson N NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
---|
To: |
|
---|
Shared Package |
---|
ML20136J359 |
List: |
---|
References |
---|
50-454-85-37, 50-455-85-41, IEIN-85-042, IEIN-85-043, IEIN-85-42, IEIN-85-43, NUDOCS 8601130345 |
Download: ML20136J363 (13) |
|
Similar Documents at Byron |
---|
Category:INSPECTION REPORT
MONTHYEARIR 05000454/19990121999-10-0808 October 1999 Insp Repts 50-454/99-12 & 50-455/99-12 on 990803-0916.One NCV Occurred.Major Areas Inspected:Operations,Engineering, Maint/Surveillance & Plant Support IR 05000454/19990161999-10-0101 October 1999 Insp Repts 50-454/99-16 & 50-455/99-16 on 990907-10.No Violations Noted.Major Areas Inspected:Radiation Protection & Chemistry Program Included Water Chemistry Control Program & Chemistry Instrument Quality Control Program IR 05000454/19990151999-09-30030 September 1999 Revised Pages Eight Through Eleven to Insp Repts 50-454/99-15 & 50-455/99-15,correcting Inaccuracies with Docket Numbers & Tracking Numbers IR 05000454/19990141999-09-17017 September 1999 Insp Repts 50-454/99-14 & 50-455/99-14 on 990823-27.No Violations Noted.Major Areas Inspected:Physical Security Program ML20211P2001999-09-0808 September 1999 Insp Repts 50-454/99-15 & 50-455/99-15 on 990824-26.No Violations Noted.Major Areas Inspected:Evaluation of Licensee Performance During Exercise of EP IR 05000454/19990101999-08-25025 August 1999 Insp Repts 50-454/99-10 & 50-455/99-10 on 990622-0802.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000254/19990101999-08-20020 August 1999 Insp Repts 50-254/99-10,50-265/99-10,50-454/99-09, 50-455/99-09,50-456/99-10 & 50-457/99-10 on 990628-0721. Major Areas Inspected:Licensee C/A Approach & Implementation of Configuration Control Processes at Each Site IR 05000454/19990081999-07-16016 July 1999 Insp Repts 50-454/99-08 & 50-455/99-08 on 990511-0621.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000454/19990041999-06-0404 June 1999 Insp Repts 50-454/99-04 & 50-455/99-04 on 990330-0510.No Violations Noted.Major Areas Inspected:Operations,Maint & Surveillance & Plant Support IR 05000454/19990071999-05-28028 May 1999 Insp Repts 50-454/99-07 & 50-455/99-07 on 990517-20.No Violations Noted.Major Areas Inspected:Fire Protection Program,Aspect of Plant Support IR 05000454/19990051999-05-20020 May 1999 Insp Rept 50-454/99-05 on 990401-22.No Violations Noted. Major Areas Inspected:Adequacy of Licensee Programs, Procedures,Equipment & Supporting Documentation for ISI Program IR 05000454/19990061999-05-19019 May 1999 Insp Repts 50-454/99-06 & 50-455/99-06 on 990419-23.No Violations Noted.Major Areas Inspected:Liquid & Gaseous Effluent Program,Radiological Environ Monitoring Program, Auditing Program & Outage Activities IR 05000454/19990031999-04-14014 April 1999 Insp Repts 50-454/99-03 & 50-455/99-03 on 990217-0329. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000454/19990021999-03-10010 March 1999 Insp Repts 50-454/99-02 & 50-455/99-02 on 990105-0216.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000454/19990011999-02-11011 February 1999 Insp Repts 50-454/99-01 & 50-455/99-01 on 990119-22.No Violations Noted.Major Areas Inspected:Adequacy of Licensee Programs,Procedures,Equipment & Supporting Documentation for Maint of Medium Voltage & Low Voltage Circuit Breakers IR 05000454/19980251999-01-19019 January 1999 Insp Repts 50-454/98-25 & 50-455/98-25 on 981124-990104.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000454/19980241998-12-30030 December 1998 Insp Repts 50-454/98-24 & 50-455/98-24 on 981130-1204.No Violations Noted.Major Areas Inspected:Ro & SRO Requalification Programs,Review of Training Administrative Procedures & Written & Operating Exam Matl IR 05000454/19980201998-12-18018 December 1998 Insp Repts 50-454/98-20 & 50-455/98-20 on 981006-1123.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000454/19980231998-12-17017 December 1998 Insp Repts 50-454/98-23 & 50-455/98-23 on 981116-17.No Violations Noted.Major Areas Inspected:Verification of Adequacy of Training to Plant Operators in Dealing with Fluctuations in Electric Grid Stability IR 05000454/19980221998-12-10010 December 1998 Partially Withheld Insp Repts 50-454/98-22 & 50-455/98-22 on 981116-20 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Selected Aspects of Physical Security Program & Testing of Licensee Access Control Equipment IR 05000454/19980211998-11-0505 November 1998 Insp Repts 50-454/98-21 & 50-455/98-21 on 981013-16.No Violations Noted.Major Areas Inspected:Alara Planning & Radiation Work Permit Programs & Whole Body Counting & Screening Programs IR 05000454/19980191998-10-29029 October 1998 Insp Repts 50-454/98-19 & 50-455/98-19 on 980825-1005.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000454/19980171998-09-18018 September 1998 Insp Repts 50-454/98-17 & 50-455/98-17 on 980714-0824.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint & Engineering IR 05000454/19980161998-07-31031 July 1998 Insp Repts 50-454/98-16 & 50-455/98-16 on 980713-17.No Violations Noted.Major Areas Inspected:Security Equipment Maint,Procedure & Records Review,Personnel Performance, Self Assessment & Previously Identified Issues IR 05000454/19980141998-07-31031 July 1998 Insp Repts 50-454/98-14 & 50-455/98-14 on 980531-0713. Violations Noted.Major Areas Inspected:Operations, Maint/Surveillance,Engineering & Plant Support IR 05000454/19980151998-07-22022 July 1998 Insp Repts 50-454/98-15 & 50-455/98-15 on 980706-09.No Violations Noted.Major Areas inspected:follow-up of April 1997 Maintenance Rule Baseline Insp That Reviewed Licensee Implementation of 10CFR50.65 ML20236H0321998-06-29029 June 1998 Insp Repts 50-454/98-11 & 50-455/98-11 on 980407-0530. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000454/19980101998-05-28028 May 1998 Insp Repts 50-454/98-10 & 50-455/98-10 on 980403-27 & 0506. Violations Noted.Major Areas Inspected:Review of Radiation Protection Program IR 05000454/19980131998-05-26026 May 1998 Insp Repts 50-454/98-13 & 50-455/98-13 on 980415-0508. Violations Noted.Major Areas Inspected:Plant Support ML20217R0141998-05-0505 May 1998 Insp Repts 50-454/98-09 & 50-455/98-09 on 980223-0406. Violations Noted.Major Areas Inspected:Operation, Maint Surveillance & Plant Support ML20217E8671998-03-27027 March 1998 Insp Repts 50-454/98-04 & 50-455/98-04 on 980120-0210. Violations Noted.Major Areas Inspected:Engineering,Technical Support & Self Assessment Activities ML20217E5501998-03-26026 March 1998 Insp Rept 50-454/97-21 on 970919-980228.Violations Noted. Major Areas Inspected:Observations of Operations Training, Preparation for SG Replacement,Maint/Construction Activities & Review of Engineering & Quality Assurance IR 05000454/19980081998-03-20020 March 1998 Insp Repts 50-454/98-08 & 50-455/98-08 on 980302-06. Violations Noted.Major Areas Inspected:Transportation & Solid Radioactive Waste Programs IR 05000454/19980051998-03-16016 March 1998 Insp Repts 50-454/98-05 & 50-455/98-05 on 980113-0223. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000454/19980071998-03-13013 March 1998 Insp Repts 50-454/98-07 & 50-455/98-07 on 980217-25.No Violations Noted.Major Areas Inspected:Various Aspects of Physical Security Program IR 05000454/19980061998-02-17017 February 1998 Insp Repts 50-454/98-06 & 50-455/98-06 on 980120-23 & 26. Noncited Violation Identified.Major Areas Inspected:Review of Radiation Protection Program IR 05000454/19980031998-02-11011 February 1998 Insp Repts 50-454/98-03 & 50-455/98-03 on 980108-27.No Violations Noted.Major Areas Inspected:Review of Security Measures Implemented to Support SG Replacement Project ML20202B9931998-02-0303 February 1998 Insp Repts 50-454/97-24 & 50-455/97-24 on 971202-980112. Violations Noted.Major Areas Inspected:Operations Maint/Surveillance Engineering & Plant Support IR 05000454/19980021998-01-21021 January 1998 Insp Repts 50-454/98-02 & 50-455/98-02 on 980105-09.No Violations Noted.Major Areas Inspected:Review of Emergency Preparedness Program & Aspect of Plant Support IR 05000454/19970231998-01-14014 January 1998 Insp Repts 50-454/97-23 & 50-455/97-23 on 971117-1218. Violations Noted.Major Areas Inspected:Radiological Protection & Chemistry (Rp&C) Controls & Staff Knowledge & Performance in Rp&C ML20199J9091997-12-24024 December 1997 Insp Repts 50-454/97-22 & 50-455/97-22 on 971017-1201. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000454/19970201997-12-0404 December 1997 Insp Repts 50-454/97-20 & 50-455/97-20 on 970909-1016. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support & Security Event That Occurred on 970815 IR 05000454/19970131997-10-30030 October 1997 Insp Rept 50-454/97-13 on 970811-0918.Violations Noted.Major Areas Inspected:Engineering & Plant Efforts for Upcoming Unit 1 SG Replacement Project IR 05000454/19970151997-10-20020 October 1997 Insp Repts 50-454/97-15 & 50-455/97-15 on 970725-0908. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000454/19970191997-10-0202 October 1997 Insp Repts 50-454/97-19 & 50-455/97-19 on 970908-18. Violations Noted & Being Considered for Escalated Enforcement Action.Major Areas Inspected:Several post-fire Safe Shutdown Issues IR 05000454/19970171997-10-0101 October 1997 Insp Repts 50-454/97-17 & 50-455/97-17 on 970825-0912. Violations Noted.Major Areas Inspected:Review of Radiation Protection Program & Planning for SG Replacement Project IR 05000454/19970161997-09-30030 September 1997 Insp Repts 50-454/97-16 & 50-455/97-16 on 970612-0918. Violations Noted.Major Areas Inspected:Review of NRC follow-up Items,Problem Identification Forms,Qa C/A Repts & Emphasis on EOPs & EOP Operator Response Times IR 05000454/19970121997-08-22022 August 1997 Insp Repts 50-454/97-12 & 50-455/97-12 on 970613-0724.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000454/19970141997-08-0101 August 1997 Insp Repts 50-454/97-14 & 50-455/97-14 on 970714-18.No Violations Noted.Major Areas Inspected:Review of Effluent Radiation Monitoring Sys,Cr & Auxiliary Bldg Filtered HVAC & REMP IR 05000454/19970111997-08-0101 August 1997 Insp Repts 50-454/97-11 & 50-455/97-11 on 970630-0707. Violations Noted.Major Areas Inspected:Insp Included Review of Physical Security Program 1999-09-08
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000454/19990121999-10-0808 October 1999 Insp Repts 50-454/99-12 & 50-455/99-12 on 990803-0916.One NCV Occurred.Major Areas Inspected:Operations,Engineering, Maint/Surveillance & Plant Support IR 05000454/19990161999-10-0101 October 1999 Insp Repts 50-454/99-16 & 50-455/99-16 on 990907-10.No Violations Noted.Major Areas Inspected:Radiation Protection & Chemistry Program Included Water Chemistry Control Program & Chemistry Instrument Quality Control Program IR 05000454/19990151999-09-30030 September 1999 Revised Pages Eight Through Eleven to Insp Repts 50-454/99-15 & 50-455/99-15,correcting Inaccuracies with Docket Numbers & Tracking Numbers IR 05000454/19990141999-09-17017 September 1999 Insp Repts 50-454/99-14 & 50-455/99-14 on 990823-27.No Violations Noted.Major Areas Inspected:Physical Security Program ML20211P2001999-09-0808 September 1999 Insp Repts 50-454/99-15 & 50-455/99-15 on 990824-26.No Violations Noted.Major Areas Inspected:Evaluation of Licensee Performance During Exercise of EP IR 05000454/19990101999-08-25025 August 1999 Insp Repts 50-454/99-10 & 50-455/99-10 on 990622-0802.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000254/19990101999-08-20020 August 1999 Insp Repts 50-254/99-10,50-265/99-10,50-454/99-09, 50-455/99-09,50-456/99-10 & 50-457/99-10 on 990628-0721. Major Areas Inspected:Licensee C/A Approach & Implementation of Configuration Control Processes at Each Site IR 05000454/19990081999-07-16016 July 1999 Insp Repts 50-454/99-08 & 50-455/99-08 on 990511-0621.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000454/19990041999-06-0404 June 1999 Insp Repts 50-454/99-04 & 50-455/99-04 on 990330-0510.No Violations Noted.Major Areas Inspected:Operations,Maint & Surveillance & Plant Support IR 05000454/19990071999-05-28028 May 1999 Insp Repts 50-454/99-07 & 50-455/99-07 on 990517-20.No Violations Noted.Major Areas Inspected:Fire Protection Program,Aspect of Plant Support IR 05000454/19990051999-05-20020 May 1999 Insp Rept 50-454/99-05 on 990401-22.No Violations Noted. Major Areas Inspected:Adequacy of Licensee Programs, Procedures,Equipment & Supporting Documentation for ISI Program IR 05000454/19990061999-05-19019 May 1999 Insp Repts 50-454/99-06 & 50-455/99-06 on 990419-23.No Violations Noted.Major Areas Inspected:Liquid & Gaseous Effluent Program,Radiological Environ Monitoring Program, Auditing Program & Outage Activities IR 05000454/19990031999-04-14014 April 1999 Insp Repts 50-454/99-03 & 50-455/99-03 on 990217-0329. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000454/19990021999-03-10010 March 1999 Insp Repts 50-454/99-02 & 50-455/99-02 on 990105-0216.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000454/19990011999-02-11011 February 1999 Insp Repts 50-454/99-01 & 50-455/99-01 on 990119-22.No Violations Noted.Major Areas Inspected:Adequacy of Licensee Programs,Procedures,Equipment & Supporting Documentation for Maint of Medium Voltage & Low Voltage Circuit Breakers IR 05000454/19980251999-01-19019 January 1999 Insp Repts 50-454/98-25 & 50-455/98-25 on 981124-990104.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000454/19980241998-12-30030 December 1998 Insp Repts 50-454/98-24 & 50-455/98-24 on 981130-1204.No Violations Noted.Major Areas Inspected:Ro & SRO Requalification Programs,Review of Training Administrative Procedures & Written & Operating Exam Matl IR 05000454/19980201998-12-18018 December 1998 Insp Repts 50-454/98-20 & 50-455/98-20 on 981006-1123.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000454/19980231998-12-17017 December 1998 Insp Repts 50-454/98-23 & 50-455/98-23 on 981116-17.No Violations Noted.Major Areas Inspected:Verification of Adequacy of Training to Plant Operators in Dealing with Fluctuations in Electric Grid Stability IR 05000454/19980221998-12-10010 December 1998 Partially Withheld Insp Repts 50-454/98-22 & 50-455/98-22 on 981116-20 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Selected Aspects of Physical Security Program & Testing of Licensee Access Control Equipment IR 05000454/19980211998-11-0505 November 1998 Insp Repts 50-454/98-21 & 50-455/98-21 on 981013-16.No Violations Noted.Major Areas Inspected:Alara Planning & Radiation Work Permit Programs & Whole Body Counting & Screening Programs IR 05000454/19980191998-10-29029 October 1998 Insp Repts 50-454/98-19 & 50-455/98-19 on 980825-1005.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000454/19980171998-09-18018 September 1998 Insp Repts 50-454/98-17 & 50-455/98-17 on 980714-0824.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint & Engineering IR 05000454/19980161998-07-31031 July 1998 Insp Repts 50-454/98-16 & 50-455/98-16 on 980713-17.No Violations Noted.Major Areas Inspected:Security Equipment Maint,Procedure & Records Review,Personnel Performance, Self Assessment & Previously Identified Issues IR 05000454/19980141998-07-31031 July 1998 Insp Repts 50-454/98-14 & 50-455/98-14 on 980531-0713. Violations Noted.Major Areas Inspected:Operations, Maint/Surveillance,Engineering & Plant Support IR 05000454/19980151998-07-22022 July 1998 Insp Repts 50-454/98-15 & 50-455/98-15 on 980706-09.No Violations Noted.Major Areas inspected:follow-up of April 1997 Maintenance Rule Baseline Insp That Reviewed Licensee Implementation of 10CFR50.65 ML20236H0321998-06-29029 June 1998 Insp Repts 50-454/98-11 & 50-455/98-11 on 980407-0530. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000454/19980101998-05-28028 May 1998 Insp Repts 50-454/98-10 & 50-455/98-10 on 980403-27 & 0506. Violations Noted.Major Areas Inspected:Review of Radiation Protection Program IR 05000454/19980131998-05-26026 May 1998 Insp Repts 50-454/98-13 & 50-455/98-13 on 980415-0508. Violations Noted.Major Areas Inspected:Plant Support ML20217R0141998-05-0505 May 1998 Insp Repts 50-454/98-09 & 50-455/98-09 on 980223-0406. Violations Noted.Major Areas Inspected:Operation, Maint Surveillance & Plant Support ML20217E8671998-03-27027 March 1998 Insp Repts 50-454/98-04 & 50-455/98-04 on 980120-0210. Violations Noted.Major Areas Inspected:Engineering,Technical Support & Self Assessment Activities ML20217E5501998-03-26026 March 1998 Insp Rept 50-454/97-21 on 970919-980228.Violations Noted. Major Areas Inspected:Observations of Operations Training, Preparation for SG Replacement,Maint/Construction Activities & Review of Engineering & Quality Assurance IR 05000454/19980081998-03-20020 March 1998 Insp Repts 50-454/98-08 & 50-455/98-08 on 980302-06. Violations Noted.Major Areas Inspected:Transportation & Solid Radioactive Waste Programs IR 05000454/19980051998-03-16016 March 1998 Insp Repts 50-454/98-05 & 50-455/98-05 on 980113-0223. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000454/19980071998-03-13013 March 1998 Insp Repts 50-454/98-07 & 50-455/98-07 on 980217-25.No Violations Noted.Major Areas Inspected:Various Aspects of Physical Security Program IR 05000454/19980061998-02-17017 February 1998 Insp Repts 50-454/98-06 & 50-455/98-06 on 980120-23 & 26. Noncited Violation Identified.Major Areas Inspected:Review of Radiation Protection Program IR 05000454/19980031998-02-11011 February 1998 Insp Repts 50-454/98-03 & 50-455/98-03 on 980108-27.No Violations Noted.Major Areas Inspected:Review of Security Measures Implemented to Support SG Replacement Project ML20202B9931998-02-0303 February 1998 Insp Repts 50-454/97-24 & 50-455/97-24 on 971202-980112. Violations Noted.Major Areas Inspected:Operations Maint/Surveillance Engineering & Plant Support IR 05000454/19980021998-01-21021 January 1998 Insp Repts 50-454/98-02 & 50-455/98-02 on 980105-09.No Violations Noted.Major Areas Inspected:Review of Emergency Preparedness Program & Aspect of Plant Support IR 05000454/19970231998-01-14014 January 1998 Insp Repts 50-454/97-23 & 50-455/97-23 on 971117-1218. Violations Noted.Major Areas Inspected:Radiological Protection & Chemistry (Rp&C) Controls & Staff Knowledge & Performance in Rp&C ML20199J9091997-12-24024 December 1997 Insp Repts 50-454/97-22 & 50-455/97-22 on 971017-1201. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000454/19970201997-12-0404 December 1997 Insp Repts 50-454/97-20 & 50-455/97-20 on 970909-1016. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support & Security Event That Occurred on 970815 IR 05000454/19970131997-10-30030 October 1997 Insp Rept 50-454/97-13 on 970811-0918.Violations Noted.Major Areas Inspected:Engineering & Plant Efforts for Upcoming Unit 1 SG Replacement Project IR 05000454/19970151997-10-20020 October 1997 Insp Repts 50-454/97-15 & 50-455/97-15 on 970725-0908. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000454/19970191997-10-0202 October 1997 Insp Repts 50-454/97-19 & 50-455/97-19 on 970908-18. Violations Noted & Being Considered for Escalated Enforcement Action.Major Areas Inspected:Several post-fire Safe Shutdown Issues IR 05000454/19970171997-10-0101 October 1997 Insp Repts 50-454/97-17 & 50-455/97-17 on 970825-0912. Violations Noted.Major Areas Inspected:Review of Radiation Protection Program & Planning for SG Replacement Project IR 05000454/19970161997-09-30030 September 1997 Insp Repts 50-454/97-16 & 50-455/97-16 on 970612-0918. Violations Noted.Major Areas Inspected:Review of NRC follow-up Items,Problem Identification Forms,Qa C/A Repts & Emphasis on EOPs & EOP Operator Response Times IR 05000454/19970121997-08-22022 August 1997 Insp Repts 50-454/97-12 & 50-455/97-12 on 970613-0724.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000454/19970141997-08-0101 August 1997 Insp Repts 50-454/97-14 & 50-455/97-14 on 970714-18.No Violations Noted.Major Areas Inspected:Review of Effluent Radiation Monitoring Sys,Cr & Auxiliary Bldg Filtered HVAC & REMP IR 05000454/19970111997-08-0101 August 1997 Insp Repts 50-454/97-11 & 50-455/97-11 on 970630-0707. Violations Noted.Major Areas Inspected:Insp Included Review of Physical Security Program 1999-09-08
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000454/19990121999-10-0808 October 1999 Insp Repts 50-454/99-12 & 50-455/99-12 on 990803-0916.One NCV Occurred.Major Areas Inspected:Operations,Engineering, Maint/Surveillance & Plant Support IR 05000454/19990161999-10-0101 October 1999 Insp Repts 50-454/99-16 & 50-455/99-16 on 990907-10.No Violations Noted.Major Areas Inspected:Radiation Protection & Chemistry Program Included Water Chemistry Control Program & Chemistry Instrument Quality Control Program IR 05000454/19990151999-09-30030 September 1999 Revised Pages Eight Through Eleven to Insp Repts 50-454/99-15 & 50-455/99-15,correcting Inaccuracies with Docket Numbers & Tracking Numbers IR 05000454/19990141999-09-17017 September 1999 Insp Repts 50-454/99-14 & 50-455/99-14 on 990823-27.No Violations Noted.Major Areas Inspected:Physical Security Program ML20211P2001999-09-0808 September 1999 Insp Repts 50-454/99-15 & 50-455/99-15 on 990824-26.No Violations Noted.Major Areas Inspected:Evaluation of Licensee Performance During Exercise of EP IR 05000454/19990101999-08-25025 August 1999 Insp Repts 50-454/99-10 & 50-455/99-10 on 990622-0802.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000254/19990101999-08-20020 August 1999 Insp Repts 50-254/99-10,50-265/99-10,50-454/99-09, 50-455/99-09,50-456/99-10 & 50-457/99-10 on 990628-0721. Major Areas Inspected:Licensee C/A Approach & Implementation of Configuration Control Processes at Each Site IR 05000454/19990081999-07-16016 July 1999 Insp Repts 50-454/99-08 & 50-455/99-08 on 990511-0621.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000454/19990041999-06-0404 June 1999 Insp Repts 50-454/99-04 & 50-455/99-04 on 990330-0510.No Violations Noted.Major Areas Inspected:Operations,Maint & Surveillance & Plant Support IR 05000454/19990071999-05-28028 May 1999 Insp Repts 50-454/99-07 & 50-455/99-07 on 990517-20.No Violations Noted.Major Areas Inspected:Fire Protection Program,Aspect of Plant Support IR 05000454/19990051999-05-20020 May 1999 Insp Rept 50-454/99-05 on 990401-22.No Violations Noted. Major Areas Inspected:Adequacy of Licensee Programs, Procedures,Equipment & Supporting Documentation for ISI Program IR 05000454/19990061999-05-19019 May 1999 Insp Repts 50-454/99-06 & 50-455/99-06 on 990419-23.No Violations Noted.Major Areas Inspected:Liquid & Gaseous Effluent Program,Radiological Environ Monitoring Program, Auditing Program & Outage Activities IR 05000454/19990031999-04-14014 April 1999 Insp Repts 50-454/99-03 & 50-455/99-03 on 990217-0329. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000454/19990021999-03-10010 March 1999 Insp Repts 50-454/99-02 & 50-455/99-02 on 990105-0216.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000454/19990011999-02-11011 February 1999 Insp Repts 50-454/99-01 & 50-455/99-01 on 990119-22.No Violations Noted.Major Areas Inspected:Adequacy of Licensee Programs,Procedures,Equipment & Supporting Documentation for Maint of Medium Voltage & Low Voltage Circuit Breakers IR 05000454/19980251999-01-19019 January 1999 Insp Repts 50-454/98-25 & 50-455/98-25 on 981124-990104.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000454/19980241998-12-30030 December 1998 Insp Repts 50-454/98-24 & 50-455/98-24 on 981130-1204.No Violations Noted.Major Areas Inspected:Ro & SRO Requalification Programs,Review of Training Administrative Procedures & Written & Operating Exam Matl IR 05000454/19980201998-12-18018 December 1998 Insp Repts 50-454/98-20 & 50-455/98-20 on 981006-1123.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000454/19980231998-12-17017 December 1998 Insp Repts 50-454/98-23 & 50-455/98-23 on 981116-17.No Violations Noted.Major Areas Inspected:Verification of Adequacy of Training to Plant Operators in Dealing with Fluctuations in Electric Grid Stability IR 05000454/19980221998-12-10010 December 1998 Partially Withheld Insp Repts 50-454/98-22 & 50-455/98-22 on 981116-20 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Selected Aspects of Physical Security Program & Testing of Licensee Access Control Equipment IR 05000454/19980211998-11-0505 November 1998 Insp Repts 50-454/98-21 & 50-455/98-21 on 981013-16.No Violations Noted.Major Areas Inspected:Alara Planning & Radiation Work Permit Programs & Whole Body Counting & Screening Programs IR 05000454/19980191998-10-29029 October 1998 Insp Repts 50-454/98-19 & 50-455/98-19 on 980825-1005.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000454/19980171998-09-18018 September 1998 Insp Repts 50-454/98-17 & 50-455/98-17 on 980714-0824.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint & Engineering IR 05000454/19980161998-07-31031 July 1998 Insp Repts 50-454/98-16 & 50-455/98-16 on 980713-17.No Violations Noted.Major Areas Inspected:Security Equipment Maint,Procedure & Records Review,Personnel Performance, Self Assessment & Previously Identified Issues IR 05000454/19980141998-07-31031 July 1998 Insp Repts 50-454/98-14 & 50-455/98-14 on 980531-0713. Violations Noted.Major Areas Inspected:Operations, Maint/Surveillance,Engineering & Plant Support IR 05000454/19980151998-07-22022 July 1998 Insp Repts 50-454/98-15 & 50-455/98-15 on 980706-09.No Violations Noted.Major Areas inspected:follow-up of April 1997 Maintenance Rule Baseline Insp That Reviewed Licensee Implementation of 10CFR50.65 ML20236H0321998-06-29029 June 1998 Insp Repts 50-454/98-11 & 50-455/98-11 on 980407-0530. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000454/19980101998-05-28028 May 1998 Insp Repts 50-454/98-10 & 50-455/98-10 on 980403-27 & 0506. Violations Noted.Major Areas Inspected:Review of Radiation Protection Program IR 05000454/19980131998-05-26026 May 1998 Insp Repts 50-454/98-13 & 50-455/98-13 on 980415-0508. Violations Noted.Major Areas Inspected:Plant Support ML20217R0141998-05-0505 May 1998 Insp Repts 50-454/98-09 & 50-455/98-09 on 980223-0406. Violations Noted.Major Areas Inspected:Operation, Maint Surveillance & Plant Support ML20217E8671998-03-27027 March 1998 Insp Repts 50-454/98-04 & 50-455/98-04 on 980120-0210. Violations Noted.Major Areas Inspected:Engineering,Technical Support & Self Assessment Activities ML20217E5501998-03-26026 March 1998 Insp Rept 50-454/97-21 on 970919-980228.Violations Noted. Major Areas Inspected:Observations of Operations Training, Preparation for SG Replacement,Maint/Construction Activities & Review of Engineering & Quality Assurance IR 05000454/19980081998-03-20020 March 1998 Insp Repts 50-454/98-08 & 50-455/98-08 on 980302-06. Violations Noted.Major Areas Inspected:Transportation & Solid Radioactive Waste Programs IR 05000454/19980051998-03-16016 March 1998 Insp Repts 50-454/98-05 & 50-455/98-05 on 980113-0223. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000454/19980071998-03-13013 March 1998 Insp Repts 50-454/98-07 & 50-455/98-07 on 980217-25.No Violations Noted.Major Areas Inspected:Various Aspects of Physical Security Program IR 05000454/19980061998-02-17017 February 1998 Insp Repts 50-454/98-06 & 50-455/98-06 on 980120-23 & 26. Noncited Violation Identified.Major Areas Inspected:Review of Radiation Protection Program IR 05000454/19980031998-02-11011 February 1998 Insp Repts 50-454/98-03 & 50-455/98-03 on 980108-27.No Violations Noted.Major Areas Inspected:Review of Security Measures Implemented to Support SG Replacement Project ML20202B9931998-02-0303 February 1998 Insp Repts 50-454/97-24 & 50-455/97-24 on 971202-980112. Violations Noted.Major Areas Inspected:Operations Maint/Surveillance Engineering & Plant Support IR 05000454/19980021998-01-21021 January 1998 Insp Repts 50-454/98-02 & 50-455/98-02 on 980105-09.No Violations Noted.Major Areas Inspected:Review of Emergency Preparedness Program & Aspect of Plant Support IR 05000454/19970231998-01-14014 January 1998 Insp Repts 50-454/97-23 & 50-455/97-23 on 971117-1218. Violations Noted.Major Areas Inspected:Radiological Protection & Chemistry (Rp&C) Controls & Staff Knowledge & Performance in Rp&C ML20199J9091997-12-24024 December 1997 Insp Repts 50-454/97-22 & 50-455/97-22 on 971017-1201. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000454/19970201997-12-0404 December 1997 Insp Repts 50-454/97-20 & 50-455/97-20 on 970909-1016. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support & Security Event That Occurred on 970815 IR 05000454/19970131997-10-30030 October 1997 Insp Rept 50-454/97-13 on 970811-0918.Violations Noted.Major Areas Inspected:Engineering & Plant Efforts for Upcoming Unit 1 SG Replacement Project IR 05000454/19970151997-10-20020 October 1997 Insp Repts 50-454/97-15 & 50-455/97-15 on 970725-0908. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000454/19970191997-10-0202 October 1997 Insp Repts 50-454/97-19 & 50-455/97-19 on 970908-18. Violations Noted & Being Considered for Escalated Enforcement Action.Major Areas Inspected:Several post-fire Safe Shutdown Issues IR 05000454/19970171997-10-0101 October 1997 Insp Repts 50-454/97-17 & 50-455/97-17 on 970825-0912. Violations Noted.Major Areas Inspected:Review of Radiation Protection Program & Planning for SG Replacement Project IR 05000454/19970161997-09-30030 September 1997 Insp Repts 50-454/97-16 & 50-455/97-16 on 970612-0918. Violations Noted.Major Areas Inspected:Review of NRC follow-up Items,Problem Identification Forms,Qa C/A Repts & Emphasis on EOPs & EOP Operator Response Times IR 05000454/19970121997-08-22022 August 1997 Insp Repts 50-454/97-12 & 50-455/97-12 on 970613-0724.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000454/19970141997-08-0101 August 1997 Insp Repts 50-454/97-14 & 50-455/97-14 on 970714-18.No Violations Noted.Major Areas Inspected:Review of Effluent Radiation Monitoring Sys,Cr & Auxiliary Bldg Filtered HVAC & REMP IR 05000454/19970111997-08-0101 August 1997 Insp Repts 50-454/97-11 & 50-455/97-11 on 970630-0707. Violations Noted.Major Areas Inspected:Insp Included Review of Physical Security Program 1999-09-08
[Table view] Category:UTILITY
MONTHYEARIR 05000455/19900211990-11-14014 November 1990 Insp Rept 50-455/90-21 on 900910-11,24-26 & 1107.No Violations or Deviations Noted.Major Areas Inspected: Inservice Insp Activities Including Review of Program, Procedures,Observation of Work Activities & Data Review IR 05000455/19900221990-11-13013 November 1990 Insp Rept 50-455/90-22 on 901002-1107.One Violation Noted. Major Areas Inspected:Circumstances Re Closed Unit 2 Intermediate Head Safety Injection Throttle valve,2518822A ML20058G3741990-11-0505 November 1990 Page 9 to Insp Repts 50-454/90-16 & 50-455/90-15,erroneously Deleted from Original Rept IR 05000454/19900161990-08-29029 August 1990 Insp Repts 50-454/90-16 & 50-455/90-15 on 900814-17.No Violations Noted.Major Areas Inspected:Emergency Prepardness Exercise,Licensee Action on Previously Identified Items & Status of Onsite Meteorological Monitoring Program IR 05000454/19900171990-08-17017 August 1990 Insp Repts 50-454/90-17 & 50-455/90-16 on 900701-0811.No Violations or Deviations Noted.Major Areas Inspected:Esf Sys,Onsite Event Follow Up,Reactor Startup,Current Matl Condition,Radiological Controls & Security IR 05000454/19900141990-07-16016 July 1990 Safety Insp Rept 50-454/90-14 & 50-455/90-13 on 900513-0630. Major Areas Inspected:Operational Safety,Esf Sys,Onsite Event follow-up,current Matl Condition,Security,Radiological Controls & Self Assessment/Quality Verification IR 05000454/19900151990-06-26026 June 1990 Insp Repts 50-454/90-15 & 50-455/90-14 on 900611-14.No Violations or Deviations Noted.Major Areas Inspected: Radiological Protection Program Including,Changes,Audits & Surveillances,External & Maint Exposure Control IR 05000454/19890161989-08-30030 August 1989 Safety Insp Repts 50-454/89-16 & 50-455/89-18 on 890701-0819.Violations Noted.Major Areas Inspected:Plant Matl Condition,Operational Safety,Mud in Essential Svc Water Sys,Security & Discrepancy Records IR 05000454/19890141989-07-11011 July 1989 Safety Insp Repts 50-454/89-14 & 50-455/89-16 on 890518-0630.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety,Esf Sys Walkdown,Fire Protection,Event Followup & Maint/Surveillance IR 05000454/19890151989-07-0707 July 1989 Insp Repts 50-454/89-15 & 50-455/89-17 on 890612-20.No Violations Noted.Major Areas Inspected:Radiological Protection Program During Power Operation,Including Changes in Organization,Audits & Training & Qualification IR 05000454/19890101989-06-0505 June 1989 Insp Repts 50-454/89-10 & 50-455/89-12 on 890401-0517.No Violations or Deviations Noted.Major Areas Inspected: Operational Safety,Event Followup,Mud Buildup in Essential Svc Water Lines,Security & LERs IR 05000454/19890131989-05-24024 May 1989 Insp Repts 50-454/89-13 & 50-455/89-15 on 890424-28.No Violations Noted.Major Areas Inspected:Chemistry Program, Including Procedures,Organization & Training & Primary & Secondary Sys Water QC Programs IR 05000454/19890081989-04-24024 April 1989 Partially Withheld Physical Security Insp Repts 50-454/89-08 & 50-455/89-11 on 890327-0403 (Ref 10CFR73.21(c)(2)).No Violations Noted.Major Areas Inspected:Mgt Support - Security Program Audits & Protected Alarm Barriers IR 05000454/19890041989-04-19019 April 1989 Insp Repts 50-454/89-04 & 50-455/89-07 on 890217-0331. Violations Noted.Major Areas Inspected:Operational Safety, Event Followup,Maint/Surveillance,Plant Startup from Refueling & Use of under-rated Gaskets in Manways IR 05000454/19890091989-04-12012 April 1989 Insp Repts 50-454/89-09 & 50-455/89-06 on 890227-0316. Violations Noted.Major Areas Inspected:Design Changes & Mods & Dedication of Commercial Grade Equipment for safety-related Applications IR 05000454/19890071989-03-31031 March 1989 Insp Repts 50-454/89-07 & 50-455/89-10 on 890313-17 & 22. Violation Noted.Major Areas Inspected:Implementation of Inservice Testing,Including Administrative & Technical Procedures,Performance of Testing & Retention of Records IR 05000454/19890031989-03-23023 March 1989 Physical Security Insp Repts 50-454/89-03 & 50-455/89-05 on 890201-0303.Major Areas Inspected:Licensee Plans for Coping W/Strikes,Licensee Initial Implementation of Strike Plan & Return to Normal Security Operations IR 05000454/19890021989-03-0202 March 1989 Insp Repts 50-454/89-02 & 50-455/89-02 on 890123-0206.No Violations Noted.Major Areas Inspected:Implementation of Fire Protection Program.Weaknesses Noted in Control of Transient Combustible Matls & Control of Flammable Liquids IR 05000454/19890011989-02-28028 February 1989 Safety Insp Repts 50-454/89-01 & 50-455/89-01 on 890101- 0216.Major Areas Inspected:Licensee Action on Previous Insp Findings,Operational Safety,Event Followup & Refueling & Spent Fuel Pit Activities.Util Identified Violation Noted IR 05000455/19890031989-02-27027 February 1989 Insp Rept 50-455/89-03 on 890118,24-26,31 & 0207,09,15 & 16. No Violations or Deviations Noted.Major Areas Inspected: Inservice Insp Activities,Including Programs,Procedures, Observation of Work Activities & Data Review IR 05000454/19880171988-10-19019 October 1988 Insp Rept 50-454/88-17 on 880914,20-22,27-29 & 1017.No Violations Noted.Major Areas Inspected:Inservice Insp Activities,Including Review of Program (73051),procedures (73052) & Observation of Work activities(73753) ML20207N8801988-10-12012 October 1988 Insp Rept 50-454/88-19 on 880919-28.Violations Noted: Inadequate Procedures for Installation & Use of Tygon Tubing for RCS Level Indication.Major Areas Inspected:Loss of Train of RHR When Water Level in RCS Lowered on 880919 IR 05000454/19880161988-10-0505 October 1988 Safety Insp Repts 50-454/88-16 & 50-455/88-15 on 880816- 0930.Violations Noted.Major Areas Inspected:Previous Insp Findings,Operations Summary,Training & Refueling & Spent Fuel Pit Activities IR 05000454/19880181988-10-0303 October 1988 Insp Repts 50-454/88-18 & 50-455/88-16 on 880919-22.No Violations Noted.Major Areas Inspected:Action on Previously Identified Items,Emergency Plan Activations & Status of Emergency Preparedness Program.Two Open Items Identified IR 05000454/19880131988-09-13013 September 1988 Team Insp Repts 50-454/88-13 & 50-455/88-13 on 880801-12.No Violations Noted.Major Areas Inspected:Operation Radiation Protection,Radwaste Mgt & Nonradiological Chemistry Programs,Including Health Physics Organization IR 05000454/19880141988-08-29029 August 1988 Safety Insp Rept 50-454/88-14 on 880810-12.No Violations or Deviations Noted.Major Areas Inspected:Facility Mods Associated W/Snubber Reduction,Training & Licensee Action on Previous Insp Findings IR 05000454/19880111988-08-19019 August 1988 Safety Insp Repts 50-454/88-11 & 50-455/88-11 on 880701- 0815.Violation Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings,Lers,Bulletin Followup,Operations Summary,Training,Refueling,Surveillance & Maint IR 05000454/19880101988-07-14014 July 1988 Partially Withheld Insp Repts 50-454/88-10 & 50-455/88-10 on 880623-0701 (Ref 10CFR73.21).No Violation Noted.Major Areas Inspected:Mgt Effectiveness - Security,Security Program Audits,Testing & Maint & Communications IR 05000454/19880091988-07-11011 July 1988 Safety Insp Repts 50-454/88-09 & 50-455/88-09 on 880517- 0630.Violations Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings,Lers,Bulletins,Generic Ltrs, Operations Summary,Training & Spent Fuel Storage Racks IR 05000454/19880071988-06-0101 June 1988 Safety Insp Repts 50-454/88-07 & 50-455/88-07 on 880401- 0516.Violations Noted.Major Areas Inspected:Util Action on Previous Insp Findings,Lers,Bulletins,Operations Summary, Engineering & Technical Support & QA Programs IR 05000454/19880081988-05-27027 May 1988 Insp Repts 50-454/88-08,50-455/88-08 & 50-456/88-16 on 880509-19.No Violations or Deviations Noted.Major Areas Inspected:Review of Action on Previous Insp Items & Followup on SER Items IR 05000454/19880061988-04-11011 April 1988 Safety Insp Repts 50-454/88-06 & 50-455/88-06 on 880212-0331.No Violations Noted.Major Areas Inspected: Licensee Action on Previous Insp Findings,Lers,Bulletins, Generic Ltrs,Operations Summary,Training & Surveillance IR 05000454/19880051988-03-28028 March 1988 Safety Insp Repts 50-454/88-05 & 50-455/88-04 on 880113-0317.No Violations or Deviations Noted.Major Areas Inspected:Licensee Actions on Previous Insp Findings,Startup Test Results Evaluation & Startup Test Results Verification IR 05000456/19880061988-03-0909 March 1988 Safety Insp Repts 50-456/88-06 & 50-457/88-08 on 880216-25. No Violations or Deviations Noted.Major Area Inspected: Licensee Implementation of Generic Ltr 83-28 in Areas of Equipment Classification & Vendor Interface IR 05000454/19880031988-02-26026 February 1988 Insp Repts 50-454/88-03 & 50-455/88-03 on 880111-0217. Violations Noted.Major Areas Inspected:Licensee Action on Previously Identified Finding,Ser/Technical Evaluation Rept Commitment & Environ Qualification Program Compliance IR 05000454/19880021988-02-24024 February 1988 Safety Insp Repts 50-454/88-02 & 50-455/88-02 on 880101- 0211.Violation Noted.Major Areas Inspected:Previous Insp Findings,Lers,Operations Summary,Training,Surveillance,Maint & Operational Safety,Esf Sys Walkdown & Info Notices ML20147H3091988-01-14014 January 1988 Safety Insp Repts 50-454/87-27 & 50-455/87-25 on 870707-09 & 0820-21.Violations Noted.Major Areas Inspected:Previous Insp Findings,Observation of Maint Surveillance Activities & Training IR 05000454/19870441988-01-0808 January 1988 Insp Repts 50-454/87-44 & 50-455/87-42 on 871208-11.No Violations or Deviations Noted.Major Areas Inspected: Operational Radiation Protection Activities During Surveillance Outage,Including Organization & Mgt Control IR 05000454/19870431988-01-0808 January 1988 Insp Repts 50-454/87-43 & 50-455/87-40 on 871201-31.No Violations or Deviations Noted.Major Areas Inspected:Util Actions on Previous Insp Findings,Bulletins,Lers,Operations Summary,Training,Local Leak Rate Testing & Surveillance IR 05000454/19870421987-12-11011 December 1987 Insp Repts 50-454/87-42 & 50-455/87-39 on 871118-20,23 & 24. No Violations or Deviations Noted.Major Areas Inspected:Qa, Confirmatory Measurements for in-plant Radiochemical Analyses & Organizaton & Mgt Control IR 05000454/19870411987-12-0909 December 1987 Insp Repts 50-454/87-41 & 50-455/87-38 on 871031-1130.No Violation or Deviation Noted.Major Areas Inspected:Lers, Generic Ltrs,Operations Summary,Training,Surveillance,Maint, Operational Safety,Allegations & Mgt Changes IR 05000454/19870391987-11-19019 November 1987 Safety Insp Repts 50-454/87-39 & 50-455/87-36 on 871002-30. No Violations or Deviations Noted.Major Areas Inspected: Licensee Action on Previous Insp Findings,Operations Summary,Design Changes & Mods,Training & Surveillance IR 05000454/19870401987-11-0202 November 1987 Insp Repts 50-454/87-40 & 50-455/87-34 on 871013-15.No Violations,Deficiencies or Deviations Noted.Major Areas Inspected:Emergency Preparedness Exercise,Including Key Functions & Locations During Exercise.Related Info Encl IR 05000454/19870381987-10-13013 October 1987 Insp Repts 50-454/87-38 & 50-455/87-35 on 870901-1001. Violation Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings,Lers,Operations Summary,Training, Surveillance,Maint,Operational Safety & Allegations IR 05000454/19870361987-09-23023 September 1987 Insp Repts 50-454/87-36 & 50-455/87-33 on 870831-0904.No Violations or Deviations Noted.Major Areas Inspected: Chemistry Program,Procedures,Organization,Training,Qa,Water Quality Control & Confirmatory Measurements IR 05000454/19870341987-09-21021 September 1987 Insp Repts 50-454/87-34 & 50-455/87-32 on 870824-0904.No Violations or Deviations Noted.Major Areas Inspected: Operational Radiation Protection & Transportation Activities,Including Organization & Mgt Control IR 05000454/19870351987-09-14014 September 1987 Partially Withheld Physical Security Insp Repts 50-454/87-35 & 50-455/87-32 on 870817-21 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Review of Records & Repts,Keys & Combinations & Physical Barriers - Vital Areas IR 05000454/19870331987-09-10010 September 1987 Safety Insp Repts 50-454/87-33 & 50-455/87-31 on 870801-31. No Violations or Deviations Noted.Major Areas Inspected: Operations Summary,Training,Surveillance,Maint,Operational Safety & ESF Walkdown,Headquarters Request & Event Followup ML20234D2531987-09-10010 September 1987 Insp Repts 50-454/87-32,50-455/87-30 & 50-456/87-28 on 870810-17.No Violations Noted.Major Areas Inspected: Emergency Operation Procedures IR 05000454/19870301987-08-31031 August 1987 Special Fitness for Duty Program Insp Repts 50-454/87-30 & 50-455/87-28 on 870713-17.Major Areas Inspected:Policies, Procedures & Practices of Fitness Duty Program & Employee Assistance Program 1990-08-29
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000454/19990121999-10-0808 October 1999 Insp Repts 50-454/99-12 & 50-455/99-12 on 990803-0916.One NCV Occurred.Major Areas Inspected:Operations,Engineering, Maint/Surveillance & Plant Support IR 05000454/19990161999-10-0101 October 1999 Insp Repts 50-454/99-16 & 50-455/99-16 on 990907-10.No Violations Noted.Major Areas Inspected:Radiation Protection & Chemistry Program Included Water Chemistry Control Program & Chemistry Instrument Quality Control Program IR 05000454/19990151999-09-30030 September 1999 Revised Pages Eight Through Eleven to Insp Repts 50-454/99-15 & 50-455/99-15,correcting Inaccuracies with Docket Numbers & Tracking Numbers IR 05000454/19990141999-09-17017 September 1999 Insp Repts 50-454/99-14 & 50-455/99-14 on 990823-27.No Violations Noted.Major Areas Inspected:Physical Security Program ML20211P2001999-09-0808 September 1999 Insp Repts 50-454/99-15 & 50-455/99-15 on 990824-26.No Violations Noted.Major Areas Inspected:Evaluation of Licensee Performance During Exercise of EP PNO-III-99-041, on 990902,employees at Station Reported Feeling Ground Motion Associated with Earthquake.Plant Staff Checked Plant Sys & Equipment & No Evidence of Damage Was Found1999-09-0303 September 1999 PNO-III-99-041:on 990902,employees at Station Reported Feeling Ground Motion Associated with Earthquake.Plant Staff Checked Plant Sys & Equipment & No Evidence of Damage Was Found IR 05000454/19990101999-08-25025 August 1999 Insp Repts 50-454/99-10 & 50-455/99-10 on 990622-0802.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000254/19990101999-08-20020 August 1999 Insp Repts 50-254/99-10,50-265/99-10,50-454/99-09, 50-455/99-09,50-456/99-10 & 50-457/99-10 on 990628-0721. Major Areas Inspected:Licensee C/A Approach & Implementation of Configuration Control Processes at Each Site IR 05000454/19990081999-07-16016 July 1999 Insp Repts 50-454/99-08 & 50-455/99-08 on 990511-0621.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000454/19990041999-06-0404 June 1999 Insp Repts 50-454/99-04 & 50-455/99-04 on 990330-0510.No Violations Noted.Major Areas Inspected:Operations,Maint & Surveillance & Plant Support IR 05000454/19990071999-05-28028 May 1999 Insp Repts 50-454/99-07 & 50-455/99-07 on 990517-20.No Violations Noted.Major Areas Inspected:Fire Protection Program,Aspect of Plant Support IR 05000454/19990051999-05-20020 May 1999 Insp Rept 50-454/99-05 on 990401-22.No Violations Noted. Major Areas Inspected:Adequacy of Licensee Programs, Procedures,Equipment & Supporting Documentation for ISI Program IR 05000454/19990061999-05-19019 May 1999 Insp Repts 50-454/99-06 & 50-455/99-06 on 990419-23.No Violations Noted.Major Areas Inspected:Liquid & Gaseous Effluent Program,Radiological Environ Monitoring Program, Auditing Program & Outage Activities IR 05000454/19990031999-04-14014 April 1999 Insp Repts 50-454/99-03 & 50-455/99-03 on 990217-0329. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000454/19990021999-03-10010 March 1999 Insp Repts 50-454/99-02 & 50-455/99-02 on 990105-0216.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000454/19990011999-02-11011 February 1999 Insp Repts 50-454/99-01 & 50-455/99-01 on 990119-22.No Violations Noted.Major Areas Inspected:Adequacy of Licensee Programs,Procedures,Equipment & Supporting Documentation for Maint of Medium Voltage & Low Voltage Circuit Breakers ML20199H8811999-01-19019 January 1999 Notice of Violation from Insp on 981124-990104.Violation Noted:From 871029 to 981123,test Controls for Stroke Time Testing of AFW Pump Discharge Valves Were Not Properly Established IR 05000454/19980251999-01-19019 January 1999 Insp Repts 50-454/98-25 & 50-455/98-25 on 981124-990104.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000454/19980241998-12-30030 December 1998 Insp Repts 50-454/98-24 & 50-455/98-24 on 981130-1204.No Violations Noted.Major Areas Inspected:Ro & SRO Requalification Programs,Review of Training Administrative Procedures & Written & Operating Exam Matl IR 05000454/19980201998-12-18018 December 1998 Insp Repts 50-454/98-20 & 50-455/98-20 on 981006-1123.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000454/19980231998-12-17017 December 1998 Insp Repts 50-454/98-23 & 50-455/98-23 on 981116-17.No Violations Noted.Major Areas Inspected:Verification of Adequacy of Training to Plant Operators in Dealing with Fluctuations in Electric Grid Stability IR 05000454/19980221998-12-10010 December 1998 Partially Withheld Insp Repts 50-454/98-22 & 50-455/98-22 on 981116-20 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Selected Aspects of Physical Security Program & Testing of Licensee Access Control Equipment IR 05000454/19980211998-11-0505 November 1998 Insp Repts 50-454/98-21 & 50-455/98-21 on 981013-16.No Violations Noted.Major Areas Inspected:Alara Planning & Radiation Work Permit Programs & Whole Body Counting & Screening Programs IR 05000454/19983011998-11-0303 November 1998 NRC Operator Licensing Exam Repts 50-454/98-301(OL) & 50-455/98-301(OL) for Tests Administered on 980914-22.Out of Five License Applicants,One SRO Passed All Portions of Exam. Two RO & Two SRO Applicants Failed Portions of Exam IR 05000454/19980191998-10-29029 October 1998 Insp Repts 50-454/98-19 & 50-455/98-19 on 980825-1005.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000454/19980171998-09-18018 September 1998 Insp Repts 50-454/98-17 & 50-455/98-17 on 980714-0824.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint & Engineering ML20153D7701998-09-18018 September 1998 Notice of Violation from Insp on 980714-0824.Violation Noted:During 980616-18,AP 1100-3,Rev 11,inappropriate to Circumstances,In That Procedural Guidance Led to Belief That Main CR Ventilation Envelope Altered When CR Doors Opened ML20236W2081998-07-31031 July 1998 Notice of Violation from Insp on 980531-0713.Violation Noted:As of 980713,SF Storage Pool Design Would Not Have Prevented Inadvertent Draining Below 423 Feet 2 Inches IR 05000454/19980161998-07-31031 July 1998 Insp Repts 50-454/98-16 & 50-455/98-16 on 980713-17.No Violations Noted.Major Areas Inspected:Security Equipment Maint,Procedure & Records Review,Personnel Performance, Self Assessment & Previously Identified Issues IR 05000454/19980141998-07-31031 July 1998 Insp Repts 50-454/98-14 & 50-455/98-14 on 980531-0713. Violations Noted.Major Areas Inspected:Operations, Maint/Surveillance,Engineering & Plant Support IR 05000454/19980151998-07-22022 July 1998 Insp Repts 50-454/98-15 & 50-455/98-15 on 980706-09.No Violations Noted.Major Areas inspected:follow-up of April 1997 Maintenance Rule Baseline Insp That Reviewed Licensee Implementation of 10CFR50.65 ML20236H0291998-06-29029 June 1998 Notice of Violation from Insp on 980407-0530.Violation Noted:On 980502,OOS 970012670 Not Sufficient to Isolate Equipment Being Worked on ML20236H0321998-06-29029 June 1998 Insp Repts 50-454/98-11 & 50-455/98-11 on 980407-0530. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20248C0441998-05-28028 May 1998 Notice of Violation from Insp on 980403-27 & 0506.Violations Noted:Radiologically Posted Area Established for sodium-24 Used in Moisture Carryover Test Was Not Posted W/Sign Bearing Radiation Symbol & Listed Words IR 05000454/19980101998-05-28028 May 1998 Insp Repts 50-454/98-10 & 50-455/98-10 on 980403-27 & 0506. Violations Noted.Major Areas Inspected:Review of Radiation Protection Program IR 05000454/19980131998-05-26026 May 1998 Insp Repts 50-454/98-13 & 50-455/98-13 on 980415-0508. Violations Noted.Major Areas Inspected:Plant Support ML20248B0931998-05-26026 May 1998 Notice of Violation from Insp on 980415-0508.Violation Noted:Ffd Program Was Not Appropriately Implemented ML20248C7271998-05-21021 May 1998 Errata to Notice of Violation from Insp on 980113-0223 W/Combined Violations ML20217Q9671998-05-0505 May 1998 Notice of Violation from Insp on 980224-0406.Violations Noted:Unit 1 Changed Operational Mode from Mode 5 to Mode 4 When Conditions for LCO of TS 3.4.6.1.b Were Not Met & Associated Action Required Shutdown within Specified Time ML20217R0141998-05-0505 May 1998 Insp Repts 50-454/98-09 & 50-455/98-09 on 980223-0406. Violations Noted.Major Areas Inspected:Operation, Maint Surveillance & Plant Support ML20217E8421998-03-27027 March 1998 Notice of Violation from Insp on 980120-0210.Violation Noted:On 960607,team Identified That Field Change Request (Fcr) 960062 Was Not Subjected to Design Control Measures Commensurate W/Measures Applied to Original Design ML20217E8671998-03-27027 March 1998 Insp Repts 50-454/98-04 & 50-455/98-04 on 980120-0210. Violations Noted.Major Areas Inspected:Engineering,Technical Support & Self Assessment Activities ML20217E5501998-03-26026 March 1998 Insp Rept 50-454/97-21 on 970919-980228.Violations Noted. Major Areas Inspected:Observations of Operations Training, Preparation for SG Replacement,Maint/Construction Activities & Review of Engineering & Quality Assurance ML20217E5261998-03-26026 March 1998 Notice of Violation from Insp on 970919-980226.Violations Noted:Licensee Contracted Level II Liquid Penetrant Exam Examiner Incorrectly Performed Liquid Penetrant Exam of SG IR 05000454/19980081998-03-20020 March 1998 Insp Repts 50-454/98-08 & 50-455/98-08 on 980302-06. Violations Noted.Major Areas Inspected:Transportation & Solid Radioactive Waste Programs ML20217D1031998-03-20020 March 1998 Notice of Violation from Insp on 980302-06.Violation Noted: on 980306,chemistry Technician Failed to Close Valve V8 Before Withdrawing 2 Gas Samples from Panel for Hydrogen & Isotopic Analyses ML20248L8161998-03-16016 March 1998 Notice of Violation from Insp on 980113-0223.Violations Noted:On 980117,plant Administrative Procedure 330-1,section c.b.c.4,not Implemented & on 970910,licensee Operated Gwps Differently from Ufsar,Section 11.3.2.1 IR 05000454/19980051998-03-16016 March 1998 Insp Repts 50-454/98-05 & 50-455/98-05 on 980113-0223. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000454/19980071998-03-13013 March 1998 Insp Repts 50-454/98-07 & 50-455/98-07 on 980217-25.No Violations Noted.Major Areas Inspected:Various Aspects of Physical Security Program IR 05000454/19980061998-02-17017 February 1998 Insp Repts 50-454/98-06 & 50-455/98-06 on 980120-23 & 26. Noncited Violation Identified.Major Areas Inspected:Review of Radiation Protection Program 1999-09-08
[Table view] |
Inspection Report - Byron - 1985037 |
---|
|
|
Text
'
.
,
U.S. NUCLEAR REGULATORY COMMISSION
REGION III
Reports No. 50-454/85037(DRSS); 50-455/85041(DRSS)
Docket Nos.- 50-454; 50-455 Licenses No. NPF-37; CPPR-131 Licensee: Commonwealth Edison Company Post Office Box 767 Chicago, IL 60690
, Facility Name: Byron Nuclear Power Station, Units 1 and 2 Inspection At: Byron Site,~ Byron, IL Inspection Conducted: August 20-21, 1985 and between November 4 and December 18, 1985 Inspectors:
'
N ic h /h/84-Date W. B. G an //7/6Z Date YY G. M. France III (August 21, 1985 only) //7/84 Date
' Approved By: . ger, Chief //7/#G Facilities Radiation Protection
~
Date Section Inspection Summary Inspection on August 20-21 1985 and between November 4 and December 18, 1985-(Reports No. 50-454/85037(DRSS); 50-455/85041(DRSS))
Areas Inspected: Routine, unannounced inspection of the radiation protection program including: ' organization and management controls; training and qualifications; exposure controls; control'of radioactive material; solid radwaste; transportation; an allegation concerning health physics practices; licensee action on previous findings; Unit 1 outage planning; a Unit 2 contamination incident; a contaminated resin transfer to non-licensed vendors; status of Unit.2 radiation monitors; and selected IE Information Notices. The inspection involved 176 inspector-hours onsite by two NRC inspector Results: No violations or deviations were identifie ,
glijog f 4
'
.
+
DETAILS 1. Persons Contacted'
R. Aker, Lead Health Physicist, Zion Station F. Hornbeak, Technical Staff Supervisor
- T. Joyce, Assistant Superintendent Technical Services
- J. Langan, Compliance Staff R. Querio, Station Manager D. St Clair, Operating Engineer, Rad Waste L. Sues, Assistant Superintendent, Operations
- J. Van Laere, Radiation-Chemistry Supervisor
- R. Ward, Services Superintendent K. Weaver, Station Health Physicist
- J. Hinds, NRC Senior Resident Inspector W. Forney, NRC Reactor Projects Section Chief
- Denotes those attending the exit meetin The inspectors also contacted members of the operating, rad / chem, technical, mechanical maintenance, electrical maintenance, training, security, and engineering staffs during this inspectio . General This inspection, which began at 10:00 a.m. on August 20, 1985, was conducted to examine the routine radiation protection, radwaste, and transportation of radioactive material activities; maintenance outage activities for Unit 1; interface between rad-chem and other station organizations; the results of increased management involvement in the radiological control program; and the preoperational status of Unit . Licensee Action on Previous Inspection Findings (Closed) Open Item (454/85014-01; 455/85009-01). Technical Specifications training for RCT The licensee has developed appropriate training which will be offered during the first quarter 1986, as part of the RCT qualification progra (Closed) Open Item (454/85014-02; 455/85009-02): Review neutron dose rates in accordance with the FSAR. A review of.Startup Test 2.61.33 indicated neutron readings at 90-100% power levels exceeded FSAR value To reduce the neutron fields, the nozzle cover plates were lowered flush with the cavity floor during this outage. A licensee Action Item Record No. 6-85-277 has been submitted to conduct surveys at the 90-100% power levels to determine the effect of this new shielding configuratio (Closed) Open Item (454/85014-03; 455/85009-03): Incorporate package receipt instructions for radioactive materials into administrative procedure Instructions have been included in BAP 800-15, Receipt
--_ __
.
Verification Checklist, for storeroom personnel to contact the Rad / Chem Department upon receipt of radioactive labelled packages and retain all shipping papers with the package until Rad /Che'n representatives have completed the required inspectio . Management As a followup to the weaknesses identified during the previous inspection (50-454/85022; 50-455/85020), the inspectors concentrated on the-implementation of the radiation controls program (RCP). This inspection included a review of management involvement and program support; effectiveness of the Rad / Chem Department in implementing this program; and worker adherence to radiation protection procedures and good health physics practices. In general, programmatic improvements were observed by the inspectors and noted in discussions with onsite personnel as addressed belo These improvements reflected increased worker experience levels, worker initiative, and the impact of the Radiation Awareness program. Radiation Awareness sessions were conducted by upper plant management, rad / chem, and training personnel for all CECO site personnel and contractor supervisory personnel to promote worker support for the
,
RC These sessions reemphasized good health physics techniques addressed i
in NGET training and the worker's requirement to adhere to radiation protection procedures and RWP provision Upper management's participation conveyed its support for the RCP and the necessity for individuals to adhere to radiation protection criteri The licensee plans to expand these sessions to include contractor personnel als To determine the perception of the RCP among workers, the inspectors interviewed members of the operating, mechanical maintenance, electrical maintenance, contract health physics, contract worker, and station rad / chem staffs at working and supervisory levels. The consensus was that strong management backing has had a positive impact on worker support of the RCP and the Rad / Chem Department's performanc Based on these discussions, it appears that a good working rapport exists between the Rad / Chem Department and other departments and that workers are using good health physics practices. The inspectors' observations confirmed the workers' comments. Additionally the inspectors noted: (1) increased worker inquisitiveness regarding radiological parameters associated with jobs; (2) RCT attentiveness to workers' inquiries and responses; (3) good frisking techniques; and (4) improved communication and interfaces between departments and the rad / chem staff. The inspectors also noted that the addition of contract radiation protection technicians during the current maintenance outage has had a positive effect by easing the workload pressure and also by providing valuable operational experience for.the licensee RCT staff. In general, it appears that the combination of increased operating experience and increased management support has had a significant impact on the effectiveness of the radiation protection program and its support by the plant workers. In discussions with upper plant management representatives, the inspectors stressed the need to maintain the current level of management backin The recent CECO reorganization resulted in insertion of two manager /
supervisors between the Rad / Chem Supervisor (RPM) and the Station Manage _ _ _ _ - _ _ _ . _ _ .
.
Based on discussions with the Station Manager and RPM, it appears that direct access remains available and direct communication between the station manager and RPM occurs whenever either person considers it necessary,
! although routine meetings are not regularly scheduled.
,
L The inspectors reviewed the licensee's audit program. A comprehensive I
audit of the radiation protection program was conducted by the corporate i office July 15-19, 1985. A station Radiation Protection Task Force was established to implement approximately forty corrective actions generated from the audit. Approximately thirty-nine corrective actions had been implemented and considered closed by December 5, 1985. Two audits of the rad / chem and radwaste programs were condsted in 1985 by the onsite QA department. Corrective action was taken on two minor finding No problems were note No violations or deviations were identifie . Training and Qualifications The inspector reviewed radiological systems training conducted by the station training department for the Rad / Chem staff. This training Las developed in response to weaknesses identified during the previous inspection, specifically, the RCT's inexperience with reactor system This session provides an overview of eleven reactor systems, addressing system function, design and radiological hazards associated with systems operation. Lesson plans were reviewed; no problems were noted. All currently qualified RCTs have completed this day-long session according to licensee records reviewed. The reactor systems training is included in the RCT certification program for incoming RCTs, but not in the continuing training sessions for RCTs. Based on RCT experience level, licensee representatives acknowledged a need for retraining in this area and agreed to include systems training in continuing RCT training sessions (0 pen Item 50-454/85037-01; 50-455/85041-01).
The inspector reviewed the resumes of the contract radiation protection personnel: 17 senior technicians, 20 junior technicians, four control point clerks and an onsite coordinator. The senior technicians appear to meet or exceed the technician selection criteria in ANSI 3.1 - 1978, and have extensive operational nuclear plant experience. The junior technicians and control point clerks appear to have training and experience commensurate with their assigned responsibilities.
,
In addition to the contract technicians, the licensee has augmented the radiation protection staff with five contract health physicists (HPs).
The function of the contract HPs is to provide feedback and advice on HP practices and implementation. The inspector reviewed the contract HPs'
resumes; they have extensive operational nuclear plant experience and are adequately qualifle A contractor (Hunter) supplies about 34 people who are committed to decontamination and general cleanup of plant areas. The decontamination activities are currently conducted under the supervision of the contract radiation protection technicians. Most plant areas appeared remarkably clean for a plant in a maintenance outag L
- . , ,
- . +
,
l
..
-No violations or deviations were identified.
>a 6 ~. ! Exposure Controls
- a .- External Controls
- The-inspectors reviewed the' licensee's external exposure control and
_ _ personal dosimetry programs, including: administrative-measures for controlling access and stay times in radiation. areas during normal
.and emergency operations; adequacy of-dosimetry program to meet routine and emergency needs; planning and preparation for maintenance and refueling tasks including ALARA considerations; required records, reports, and notifications; effectiveness of management techniques used to implement these programs; and experience concerning_self-identification and correction of program implementation weaknesse The inspector reviewed exposure results for the third and fourth quarter 1985, through November.24, 1985; no exposures exceeding NRC
< limits were identified._ Approximately 3700 individuals are currently
- whole body badged with additional extremity and multiple badgin The: licensee has reduced the number of people. requiring film badges s
from a high of 4300. This-reduction effort is continuing. The total-dose for 1985 through October was about 44 person-rem. This period includes a short maintenance outage in July and the current maintenance outage which began October 2 HPs review daily = exposure: updates to identify individuals approaching their limit, and contact the appropriate work supervisor and access control personnel when limits are' approached. Updates are maintained at access control. No problems were noted.-
No violations or deviations were note Internal Dosimetry Whole body count (WBC) results from June'to October were reviewe No results approaching the 40 MPC-hour _ evaluation level were note Bi-weekly reports generated by the contractor are reviewed by a health physicist to assure anomalous results and results exceeding the licensee's investigation. level are identifie Calibration of the standup NaI' scintillation counter indicated no problems, nor have daily check _ source readings (Co-60 and Co-137) identified instrument drift or abnormalities. Random tritium bioassay results were reviewe Results were comparable; no intakes approaching MPBB were note The WBC computer program converts Maximum Permissible Body Burdens (MPBB) to MPC-hours when the prescribed licensee's investigation level.(3% MPBB for one isotope; 5% MPBB total) is reached. However,.
'
this conversion'is not proceduralized in the BRP's-nor in informal procedures used by the HP staf A consultant is available for consultation if the computer fails. To determine compliance with 10 CFR 20.103, licensee representatives must be able to make the conversion. Licensee representatives agreed to proceduralize this methodology (0 pen Item 50-454/85022-09; 50-455/85020-01).
~
' *
.
m
.The? inspectors reviewed the respiratory protection program
~
f, '
including:- mask fit test records, medical qualification; type L '
and availability of respiratory protection equipment, and the respiratory' protection equipment cleaning and issue facilit The respiratory protection equipment cleaning and issue facility is l- located on the.426' elevation, in the. auxiliary building. The room
, ' appeared well equipped for cleaning and issuing respiratory protection equipment. Supplies of-masks,' filters, hoses and spare parts appeared
+
to-be adequate. The. inspector observed respirators being issued to
- ensure.that procedures for verification of medical qualifications and mask fit test were followed. The RCT on duty knew the requirements ifor issuing respirators and was familiar with the operation of the respirator cleaning facilit The RCT stated that the practice of-the worker leaving his NGET card as collateral when issued a-respirator has been working well. No problems were noted. No violations or deviations were identifie ;7.- Control-of Radioactive Materials and Contamination, Surveys, and Monitoring I The' inspectors reviewed the licensee's program for control of radioactive
-
materials and contamination' including: provisions for calibration,
'
performance checks and setting alarm points for radiation monitors, availability,of portable survey, sampling and contamination monitoring
, instruments; adequacy:of procedures-for calibration and use of survey and I sampling instruments; effectiveness of methods of control of radioactive
, and contaminated materials; and management techniques used-to implement l- the program and correct program weaknesse .The inspectors witnessed the preparation for the gasket replacement on
'
the Unit 1A. letdown heat exchanger.- The gasket replacement involved work in a high radiation area, a relatively high contamination area, and a potentially high airborne area. Preparations included building a HEPA filtered exhausted tent enclosure with step-off pads and a frisker statio Adequate supplies of protective clothing and respiratory protection were L
provided as required by the RWP. No problems were note The inspectors reviewed records of routine and special radiation and contamination surveys conducted during the outage. All surveys, routine
'
and special, are reviewed by an HP_ foreman for completeness and any unusual conditions. Except as'noted in Section 14, no problems were identified.
,
Supplies of protective clothing appeared to be adequate for the maintenance activities in progress. The laundry facilities did not appear to have large backlogs of soiled protective clothing. If shortages I occur at any time, additional supplies can be drawn from the stockroom /
warehous No problems were note The inspectors selectively reviewed survey instrument calibration
!- '
records. Instruments appeared to be calibrated in accordance with L . procedures. Calibration ranges reflected applicable ranges encountered
.
l
C ' ~
.,
h5 in the fiel Responses were within tolerance level A computer-tracking system is used to identify upcoming calibration date No problems were note No violations or deviations were identified.
P Solid Radwaste The inspectors-reviewed the licensee's solid radioactive waste management program, including: determination whether changes to equipment and procedures were in accordance with 10 CFR 50.59; adequacy of implementing procedures to properly classify and characterize waste, prepare manifests, and mark packages; overall performance of the process control and quality assurance programs; adequacy of required records, reports, and notifications; experience concerning identification and correction of .
programmatic weaknesse i The licensee uses a contracted mobile solidification service for the ,
packaging of spent resins as radwaste. All other solid dry active waste
'(DAW) is sorted in a HEPA filtered hood, and designated as compressible, noncompressible, combustible, noncombustible, or wet wast The combustible material, which must contain no vinyls, is set aside for volume reduction (VR) when that system becomes operational. According to the licensee about 200 55 gallon drums of combustible DAW are in storage for V The wet DAW is dried and stored for VR if it is combustibl Noncombustibles and noncompressibles are packaged and shipped to a licensed burial sit The inspectors observed limited startup testing of the volume reduction system; however, mechanical problems forced postponement of the test to after the inspection was complete The inspectors observed a DAW shipment of 32 drums and six LSA boxes on November 6, 1985. Licensee surveys were conducted in accordance with applicable procedures. No problems were identified with the shipping papers. Vehicle posting and radiation readings were in accordance with NRC regulation No violations or deviations were identifie . Transportation of Radioactive Materials The inspectors reviewed the licensee's transportation of radioactive materials program, including determination whether written implementing procedures are adequate, maintained current, properly approved, and acceptably implemented; determination whether shipments are in compliance with NRC and DOT regulations and the licensee's quality assurance program; determination if there were any transportation incidents involving licensee shipments; adequacy of required records, reports, shipment documentation, and notifications; and experience covering identification and correction of programmatic weaknesse Records of radioactive material shipments made during 1985 to date were reviewe During this period 17 shipments were made including nine
__ __
.
.
shipments of spent resins and DAW to licensed burial sites. No problems with shipment documentation, quality assurance or procedures were identifie No violations or deviations were identifie . Radiation Occurrence Reports (RORs)
R0Rs are written for violations 10 CFR 20, Ceco Radiation Protection Standards or Byron Radiation Protection Procedures. Thirty-eight RORs have been written at the station for 1985, through November. RORs were reviewed for significance, corrective actions, and timeliness of corrective actions. The reports appeared to have adequate and timely corrective action. Disciplinary action was taken on two occasions. RORs are trended and a report is submitted to management on a monthly basi The inspectors reviewed ROR 85-38 regarding an electrician who was burned
,
on the hands by an electrical source and exited the Unit 2 restricted i area without performing a hand and shoe frisk and without informing rad / chem that she was injured. The electrician exited the station through the guard house portal monitor and was taken to a Rockford hospital. When the rad / chem foreman was later notified, he dispatched an RCT to the hospital to survey the electricia The foreman also called the Station Health Physicist (HP) at home (Rockford) and requested he provide assistanc at the hospital. The station HP and the RCT both reported no detectable levels of contamination on the electrician. Station management is still investigating the incident. The electrician was assisted from the station and driven to the hospital by other station workers who should have known the procedure for frisking and notification of rad / chem. This will be reviewed during a future inspection. (0 pen Item 50-455/85041-02).
ROR-85-35 was written on September 5, 1985, after it was discovered that the Unit 1 containment had been above MPC for noble gases for about eight day A daily containment air sample is taken prior to allowing operator entry. Respiratory protection was not required at the levels foun However, the concern was the length of time between the initial high sample and the HPs understanding of the possible problem. Licensee corrective action was to issue a rad / chem memo dictating an improved method for reviewing sample results. Discussions of the memo and its importance were held with all HPs and with the HP foremen. A spot check of the air sample Jata sheets throughout the inspection showed the air sample data is reviewed by a chemist and an HP on a timely basi No violations or deviations were identifie One open item was established for future revie . Personal Contamination Reports Personal contamination reports were selectively reviewed. Ninety-six reports have been written from January 1 through November 10, 198 Corrective action appeared to be appropriate and timely. A frequent cause of personal contamination is drain backup. Rad / Chem representatives
. - - -__ - __-__- - __---____--__-_______----_-_-_----_ - _ - _ _ - _ _ _ _ _ -
. .. . . .. .
.
estimate approximately 75% of all problems the department encounters are related to floor drains. Station management has assigned a high priority to cleaning the drains and installing loop seals where warranted. The effect of these measures on contamination control will be monitored during future inspection No violations or deviations were identifie . (Closed) Allegation (RIII-85-A-0188)
The inspectors reviewed allegations submitted on November 5, 1985, concerning the licensee's health physics practice The results of the review are presented belo Allegation The alleger stated that scrap steel from inside Unit 1 was being transported in uncovered containers and stored inside a " roped off area" in the Unit 2 Fuel Handling Building, and that employees in the area had not had NGET training and were not issued film badges. According to the alleger, employees could get contaminated from the scrap steel and exit the site through the unmonitored construction gat Discussion The scrap steel from Unit 1 was contaminated with low level fixed activit Since the contamination was not " removable", it did not pose a contamination hazard to workers, nor were the direct radiation levels high enough to require " Radiation Area" posting. It was stored in a roped off area normally used for the short term storage of bags of used protective clothing prior to placing them inside the Hydro Nuclear laundry traile The roped off area and the trailer which have since been removed, were properly posted with " Caution Radioactive Material" and " Authorized Personnel Only, RWP Needed for Entry", signs. According to the licensee the steel was stored in the roped off area, under the direct surveillance of a security guard, for only a few days and then it was moved to a locked caged area on the mezzanine level of the Fuel Handling Building. Since the Unit 2 Fuel Handling Building was an unrestricted area and access to the radioactive material was controlled by rope, signs, and a security guard, NGET training of workers frequenting the Unit 2 Fuel Handling Buildings was not require While the alleger was correct in his assertions concerning the transporta-tion and storage of contaminated scrap steel in the Unit 2 Fuel Handing Building, the allegation that workers could get contaminated from the steel was not substantiate Allegation The alleger was concerned that bags of radioactive waste reading 10 to 30 mr/hr were moved through the construction portal, 401' elevation, between the turbine building and the auxiliary building, while workers were also using the portal for exit. The alleger thought the bags might rupture and contaminate people nearb ,
. _ _ - _ _ - - ~ -~ - - - - - - -- - .
<
Discussion According to the licensee, plastic bags of radioactive waste and contaminated clothing were transported through the construction portal, on the 401' '
elevation, in the early days of operation.. However, for the past several months, all transfers of radioactive material through this access point have been made in fully enclosed cart Although there may have been a remote possibility of contamination being. spread by rupture of the plastic bags, the use of plastic bags is not contrary to regulatory requirements. Nevertheless, this practice has been eliminated by the licensee. No radiation safety concerns or regulatory problems were identified since all persons frequenting the area are required to have NGET training and must pass through a portal monitor or a frisking station prior to leaving the sit Allegation The alleger stated that radioactive spills had occurred inside the turbine building and that it was possible to spread contamination because there was no monitoring at the turbine building porta Discussion The licensee has:a routine program for surveying the turbine buildin If areas of contamination are found they are either decontaminated or roped off and posted. The inspectors observed one such area in the turbine building. All persons frequenting the turbine building are required to have NGET training. All persons exiting the turbine building must either pass through a frisking station or exit through the guard house portal monitor r The licensee's efforts to identify and control possible contaminated ;
areas in the turbine building combined with frisker stations and portal monitors for contamination detection was found to be an acceptable method for control of potential contamination in this area. The allegation was not substantiate . Outage Planning The inspectors also reviewed the licensee's outage planning and preparation activitie The following measures were take ;
- The number of onsite contractor HP technicians for outage coverage was almost double Before job assignments, these technicians spent :
one week in training on station radiation protection procedure * General areas of containment were decontaminated immediately after shutdown, before job activities commenced.- !
- -The Rad / Chem Department was represented at outage planning session ,
A rad / chem outage coordinator was assigned to review RWPs and outage activitie _ _ _ _ _ _ _ - _ - _ _ .
.
- The lead RCT foreman reemphasized the importance of good health physics practices and RWP conformance at station departmental meetings before the outag * Additional respiratory protection equipment and anti contamination clothing were ordered. Additional laundry support was contracted for the outag i No violations or deviations were identifie . Unit 2 Contamination On November 19, 1985, the licensee identified a contamination and radiation area in a portion of the Unit 2 auxiliary building which is not radiologically controlled. This contamination was identified during a routine survey. The OC radwaste evaporator filter skids in the electrical penetration area of the 414' level had smearable contamination levels of 2,500 dpm/100cm2 and a maximum direct contact reading of 20 mR/h Contamination and direct levels were primarily confined to the filters, not the general areas of the room. The licensee took the following access / contamination control measures: (1) the area was secured and properly posted; (2) a posted security guard restricted access to NGET trained individuals with appropriate dosimetry; (3) a step-off pad and frisker were set up at the room's only access point such that all individuals must monitor themselves before exiting; (4) the contaminated OC evaporator filters were changed and the area decontaminate Investigative surveys of Unit 2 tool cribs and general areas did not j indicate contamination migration to other uncontrolled areas. According l
"
to a listing of licensee work requests, no specific work was conducted on the OC radwaste filters. Licensee representatives stated the RCT noted slightly elevated readings around the filters during the previous week's i routine survey and alerted the RCT foreman. No action was taken at that time because the foreman did not recognize that the electrical penetration
'
area was in the unprotected area. Rad / Chem management discussed this matter individually with the involved foreman and collectively with the other foremen and RCTs, emphasizing the need to recognize unusual radiological f conditions in any area and especially in the unprotected are To prevent future occurrences, the licensee and contractors made an evaluation of other Unit 2 areas to determihe the potential for contamination occurrences. An expanded routine survey program of areas with the above potential has been implemented. A memo from the Rad / Chem Supervisor instructs startup testing personnel to notify the Rad / Chem Department of any test or work activities with crossover systems that may introduce contamination potential. This will be reviewed in future inspections (0 pen Item 50-455/85041-02).
No violations or deviations were identifie . Resin Transfer The licensee notified the NRC on August 15, 1985, that low level contami-nated resins had been transferred to two non-licensed vendors via an 11 ..
_ - _ _ _ _ _ _ _
_ . -_ ____ _ ___
,
.
unmonitored release pathway. These resins were shipped offsite to be regenerated. In both cases the following actions were taken and findings verified: (1) licensee and NRC representatives were dispatched to the vendor facilities; (2) representative samples collected by both NRC and licensee representatives indicated resin concentrations were less than
those specified by 10 CFR 20, Appendix B, for liquid release to unrestricted areas; (3) resins and associated sludge were returned to the Byron site; and (4) no detectable contamination remained at the two vendor facilitie The first case involved slightly contaminated Unit 2 flushing demineralizer resins that were identified during a non-routine survey of a resin filte No contamination source has been identifie The licensee discontinued shipment of Unit 2 flushing resins until October 2, 198 Since then, seven shipments have been made under a surveillance program that requires representative sampling and isotopic analysis of resins before shipment; resin with detectable contamination remains onsite. The inspector verified these levels by record review of resin samples. A gross cleanup system is onsite to reduce contamination levels of resin before transfer to the vendo The second case involved Unit 1 condensate polished demineralizer resins (secondary side) that were identified during an expanded licensee monitoring program as followup to the Unit 2 resin discovery. Again, no contamination source was identified. Some resin had been processed by the vendor; however the waste water released to the sanitary sewer would have been less than 10 CFR 20 limits for unrestricted releases and did not pose a public health or safety problem. The licensee no longer regenerates these resins; instead upon resin exhaustion, they are shipped out as radwast No violations or deviations were identifie . Unit 2 Preoperations The inspectors reviewed the status of radiation monitors exclusive to Unit 2 operations. According to licensee representatives, parts are currently on order for most Unit 2 monitors to replace parts needed to repair Unit 1 monitors. No preoperational testing has been conducte Common radiation protection facilities, procedures, and staff serve both units. These topics have been previously reviewed in conjunction with Unit 1 preoperational inspectio No violations or deviations were identifie . I&E Information Notices The inspectors reviewed licensee responses to the following selected l
I&E Information Notices:
- I&E Notice 85-42: Loose Phosphor in Panasonic 800 Series TLD The licensee has procedures for visual inspection of Panasonic l
UD 802 badges when incorporated into the dosimetry progra All i
'
l
_______
.
badges failing the station's acceptance criteria will be returned to the vendo (Byron Letter 85-1116).
- I&E Notice 85-43: Radiography Events at Power Reactor No licensee procedures specifically address radiography activitie Contract radiographers must comply with station radiation protectivn procedure (Byron Letter 85-1152).
No violations or deviations were identifie . Exit Meeting The inspectors met with licensee representatives (denoted in Section 1)
at the conclusion of the inspection on December 5, 1985. The scope and findings of the inspection were summarized. Tiic inspectors also discussed the likely information content of the inspection repcrt. with regard to documents and processes reviewed during the inspection. The licensee identified no such documents / processes as proprietary. In response to certain items discussed by the inspectors the license: Acknowledged the inspectors comments concerning the positive effects of strong management support of the radiation protection program and the need to continue that suppor Agreed to include systems training in the continuing RCT training sessions (Section 5). Will continue to review ROR 85-35 and evaluate potential for contamination in the uncontrolled area (Sections 10 and 14).
1 Monthly NRC Briefing At the December 18, 1985 monthly NRC briefing, the licensee summarized the status of their program for improving the plants' radiation protection performance. A licensee task force has been established to respond to recommendations for radiation protection improvements from a corporate (CECO) assessment performed in July 1985 in response to previously documented NRC findings, and an INP0 evaluation performed in August 1985. Thirty-nine of the forty recommendations from the corporate assessment were reported to have been completed; three of the seven INP0 findings were reported to have been completed. Three of the eight additional action items generated by the task force itself were reported to have been completed. Licensee efforts to complete the remaining items were reported to be continuing, with most remaining items due for completion in early 198 The licensee's efforts to identify and correct radiation protection program weaknesses is commendable; these efforts appear reflective of significant improvement in management support for the radiation protection progra Additional items discussed in the December 18, 1985 monthly NRC briefing, including meeting attendees, are documented in NRC Inspection Report No. 50-454/85053(DRP),