IR 05000455/1985045

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Noncompliance Noted in Insp Rept 50-455/85-45. Classification of Violation as Severity Level IV Appropriate & Will Remain
ML20153E605
Person / Time
Site: Byron 
Issue date: 02/19/1986
From: Paperiello C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20153E607 List:
References
NUDOCS 8602250075
Download: ML20153E605 (2)


Text

9 (

FEB 191986 Docket No. 50-455 Commonwealth Edison Company ATTN: Mr. Cordell Reed Vice President Posc Office Box 767 Chicago, IL 60690 Gentlemen:

Thank you for your letter dated January 27, 1986, infonning us of the steps you have taken to correct the noncompliance which we brought to your attention in our letter dated December 27, 1985. With regard to your request to consider reclassifying the violation as Severity Level V, we a5ree with your point that the fact that the test procedure in question had not yet been performed would tend to indicate minor significance. However, as was pointed out on Page 6 of the inspection report, your performance of this same test, Safety Injection Flow Balance, on Unit 1, experienced considerable difficulty in this same area, pump flow curves. Since the Unit I test was used to develop the Unit 2 procedure, we would have expected extra care to have been devoted to this test for Unit 2.

Discovery by our inspectors of the incorrect pump curves in this test indicates to us that extra care was certainly not devoted to develop-ment of this test and calls in question the quality of the initial review process. Accordingly, we believe the classification of Severity Level IV to be appropriate. With regard to your corrective actions, we will examine these matters in a subsequent inspection.

Your cooperation with us is appreciated.

Sincerely,

.

Carl

. Pape iello, Director Division of Reactor Safety See Attached Distribution e60225oo75 e60219 ADOCK O

gDR

<

Ik

-

-

Seer

}

.;

'I FEB 191986 Comonwealth Edison Company

Distribution cc:

D. L. Farrar, Director of Nuclear Licensing V. I. Schlosser, Project Manager Gunner Sorensen, Site Project Superintendent R. E. Querio, Plant Manager cc w/ ltr dtd 01/27/86:

DCS/RSB (RIDS)

Licensing Fee Management Branch Resident Inspector, RIII Byron Resident Inspector, RIII Braidwood Phyllis Dunten, Attorney General's Office, Environmental Control Division D. W. Cassel, Jr., Esq.

Diane Chavez, DAARE/ SAFE Steve Lewis, ELD L. Olshan, LPM, NRR H. S. Taylor, Qtality Assurance Division RIII RI I RIII RIII

%?/a'

RF(d Ring /jk Ha rison F rn y Warnick r ello 02/19/86 02/6/86 02//r/86 02/l?/86 02ff/86

)