ust 30, 2019

SUBJECT:

UPDATED INSPECTION PLAN FOR GRAND GULF NUCLEAR STATION, REPORT 05000416/2019005

Dear Mr. Larson:

The enclosed inspection plan lists the inspections scheduled through June 30, 2021, for Grand Gulf Nuclear Station. The U.S. Nuclear Regulatory Commission (NRC) provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues.

Routine inspections performed by resident inspectors are not included in the inspection plan.

You should be aware that the agency is pursuing potential changes to the Reactor Oversight Process (ROP) including changes to engineering inspections (SECY-18-0113, Recommendations for Modifying the Reactor Oversight Process Engineering Inspections), and other changes to the baseline inspection program described in SECY-19-0067, Recommendations for Enhancing the Reactor Oversight Process. Should these changes to the ROP be implemented, the engineering and other region-based inspections are subject to change in scope, as well as schedule, beginning in January 2020. The inspections listed during the last 12 months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

As discussed in the 2018 annual assessment letter dated March 4, 2019 (ADAMS Accession No. ML19064A731), the NRC determined the performance at Grand Gulf Nuclear Station to be in the Regulatory Response Column (Column 2) of the Reactor Oversight Process Action Matrix beginning the third quarter of 2018. Therefore, the NRC plans to conduct a supplemental inspection in accordance with Inspection Procedure 95001, Supplemental Inspection Response to Action Matrix Column 2 Inputs. The objectives of the supplemental inspection are: (1) to assure that the root causes and contributing causes of significant performance issues are understood, (2) to independently assess and assure that the extent of condition and extent of cause of significant performance issues are identified, (3) to assure that corrective actions taken to address and preclude repetition of significant performance issues are prompt and effective, and (4) to assure that corrective plans direct prompt actions to effectively address and preclude repetition of significant performance issues. This inspection commenced during the week of August 26, 2019. From December 9, 2016, through August 14, 2019, the NRC issued 11 Severity Level IV traditional enforcement violations associated with impeding the regulatory process. In April of 2019, the NRC conducted an inspection to assess your evaluations and corrective actions associated with these issues using Inspection Procedure 92723, Follow Up Inspection for Three or More Severity Level IV Traditional Enforcement Violations in the Same Area in a 12-Month Period. Based on the results of this inspection that are documented in NRC Integrated Inspection Report 05000416/2019002 (ADAMS Accession No. ML19226A236) the NRC was not able to conclude that the actions taken were adequate to meet the inspection objectives.

Therefore, the NRC plans to perform an additional inspection that will be scheduled after you notify the NRC of your readiness.

On March 12, 2018, the NRC issued a Confirmatory Order (ADAMS Accession No.

ML18072A191) (EA-17-132 and EA-17-153) to the Entergy fleet that included Grand Gulf Nuclear Station. The NRC plans to conduct a Confirmatory Order follow-up inspection at Entergy Corporate Headquarters in Jackson, MS, of the Confirmatory Order actions required to be completed by the end of calendar year 2019, in accordance with Inspection Procedure 92702, Followup on Traditional Enforcement Actions Including Violations, Deviations, Confirmatory Action Letters, Confirmatory Orders, And Alternative Dispute Resolution Confirmatory Orders. This inspection will be conducted during the first quarter of 2020 on a date to be determined by the NRC and Entergy.

In the 2018 annual assessment letter, the NRC identified a cross-cutting theme in the Human Performance area. Specifically, 20 findings had a cross-cutting aspect in this area during the 2018 end-of-cycle assessment period. Because this theme criterion is no longer met as of the assessment period ending on June 30, 2019, the NRC has determined that a cross-cutting theme in the Human Performance area no longer exists.

In accordance with Title 10 of the Code of Federal Regulations (CFR) 2.390 of the NRCs Agency Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at (817) 200-1250 with any questions you have regarding this letter.

Sincerely,

/RA/

Cale H. Young, Acting Chief Project Branch C Division of Reactor Projects Docket No. 50-416 License No. NPF-29 Enclosure:

Inspection Plan

ML19234A356 SUNSI Review ADAMS: Non-Publicly Available Non-Sensitive Keyword:

By: DLP Yes No Publicly Available Sensitive OFFICE PBC:SPE PBC:C NAME DProulx CYoung SIGNATURE /RA/ /RA/

DATE 08/21/19 08/30/19

IP 22 Inspection Activity Plan Report 07200050 - Grand Gulf (ISFSI)

07/01/2019 - 06/30/2021 Unit Start End Activity CAC Title Staff Count Grand Gulf Loading Inspection (one week in month) 2 1 08/01/2019 10/31/2019 IP 60855 001001 Operation Of An ISFSI 1 08/01/2019 10/31/2019 IP 60857 001004 Review of 10 CFR 72.48 Evaluations This report does not include INPO and OUTAGE activities. Page 1 of 4 This report shows only on-site and announced inspection procedures.

8/23/2019 9:52:37 AM

IP 22 Inspection Activity Plan Report Grand Gulf 07/01/2019 - 06/30/2021 Unit Start End Activity CAC Title Staff Count 95001 Supplemental Inspection - 2 White PIs 4 1 07/08/2019 10/25/2019 IP 71152 000748 Problem Identification and Resolution 1 07/08/2019 11/25/2019 IP 71153 000749 Followup of Events and Notices of Enforcement Discretion 1 07/08/2019 10/11/2019 IP 95001 000938 Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area GG 2019 BRQ 2 1 08/11/2019 08/17/2019 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance GRAND GULF DBA PROGRAM EQ INSPECTION 3 1 09/09/2019 09/27/2019 IP 71111.21N 000714 Design Bases Assurance Inspection (Programs)

Security Protective Strategy .05 2 1 09/09/2019 09/20/2019 IP 71130.05 000737 Protective Strategy Evaluation RP INSPECTION (1,3) 2 1 09/30/2019 10/04/2019 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1 09/30/2019 10/04/2019 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation GG ENTERGY CO FOLLOWUP - 2 3 1 12/01/2019 03/31/2020 IP 92702 CONF 001581 Enforcement Related Order Follow-Up-Only GG 2020 INITIAL EXAM 1 4 1 01/05/2020 01/11/2020 OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

1 02/02/2020 02/08/2020 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)

Biennial PI&R Inspection 4 1 01/13/2020 01/17/2020 IP 71152B 000747 Problem Identification and Resolution 1 01/27/2020 01/31/2020 IP 71152B 000747 Problem Identification and Resolution Inservice Inspection RF22 - GG 1 1 03/02/2020 03/06/2020 IP 71111.08G 000701 Inservice Inspection Activities (BWR)

RS12PI Radiation Safety 2 1 03/02/2020 03/06/2020 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1 03/02/2020 03/06/2020 IP 71124.02 000726 Occupational ALARA Planning and Controls This report does not include INPO and OUTAGE activities. Page 2 of 4 This report shows only on-site and announced inspection procedures.

8/23/2019 9:52:37 AM

IP 22 Inspection Activity Plan Report Grand Gulf 07/01/2019 - 06/30/2021 Unit Start End Activity CAC Title Staff Count Security Access Control .02 1 1 06/15/2020 06/19/2020 IP 71130.02 000734 Access Control 1 06/15/2020 06/19/2020 IP 71151 001338 Performance Indicator Verification Security Equipment .04 and Training .07 2 1 07/20/2020 07/24/2020 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 1 07/20/2020 07/24/2020 IP 71130.07 000739 Security Training Fire Protection Inspection - GG 3 1 08/10/2020 08/14/2020 IP 71111.21N.05 Fire Protection Team Inspection (FPTI)

1 08/24/2020 08/28/2020 IP 71111.21N.05 Fire Protection Team Inspection (FPTI)

GG 2020 INITIAL EXAM 2 0 1 09/13/2020 09/19/2020 OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

1 10/18/2020 10/24/2020 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)

Grand Gulf 1 - Design Bases Assurance Inspection (Teams) 6 1 09/21/2020 10/09/2020 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)

EP Program Inspection 1 1 11/16/2020 11/20/2020 IP 71114.02 000717 Alert and Notification System Testing 1 11/16/2020 11/20/2020 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 1 11/16/2020 11/20/2020 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1 11/16/2020 11/20/2020 IP 71114.05 000720 Maintenance of Emergency Preparedness 1 11/16/2020 11/20/2020 IP 71151 001397 Performance Indicator Verification RS5678 Radiation Safety PS Team 4 1 11/16/2020 11/20/2020 IP 71124.05 000729 Radiation Monitoring Instrumentation 1 11/16/2020 11/20/2020 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment 1 11/16/2020 11/20/2020 IP 71124.07 000731 Radiological Environmental Monitoring Program 1 11/16/2020 11/20/2020 IP 71124.08 000732 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation MC&A - Material Control & Accounting 1 1 11/16/2020 11/20/2020 IP 71130.11 000742 Material Control and Accounting (MC&A)

This report does not include INPO and OUTAGE activities. Page 3 of 4 This report shows only on-site and announced inspection procedures.

8/23/2019 9:52:37 AM

IP 22 Inspection Activity Plan Report Grand Gulf 07/01/2019 - 06/30/2021 Unit Start End Activity CAC Title Staff Count RP 2,4 2 1 02/15/2021 02/19/2021 IP 71124.02 000726 Occupational ALARA Planning and Controls 1 02/15/2021 02/19/2021 IP 71124.04 000728 Occupational Dose Assessment Security FFD .08 1 1 02/22/2021 02/26/2021 IP 71130.08 000740 Fitness For Duty Program EP Exercise and PI Inspection 4 1 03/15/2021 03/19/2021 IP 71114.01 000716 Exercise Evaluation 1 03/15/2021 03/19/2021 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1 03/15/2021 03/19/2021 IP 71151 001397 Performance Indicator Verification FORCE-ON-FORCE PLANNING & EXERCISE 5 1 04/12/2021 04/16/2021 IP 71130.03 000735 Contingency Response - Force-On-Force Testing 1 05/03/2021 05/07/2021 IP 71130.03 000735 Contingency Response - Force-On-Force Testing RP 1,3,PI 2 1 04/19/2021 04/23/2021 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1 04/19/2021 04/23/2021 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 50.59 Inspection 17T - Grand Gulf 3 1 05/17/2021 05/21/2021 IP 71111.17T 000709 Evaluations of Changes, Tests, and Experiments Security Access Authorization .01 and Access Control .02 w/PIV 2 1 05/17/2021 05/21/2021 IP 71130.01 000733 Access Authorization 1 05/17/2021 05/21/2021 IP 71130.02 000734 Access Control 1 05/17/2021 05/21/2021 IP 71151 001338 Performance Indicator Verification This report does not include INPO and OUTAGE activities. Page 4 of 4 This report shows only on-site and announced inspection procedures.

8/23/2019 9:52:37 AM