August 31, 2018

SUBJECT:

UPDATED INSPECTON PLAN FOR GRAND GULF NUCLEAR STATION

(REPORT 05000416/2018005)

Dear Mr. Larson:

The enclosed inspection plan lists the inspections scheduled through June 30, 2020, for Grand Gulf Nuclear Station. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

As discussed in the 2018 annual assessment letter (ADAMS Accession No. ML18057B123),

dated March 1, 2018, as well as NRC Inspection Report 05000416/2016007 (ADAMS Accession No. ML18134A007), dated May 14, 2018, the NRC plans to conduct one or more inspections in accordance with Inspection Procedure 92723, Follow Up Inspection for Three or More Severity Level IV Traditional Enforcement Violations in the Same Area in a 12-Month Period, to follow up on your action to address multiple Severity Level IV traditional enforcement violations issued since December 2016 in the area of impeding the regulatory process. These inspections will be scheduled after you notify the NRC of your readiness.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 817-200-1144 with any questions you have regarding this letter.

Sincerely,

/RA/

Jason W. Kozal, Chief Project Branch C

Division of Reactor Projects Docket No. 50-416 License No. NPF-29

Enclosure:

Inspection Plan

Grand Gulf 08/01/2018 - 06/30/2020 Unit Start End Activity CAC Title Staff Count FORCE-ON-FORCE PLANNING & EXERCISE WEEK

1 08/13/2018 08/17/2018 IP 71130.03 000735 Contingency Response - Force-On-Force Testing SECURITY TEAM INSPECTION

1 10/15/2018 10/19/2018 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance

10/15/2018 10/19/2018 IP 71130.07 000739 Security Training BIENNIAL PI&R

1 10/22/2018 10/26/2018 IP 71152B 000747 Problem Identification and Resolution

11/05/2018 11/09/2018 IP 71152B 000747 Problem Identification and Resolution EP PROGRAM INSPECTION

1 11/05/2018 11/09/2018 IP 71114.02 000717 Alert and Notification System Testing

11/05/2018 11/09/2018 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System

11/05/2018 11/09/2018 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes

11/05/2018 11/09/2018 IP 71114.05 000720 Correction of Emergency Preparedness Weaknesses and Deficiencies

11/05/2018 11/09/2018 IP 71151 001397 Performance Indicator Verification RAD SAFETY TEAM 5,6,7,8

1 11/26/2018 11/30/2018 IP 71124.05 000729 Radiation Monitoring Instrumentation

11/26/2018 11/30/2018 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment

11/26/2018 11/30/2018 IP 71124.07 000731 Radiological Environmental Monitoring Program

11/26/2018 11/30/2018 IP 71124.08 000732 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation GG 50.59 CHANGES, TESTS, EXPERIMENTS

1 12/10/2018 12/14/2018 IP 71111.17T 000709 Evaluations of Changes, Tests, and Experiments TI 2515/194

1 01/07/2019 01/11/2019 TI 2515/194 000512 Inspection of the Licensees Implementation of Industry Initiative Associated With the Open Phase Condition Design Vulnerabilities In Electric Power Systems (NRC Bulletin 2012-01)

Security Access Control.02

1 01/07/2019 01/11/2019 IP 71130.02 000734 Access Control

01/07/2019 01/11/2019 IP 71151 001338 Performance Indicator Verification 8/22/2018 7:57:26 AM Page 1 of 3 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

IP 22 Inspection Activity Plan Report Enclosure

Grand Gulf 08/01/2018 - 06/30/2020 Unit Start End Activity CAC Title Staff Count RP INSPECTION (2,4)

1 02/25/2019 03/01/2019 IP 71124.02 000726 Occupational ALARA Planning and Controls

02/25/2019 03/01/2019 IP 71124.04 000729 Occupational Dose Assessment EP EXERCISE INSPECTION

1 03/11/2019 03/15/2019 IP 71114.01 000716 Exercise Evaluation

03/11/2019 03/15/2019 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes

03/11/2019 03/15/2019 IP 71151 001397 Performance Indicator Verification CYBER SECURITY INSPECTION

1 04/29/2019 05/03/2019 IP 71130.10P 000741 Cyber Security

05/13/2019 05/17/2019 IP 71130.10P 000741 Cyber Security GRAND GULF HEAT SINK INSPECTION

1 06/17/2019 06/21/2019 IP 71111.07T 000700 Heat Sink Performance -Triennial BRQ

1 08/11/2019 08/17/2019 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance (Biennial)

GRAND GULF DBA PROGRAM EQ INSPECTION

1 09/09/2019 09/27/2019 IP 71111.21N 000714 Design Bases Assurance Inspection (Programs)

RP INSPECTION (1,3)

1 09/30/2019 10/04/2019 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls

09/30/2019 10/04/2019 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation Security Protective Strategy.05

1 09/30/2019 10/04/2019 IP 71130.05 000737 Protective Strategy Evaluation INITIAL EXAM 1

1 01/05/2020 01/11/2020 OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

02/02/2020 02/08/2020 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)

RS12PI Radiation Safety

1 03/02/2020 03/06/2020 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls

03/02/2020 03/06/2020 IP 71124.02 000726 Occupational ALARA Planning and Controls 8/22/2018 7:57:26 AM Page 2 of 3 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

IP 22 Inspection Activity Plan Report

Grand Gulf 08/01/2018 - 06/30/2020 Unit Start End Activity CAC Title Staff Count Triennial Fire Protection Inspection

1 04/20/2020 04/24/2020 IP 71111.05T 000696 Fire Protection (Triennial)

05/04/2020 05/08/2020 IP 71111.05T 000696 Fire Protection (Triennial)

8/22/2018 7:57:26 AM Page 3 of 3 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

IP 22 Inspection Activity Plan Report

ML18234A094 SUNSI Review ADAMS:

Non-Publicly Available Non-Sensitive Keyword:

By: CHY/RDR Yes No Publicly Available Sensitive NRC-002 OFFICE C:DRP/C

NAME JKozal

SIGNATURE

/RA/

DATE 8/23/18