May 12, 2025

SUBJECT:

WATERFORD STEAM ELECTRIC STATION - INTEGRATED INSPECTION REPORT 05000382/2025001

Dear Joseph Sullivan:

On March 31, 2025, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Waterford Steam Electric Station. On April 21, 2025, the NRC inspectors discussed the results of this inspection with David Oertling, General Manager of Plant Operations, and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, John L. Dixon, Jr., Chief Reactor Projects Branch D Division of Operating Reactor Safety Docket No. 05000382 License No. NPF-38

Enclosure:

As stated

Inspection Report

Docket Number:

05000382

License Number:

NPF-38

Report Number:

05000382/2025001

Enterprise Identifier:

I-2025-001-0003

Licensee:

Entergy Operations Inc.

Facility:

Waterford Steam Electric Station

Location:

Killona, LA

Inspection Dates:

January 1, 2025, to March 31, 2025

Inspectors:

K. Chambliss, Senior Resident Inspector

K. Cook-Smith, Resident Inspector

Approved By:

John L. Dixon, Jr., Chief

Reactor Projects Branch D

Division of Operating Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Waterford Steam Electric Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

PLANT STATUS

Unit 3 operated at or near 94 percent rated thermal for the entire inspection period.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed activities described in IMC 2515, Appendix D, Plant Status, observed risk-significant activities, and completed on-site portions of IPs. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.01 - Adverse Weather Protection

Impending Severe Weather Sample (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated the adequacy of the overall preparations to protect risk-significant systems from impending severe weather due to severe winter storm conditions on January 30, 2025.

71111.04 - Equipment Alignment

Partial Walkdown Sample (IP Section 03.01) (1 Sample)

The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:

(1)emergency diesel generator train B during extended emergency diesel generator A maintenance window on March 28, 2025

71111.05 - Fire Protection

Fire Area Walkdown and Inspection Sample (IP Section 03.01) (1 Sample)

The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:

(1)fire area RAB 7-001, elevation +35.00 feet relay room on January 15, 2024

Fire Brigade Drill Performance Sample (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated the onsite fire brigade training and performance during an unannounced fire drill on March 13, 2025.

71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)

(1) The inspectors observed and evaluated licensed operator examination scenario in the simulator on March 10, 2025.

71111.12 - Maintenance Effectiveness

Maintenance Effectiveness (IP Section 03.01) (3 Samples)

The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components (SSCs) remain capable of performing their intended function:

(1)reactor coolant maintenance rule function proposed return to (a)(2) status after completion of (a)(1) goals on March 27, 2025 (2)plant protection system maintenance rule scoping and (a)(2) status following component failures on March 28, 2025 (3)overall deviation tag use and deficient SSC tracking on March 31, 2025

71111.13 - Maintenance Risk Assessments and Emergent Work Control

Risk Assessment and Management Sample (IP Section 03.01) (5 Samples)

The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:

(1)elevated risk due to planned maintenance on startup transformer A on January 15, 2025 (2)elevated risk due to the failure of a plant protection system fuse that resulted in a half-trip configuration on January 24, 2025 (3)elevated risk due to planned maintenance on emergency diesel generator A on February 11, 2025 (4)elevated risk due to the discovery of no oil in startup transformer A bushing on March 30, 2025 (5)elevated risk due to planned maintenance of component cooling water and auxiliary component cooling water train B on March 31, 2025

71111.15 - Operability Determinations and Functionality Assessments

Operability Determination or Functionality Assessment (IP Section 03.01) (3 Samples)

The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:

(1)restoration of emergency diesel generator A missing linkage washers causing wearing of pivot arm on March 17, 2025 (2)wet cooling tower breaker thermography indicating differences between phases on March 20, 2025 (3)wet cooling tower fan 7A failure to start on March 27, 2025

71111.24 - Testing and Maintenance of Equipment Important to Risk

The inspectors evaluated the following testing and maintenance activities to verify system operability and/or functionality:

Post-Maintenance Testing (PMT) (IP Section 03.01) (3 Samples)

(1)auxiliary component cooling water train B pump discharge motor operated valve post maintenance testing on January 31, 2025 (2)emergency diesel generator A maintenance post maintenance testing following maintenance activities after a failed surveillance on March 5, 2025 (3)low-pressure safety injection pump A discharge flow control valve post maintenance testing following maintenance window on March 12, 2025

Surveillance Testing (IP Section 03.01) (3 Samples)

(1)high-pressure safety injection pump A operability verification on February 21, 2025 (2)component cooling water and auxiliary component cooling water train B pump and valve operability test on March 5, 2025 (3)emergency diesel generator A 24-hour surveillance run on March 12, 2025

Inservice Testing (IST) (IP Section 03.01) (1 Sample)

(1)containment spray pump train A inservice test on March 7, 2025

71114.06 - Drill Evaluation

Required Emergency Preparedness Drill (1 Sample)

(1) The inspectors evaluated an emergency preparedness drill involving a small break loss of coolant accident on March 18,

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:

IE01: Unplanned Scrams per 7000 Critical Hours Sample (IP Section 02.01)===

(1) Unit 3 (January 1 through December 31, 2024)

IE03: Unplanned Power Changes per 7000 Critical Hours Sample (IP Section 02.02) (1 Sample)

(1) Unit 3 (January 1 through December 31, 2024)

IE04: Unplanned Scrams with Complications (USwC) Sample (IP Section 02.03) (1 Sample)

(1) Unit 3 (January 1 through December 31, 2024)

71152A - Annual Follow-up Problem Identification and Resolution Annual Follow-up of Selected Issues (Section 03.03)

The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:

(1)follow-up on corrective actions and compliance restoration resulting from multiple non-cited violations concerning design control and corrective action program adverse condition identification issues related to steam supply valves to emergency feedwater pump turbines

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On April 21, 2025, the inspectors presented the integrated inspection results to David Oertling, General Manager of Plant Operations, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.01

Corrective Action

Documents

CR-WFE-YYYY-

NNNN

25-00207, 2025-00219

71111.01

Procedures

OP-901-521

Severe Weather and Flooding

344

71111.04

Corrective Action

Documents

CR-WF3-YYYY-

NNNN

24-00552, 2024-00845, 2024-01017, 2024-02319, 2024-

288, 2024-03290, 2025-00017, 2025-00200

71111.04

Procedures

ME-004-21

Emergency Diesel Generator

71111.04

Procedures

OP-902-002

Emergency Diesel Generator

2

71111.04

Procedures

OP-902-002

Emergency Diesel Generator

361

71111.05

Drawings

5817-6309

Reactor Auxiliary Building Relay Room Elevation +35 Multi-

Cycle System FP-M29

71111.05

Drawings

G1375

Fire Protection Reactor Auxiliary Building Plan Elevation +35

71111.05

Fire Plans

RAB 7-001

Relay Room

71111.05

Procedures

FP-001-019

Fire Brigade Equipment

313

71111.05

Procedures

FP-001-020

Fire Emergency/Fire Report

315

71111.05

Procedures

OP-009-004

Fire Protection

331

71111.11Q

Procedures

EN-OP-115

Conduct of Operations

71111.11Q

Procedures

OP-009-007

Plant Protection System

71111.11Q

Procedures

OP-901-110

Pressurizer Level Malfunction

71111.11Q

Procedures

OP-901-130

Reactor Coolant Pump Malfunction

71111.11Q

Procedures

OP-901-201

Steam Generator Level Control Malfunction

71111.11Q

Procedures

OP-901-512

Loss of Turbine Cooling Water

71111.11Q

Procedures

OP-902-002

Loss of Coolant Accident Recovery

71111.12

Corrective Action

Documents

CR-WF3-YYYY-

NNNN

21-07042, 2022-03722, 2024-01600, 2024-02494, 2025-

205, 2025-00229

71111.12

Procedures

EN-DC-150

Condition Monitoring of Maintenance Rule Structures

71111.12

Procedures

EN-DC-203

Maintenance Rule Program

71111.12

Procedures

EN-DC-204

Maintenance Rule Scope and Basis

71111.12

Procedures

EN-DC-205

Maintenance Rule Monitoring

71111.12

Procedures

EN-DC-206

Maintenance Rule (A)(1) Process

71111.12

Procedures

EN-FAP-OP-024

Operations Deviation Control Process

71111.12

Procedures

EN-OP-115-07

Configuration Control

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.12

Procedures

OP-100-009

Control of Valves and Breakers

71111.13

Corrective Action

Documents

CR-WF3-YYYY-

NNNN

24-1145, 2025-00205

71111.13

Procedures

EN-OM-132

Nuclear Risk Management Process

71111.13

Procedures

EN-OM-132

Nuclear Risk Management Process

71111.13

Procedures

EN-OP-119

Protected Equipment Postings

71111.13

Procedures

EN-OP-119

Protected Equipment Postings

71111.13

Procedures

OI-037-000

Operations Risk Assessment Guideline

2

71111.13

Procedures

OI-037-000

Operations Risk Assessment Guideline

23

71111.15

Corrective Action

Documents

CR-WF3-YYYY-

NNNN

21-00184, 2022-00163, 2025-00386, 2025-00444, 2025-

00530, 2025-00540, 2025-00872

71111.15

Miscellaneous

W3-DBD-004

Auxiliary Component Cooling Water

71111.15

Miscellaneous

W3-DBD-2

Emergency Diesel Generator and Automatic Load

Sequencer Design Basis Document

306

71111.15

Procedures

EN-OP-104

Operability Determination Process

71111.15

Work Orders

00542710, 54224230,

71111.24

Procedures

OP-009-002

Emergency Diesel Generator

2

71111.24

Procedures

OP-009-002

Emergency Diesel Generator

361

71111.24

Procedures

OP-009-002

Emergency Diesel Generator

360

71111.24

Procedures

OP-009-118

Primary Auxiliaries Quarterly IST Valve Tests

71111.24

Procedures

OP-902-121

Safety Systems Quarterly IST Valve Tests

71111.24

Procedures

OP-903-013

Monthly Channel Checks

71111.24

Procedures

OP-903-030

Safety Injection Pump Operability Verification

71111.24

Procedures

OP-903-050

Component Cooling Water and Auxiliary Component Cooling

Water Pump and Valve Operability Test

71111.24

Procedures

OP-903-068

Emergency Diesel Generator Operability and Subgroup

Relay Verification

27

71111.24

Procedures

OP-903-119

Secondary Auxiliaries Quarterly IST Valve Test

71111.24

Work Orders

5054130, 53030371, 54003565, 54005756, 54034338,

54154641, 54158213, 54211319, 54215929, 54241828

71114.06

Procedures

EN-EP-308

Emergency Planning Critiques

71114.06

Procedures

EN-EP-604

Emergency Classifications

71114.06

Procedures

EN-FAP-EP-013

Emergency Preparedness Program Maintenance

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71114.06

Procedures

EP-003-070

Emergency Preparedness Routine Tests and Checks

307

71151

Corrective Action

Documents

CR-WF3-YYYY-

NNNN

24-03830

71151

Procedures

EN-LI-114

Regulatory Performance Indicator Process

71151

Procedures

EN-LI-114

Regulatory Performance Indicator Process

71152A

Corrective Action

Documents

CR-WF3-YYYY-

NNNN

2017-6700, 2022-02645, 2022-06932, 2022-06957, 2022-

07091, 2022-07298, 2022-07300, 2023-15004

71152A

Procedures

EN-LI-102

Corrective Action Program

71152A

Work Orders

153070, 482181, 586705, 586708