May 12, 2025
SUBJECT:
WATERFORD STEAM ELECTRIC STATION - INTEGRATED INSPECTION REPORT 05000382/2025001
Dear Joseph Sullivan:
On March 31, 2025, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Waterford Steam Electric Station. On April 21, 2025, the NRC inspectors discussed the results of this inspection with David Oertling, General Manager of Plant Operations, and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, John L. Dixon, Jr., Chief Reactor Projects Branch D Division of Operating Reactor Safety Docket No. 05000382 License No. NPF-38
Enclosure:
As stated
Inspection Report
Docket Number:
05000382
License Number:
Report Number:
Enterprise Identifier:
I-2025-001-0003
Licensee:
Entergy Operations Inc.
Facility:
Waterford Steam Electric Station
Location:
Killona, LA
Inspection Dates:
January 1, 2025, to March 31, 2025
Inspectors:
K. Chambliss, Senior Resident Inspector
K. Cook-Smith, Resident Inspector
Approved By:
John L. Dixon, Jr., Chief
Reactor Projects Branch D
Division of Operating Reactor Safety
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Waterford Steam Electric Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
PLANT STATUS
Unit 3 operated at or near 94 percent rated thermal for the entire inspection period.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed activities described in IMC 2515, Appendix D, Plant Status, observed risk-significant activities, and completed on-site portions of IPs. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
REACTOR SAFETY
71111.01 - Adverse Weather Protection
Impending Severe Weather Sample (IP Section 03.02) (1 Sample)
- (1) The inspectors evaluated the adequacy of the overall preparations to protect risk-significant systems from impending severe weather due to severe winter storm conditions on January 30, 2025.
71111.04 - Equipment Alignment
Partial Walkdown Sample (IP Section 03.01) (1 Sample)
The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:
(1)emergency diesel generator train B during extended emergency diesel generator A maintenance window on March 28, 2025
71111.05 - Fire Protection
Fire Area Walkdown and Inspection Sample (IP Section 03.01) (1 Sample)
The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:
(1)fire area RAB 7-001, elevation +35.00 feet relay room on January 15, 2024
Fire Brigade Drill Performance Sample (IP Section 03.02) (1 Sample)
- (1) The inspectors evaluated the onsite fire brigade training and performance during an unannounced fire drill on March 13, 2025.
71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance
Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)
- (1) The inspectors observed and evaluated licensed operator examination scenario in the simulator on March 10, 2025.
71111.12 - Maintenance Effectiveness
Maintenance Effectiveness (IP Section 03.01) (3 Samples)
The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components (SSCs) remain capable of performing their intended function:
(1)reactor coolant maintenance rule function proposed return to (a)(2) status after completion of (a)(1) goals on March 27, 2025 (2)plant protection system maintenance rule scoping and (a)(2) status following component failures on March 28, 2025 (3)overall deviation tag use and deficient SSC tracking on March 31, 2025
71111.13 - Maintenance Risk Assessments and Emergent Work Control
Risk Assessment and Management Sample (IP Section 03.01) (5 Samples)
The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:
(1)elevated risk due to planned maintenance on startup transformer A on January 15, 2025 (2)elevated risk due to the failure of a plant protection system fuse that resulted in a half-trip configuration on January 24, 2025 (3)elevated risk due to planned maintenance on emergency diesel generator A on February 11, 2025 (4)elevated risk due to the discovery of no oil in startup transformer A bushing on March 30, 2025 (5)elevated risk due to planned maintenance of component cooling water and auxiliary component cooling water train B on March 31, 2025
71111.15 - Operability Determinations and Functionality Assessments
Operability Determination or Functionality Assessment (IP Section 03.01) (3 Samples)
The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:
(1)restoration of emergency diesel generator A missing linkage washers causing wearing of pivot arm on March 17, 2025 (2)wet cooling tower breaker thermography indicating differences between phases on March 20, 2025 (3)wet cooling tower fan 7A failure to start on March 27, 2025
71111.24 - Testing and Maintenance of Equipment Important to Risk
The inspectors evaluated the following testing and maintenance activities to verify system operability and/or functionality:
Post-Maintenance Testing (PMT) (IP Section 03.01) (3 Samples)
(1)auxiliary component cooling water train B pump discharge motor operated valve post maintenance testing on January 31, 2025 (2)emergency diesel generator A maintenance post maintenance testing following maintenance activities after a failed surveillance on March 5, 2025 (3)low-pressure safety injection pump A discharge flow control valve post maintenance testing following maintenance window on March 12, 2025
Surveillance Testing (IP Section 03.01) (3 Samples)
(1)high-pressure safety injection pump A operability verification on February 21, 2025 (2)component cooling water and auxiliary component cooling water train B pump and valve operability test on March 5, 2025 (3)emergency diesel generator A 24-hour surveillance run on March 12, 2025
Inservice Testing (IST) (IP Section 03.01) (1 Sample)
(1)containment spray pump train A inservice test on March 7, 2025
71114.06 - Drill Evaluation
Required Emergency Preparedness Drill (1 Sample)
- (1) The inspectors evaluated an emergency preparedness drill involving a small break loss of coolant accident on March 18,
OTHER ACTIVITIES - BASELINE
===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:
IE01: Unplanned Scrams per 7000 Critical Hours Sample (IP Section 02.01)===
- (1) Unit 3 (January 1 through December 31, 2024)
IE03: Unplanned Power Changes per 7000 Critical Hours Sample (IP Section 02.02) (1 Sample)
- (1) Unit 3 (January 1 through December 31, 2024)
IE04: Unplanned Scrams with Complications (USwC) Sample (IP Section 02.03) (1 Sample)
- (1) Unit 3 (January 1 through December 31, 2024)
71152A - Annual Follow-up Problem Identification and Resolution Annual Follow-up of Selected Issues (Section 03.03)
The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:
(1)follow-up on corrective actions and compliance restoration resulting from multiple non-cited violations concerning design control and corrective action program adverse condition identification issues related to steam supply valves to emergency feedwater pump turbines
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On April 21, 2025, the inspectors presented the integrated inspection results to David Oertling, General Manager of Plant Operations, and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Corrective Action
Documents
CR-WFE-YYYY-
NNNN
25-00207, 2025-00219
Procedures
OP-901-521
Severe Weather and Flooding
344
Corrective Action
Documents
CR-WF3-YYYY-
NNNN
24-00552, 2024-00845, 2024-01017, 2024-02319, 2024-
288, 2024-03290, 2025-00017, 2025-00200
Procedures
ME-004-21
Procedures
OP-902-002
2
Procedures
OP-902-002
361
Drawings
5817-6309
Reactor Auxiliary Building Relay Room Elevation +35 Multi-
Cycle System FP-M29
Drawings
G1375
Fire Protection Reactor Auxiliary Building Plan Elevation +35
Fire Plans
RAB 7-001
Relay Room
Procedures
Fire Brigade Equipment
313
Procedures
Fire Emergency/Fire Report
315
Procedures
OP-009-004
Fire Protection
331
Procedures
Conduct of Operations
Procedures
OP-009-007
Plant Protection System
Procedures
OP-901-110
Pressurizer Level Malfunction
Procedures
OP-901-130
Reactor Coolant Pump Malfunction
Procedures
OP-901-201
Steam Generator Level Control Malfunction
Procedures
OP-901-512
Loss of Turbine Cooling Water
Procedures
OP-902-002
Loss of Coolant Accident Recovery
Corrective Action
Documents
CR-WF3-YYYY-
NNNN
21-07042, 2022-03722, 2024-01600, 2024-02494, 2025-
205, 2025-00229
Procedures
Condition Monitoring of Maintenance Rule Structures
Procedures
Procedures
Maintenance Rule Scope and Basis
Procedures
Maintenance Rule Monitoring
Procedures
Maintenance Rule (A)(1) Process
Procedures
EN-FAP-OP-024
Operations Deviation Control Process
Procedures
EN-OP-115-07
Configuration Control
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Procedures
OP-100-009
Control of Valves and Breakers
Corrective Action
Documents
CR-WF3-YYYY-
NNNN
24-1145, 2025-00205
Procedures
Nuclear Risk Management Process
Procedures
Nuclear Risk Management Process
Procedures
Protected Equipment Postings
Procedures
Protected Equipment Postings
Procedures
OI-037-000
Operations Risk Assessment Guideline
2
Procedures
OI-037-000
Operations Risk Assessment Guideline
23
Corrective Action
Documents
CR-WF3-YYYY-
NNNN
21-00184, 2022-00163, 2025-00386, 2025-00444, 2025-
00530, 2025-00540, 2025-00872
Miscellaneous
W3-DBD-004
Auxiliary Component Cooling Water
Miscellaneous
W3-DBD-2
Emergency Diesel Generator and Automatic Load
Sequencer Design Basis Document
306
Procedures
Operability Determination Process
Work Orders
00542710, 54224230,
Procedures
OP-009-002
2
Procedures
OP-009-002
361
Procedures
OP-009-002
360
Procedures
OP-009-118
Primary Auxiliaries Quarterly IST Valve Tests
Procedures
OP-902-121
Safety Systems Quarterly IST Valve Tests
Procedures
OP-903-013
Monthly Channel Checks
Procedures
OP-903-030
Safety Injection Pump Operability Verification
Procedures
OP-903-050
Component Cooling Water and Auxiliary Component Cooling
Water Pump and Valve Operability Test
Procedures
OP-903-068
Emergency Diesel Generator Operability and Subgroup
Relay Verification
27
Procedures
OP-903-119
Secondary Auxiliaries Quarterly IST Valve Test
Work Orders
5054130, 53030371, 54003565, 54005756, 54034338,
54154641, 54158213, 54211319, 54215929, 54241828
Procedures
Emergency Planning Critiques
Procedures
Emergency Classifications
Procedures
EN-FAP-EP-013
Emergency Preparedness Program Maintenance
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Procedures
Emergency Preparedness Routine Tests and Checks
307
71151
Corrective Action
Documents
CR-WF3-YYYY-
NNNN
24-03830
71151
Procedures
Regulatory Performance Indicator Process
71151
Procedures
Regulatory Performance Indicator Process
Corrective Action
Documents
CR-WF3-YYYY-
NNNN
2017-6700, 2022-02645, 2022-06932, 2022-06957, 2022-
07091, 2022-07298, 2022-07300, 2023-15004
Procedures
Corrective Action Program
Work Orders
153070, 482181, 586705, 586708