IR 05000369/1987042

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-369/87-42 & 50-370/87-42.Regulations Addressed in Notice of Violation Should Have Been 10CFR50.73(a)(1) & (D) & (a)(2)(i)(b)
ML20150A975
Person / Time
Site: McGuire, Mcguire  
Issue date: 02/26/1988
From: Herdt A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Tucker H
DUKE POWER CO.
References
NUDOCS 8803160110
Download: ML20150A975 (1)


Text

F 666 pp,3 2 6 t

Duke Power Company ATTN: Mr. H. B. Tucker Vice President

'

Nuclear Production Department 422 South Church Street Charlotte, NC 28242

'

Gentlemen:

SUBJECT: REPORT NOS. 50-369/87-42 AND 50-370/87-42 Thank you for your response of February 15, 1988, to our Notice of Violation issued on January 15, 1988, concerning activities conducted at your McGuire facility. We have evaluated your response and found that it meets the require-ments of 10 CFR 2.201.

We will examine the implementation of your corrective actions during future inspections.

As you noted in your letter, the regulations addressed in our Notice of

Violation should have been 10 CFR 50.73(a)(1) and (d) and 10 CFR 50.73 (a)(2)

(1)(b). The reference to 10 CFR 50.73 (a)(e)(c) was -in error.

,

We appreciate your cooperation in this matter.

Sincerely, i

CRIGINAL SIGNED BY ALAN R. HERDT l

l

-

Alan R. Herdt, Chief

Engineering dranch

!

Division of Reactor Safety

,

!

!

cc-T. L. McConnell, Station Manager

Senior Resident Inspector i

Catawba

,

bec: NRC Resident Inspector DRS Technical Assistant

D. Hood, NRR Document Control Desk State of North Carolina

!

c RII RII RII

0 W, PB e e

ser FJap9 TPeebius 02/4/88 02/pt/8 02pr/88

,

8803160110 890226 i

PDR ADOCK 05000369

G peg ua