IR 05000369/1987018

From kanterella
Jump to navigation Jump to search
Partially Withheld Physical Security Insp Repts 50-369/87-18 & 50-370/87-18 on 870526-29 (Ref 10CFR2.790 & 73.21).Major Areas Inspected:Physical Security Plan & Implementing Procedures & Mgt Effectiveness
ML20216B487
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 06/17/1987
From: Mcguire D, Tillman A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20216B338 List:
References
50-369-87-18, 50-370-87-18, NUDOCS 8706300092
Download: ML20216B487 (1)


Text

SArt.GUAKDsINFOMvW W L

.

d

.

gn c rCg['lo UNITED STATES NUCLEAR REGULATORY COMMISSION

[\\.

R EGION 11 n

j 101 MARIETTA STREET, N.W.

  • .
  • i c

ATLANT A, GEORGI A 30323

%,.... +#

JUN 191987 l

Report Nos.:

50-369/87-16 and 50-370/87-18 Licensee:

Duke Power Company 422 South Church Street Charlotte, NC 28242 Docket Nos.:

50-369 and 50-370 License Nos.:

NPF-9 and NPF-17 Facility Name:

McGuire 1 and 2 Inspection Con ted-May 26-29-987 Inspector:

_,d@//4

/f8//

[s//.'s

A. ~l i m

'F iC'al Secu~rity inspector

'Dat ' Signed

_C'

6/7/[h Approved by:..

D. R.~McGuire Chief, Physical Security Section pate/ Signed r

Nuclear Materials Safety and Safeguards Branch Division of Radiation Safety and Safeguards

,

SUMMARY Scope:

This routine, unannounced physical security' inspection included a review and inspection of:

Physical Security ~ Plan and Implementing Procedures; Management Effectiveness - Security Program; Security Organization;ty Sy Security Program Audit; Records and Reports; Testing.and Maintenance; Securi Power Supply; Compensatory Measures; Access Control - Personnel; Access Control - Packages; and Communications.

Results:

No violations of regulatory requirements were identified in the 11 areas inspected, tucLosune W ys SArgcygp0 M "

B706300092 070619 PDR ADDCK 05000369 G

l PDR