ML19247A009
| ML19247A009 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 05/15/1979 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Clayton F ALABAMA POWER CO. |
| Shared Package | |
| ML19247A010 | List: |
| References | |
| NUDOCS 7907270036 | |
| Download: ML19247A009 (2) | |
See also: IR 05000364/1979008
Text
/ / C_
'
.
UNITED STATES
p arooq'o
NUCLEAR REGULATORY COMMISSION
.
- g
g
REGloN ll
y
p
g
g
"
<. E
e-
o.
E
[
ATLANTA, GEORGIA 30303
.....
In Reply Refer To:
MAY 151979
RII:AGW
50-364/79-08
Alabama Power Company
Attn:
F. L. Clayton, Jr.
Senior Vice President
,
Post Office Box 2641
Gentlemen:
This refers to the inspection conducted by A. G. Wagner of this office
on May 3-4, 1979 of activities authorized by NRC Construction Permit No.
CPPR-86 for the Farley facility, Unit 2, and to the discu -ion of our
findings held with W. Hairston at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in
the enclosed inspection report. Within these areas, the inspection
consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were
disclosed.
In accordance with Section 2.790 of the NRC's'" Rules of Practice",
Part 2, Title 10, Code of Federal Regulations, a copy of this letter and
the enclosed inspection report will be placed in the NRC's Public
Document Room.
If this report contains any information that you (or
your contractor) believe to be proprietary, it is necessary that you
make a written application within 20 days to this office to withhold
such information from public disclosure. Any such application must
include a full statement of the reasons on the basis of which it is
claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained
in a separate part of the document.
If we do not hear from you in this
regard within the specified period, the report will be placed in the
Public Document Room.
_
1
L
@
7907 27co%
,
'.
,
s
p RI
e1
4 c d'
UJ/
-
-
.
.
.
MAY 151979
Alabama Power Company
-2-
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Sincerely,
g.c.
p
R. C. Lewis, Acting Chief
Reactor Operations and
Nuclear Support Branch
Enclosure:
Inspection Report No. 50-364/79-08
cc w/ enclosure:
A. R. Barton
Executive Vice President
Post Office Box 2641
Birmingham, Alabama 35291
C. Biddinger, Jr.
Manager-Corporate Quality Assurance
Post Office Box 2641
Birmingham, Alabama 35291
R. E. Hollands, Jr.
QA Superviser
Post Office Box U
Ashford, Alabama 36312
i
.
.
YI.
'
422
000
-
.
,
.
..