IR 05000348/1980033
| ML19341B759 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 01/26/1981 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML19341B758 | List: |
| References | |
| 50-348-80-33, 50-364-80-45, NUDOCS 8102270413 | |
| Download: ML19341B759 (12) | |
Text
-
-.
..
-
.-.
--
_ _ _
_.
, _ _
..
. __ _ __
--
-
- p tro UNITED STATES l
p,
,
,
NUCLEAR REGULATORY COMMISSION i
g
.,.,
g g
c REGION 11
!
101 MARIETTA sT., N.W., sulTE 3100 o,
E ATLANTA, GEORGIA 30303
%,
o
.....
'
Report Nos.: 50-348/80-33 and 50-364/80-45 Licensee: Alabama Power Company 600 North 18th Street Birmingham, AL 35291 Facility Name: Farley 1 and 2
-
Docket Nos. 50-348 and 50-364 License No. NPF-2 and NPF-8 Meeting at Alabar.a Power Company's Corporate Offices, Birmingham, AL Attending Personnel: See Details Approved by:
[. [.
//M/8/
R.'C. Lewis /, Acting Chief, RONS Branch Date Signed SUMMARY Meeting conducted October 15, 1980 This special, announced management meeting was conducted to discuss the results of NRC's evaluation of Alabama Power Company's regulatory performance as con-cluded in the Systematic Assessment of Licensee Performance (SALP) program.
Results A summary of the licensee performance evaluation was presented. Areas of concern -
were discussed with corporate management. Alabama Power Company's performance is considered to be acceptable.
,
B102270C(
.
. -
-.
.-
.
-.
.
e DETAILS 1.
Personnel Attending Meeting Alabama Power Company F. Clayton, Jr., Senior Vice President R. Mcdonald, Vice President - Nuclear Generation H. Thrash, General Manager - Nuclear Generation O. Kingsley, Manager - Nuclear Engineering and Technical Support W. Hairston, Plant Manager J. McGowan, Manager Safety Analysis and Engineering Review
!
Nuclear Regulatory Commission i
F. J. Long, Acting Deputy Director, Region II R. C. Lewis, Acting Chief, RONS Branch, Region II
,
R. D. Martin, Chief, Reactor Projects Section 2, Region II
'
E. Reeves, Project Manager, Division of Licensing
<
i i
NRC Resident Inspector W. H. Bradford i
2.
Areas Discussed a.
A brief summary of the Systematic Assessment of Licensee Performance (SALP) program was presented to include the basis for the evaluation and
-
its purpose.
,
b.
The results of the SALP evaluation for Alabama Power Company (APCo)
were discussed.
APCO's performance to date is considered acceptable.
-
The SALP evaluations are contained in Enclosures 1 and 2 to this report.
Items of concern were discussed with corporate ma'nagement to include c.
those areas where the NRC considers additional licensee management attention may be warranted.
!
e
.
!
I
. SYSTEMATIC ASSESSMENT OF LICENSEE PERFOPOiANCE FOR FARLEY UNIT 1
,
M
~.. _
. - - _ - -. --
_ _. - - _
_.
_. _. - -
'.
-
1-1 i
Region II LICENSEE PERFORMANCE EVALUATION (OPERATIONS)
Facility: Farley 1 Licensee: Alabama Power Company Unit Identification:
Docket No.
License No./Date of Issuance Unit No.
50-348 NPF-2/ June 25,1977
1 i
Reactor Information Unit 1 i
I NSSS Westinghouse MWT 2652 Appraisal Period: May 1, 1979 through April 30, 1980. These dates were used to provide a comparable basis for all operating reactors in Region II. Significant events or enforcement items occurring after these dates were considered in arriving at the indicated conclusions.
!
l.
Appraisal Completion Date:
October 8, 1980
.
-Review Board Members:
W. H. Bradford, Senior Resident Inspector (contacted by telephone f or input on i
October 7, 1980)
R. C. Lewis - Acting Chief, RONS Branch
,
R. D. Martin, Section Chief, RPS #2 F. Jape, Acting for Project Coordinator E. A. Reeves, Licensing Project Manager, Unit 1
'
,
i
.
.
.
1-2 A.
Number and Nature of Noncompliance Items
!
l Noncompliance Category:
Unit 1 Violations
Infractions
Deficiencies
I
Areas of Noncompliance:
(List Areas as Required)
j Security
Health Physics
Quality Assurance
r Procedure Compliance
- Total Points
,
j Security and health physics were the major prob 1cm areas. Negative security findings were evident during both the March and December 1979 inspections as
.
were negative health physics findings in May and November. In both areas the
!
number and severity of the findings dr,:reased between subsequent inspections.
'
B.
Number and Nature of Licensee Event Reports Type of Events:
Ucit 1
'
Personnel Error
Design
{
Defective Procedures
l Component Failure
Other
'
.
'
Licensee Event Reports Reviewed: 79-14/03L through 80-25/03L Evaluation of the above tabulation:
t Adequate corrective action appears to have been taken in almost every case, however, there were instances in April, May and June 1980 of recurring events associated with diesel generator inadequat time response. These events occurred
.
in a post maintenance time period. No LERs on this type event have I
been reported since June 16, 1980.
C.
F: alated Enforcement Actions
Civil Penalties None
i Orders
!
None i
t i
(_
_ _.
.
.
.
1-3
,
Immediate Action Letters None D.
Management Conferences Held During Past Twelve Months None E.
Justification of Evaluations of Functional Areas Categorized as Requiring an Increese in Inspection Frequency / Scope (See Evaluation Sheets)
1.
Design Changes and Modifications During routine program inspecticas: increased emphasis will be placed in this area to assure that the licensee performs adequate evaluation, ftactional testing and documentation of all changes and modifications.
Noncompliances have been identified in this area in the past.
2.
Quality Control As Unit 2 approaches completion more demands are being made on the QA staff.
Increased emphasis will be placed in this area on Unit 1 to assure adequate inspections are still being conducted by site QA staff.
No major problems in the QA/QC areas have been identified.
The above two items will be covered during routine inspection.
No increase in program requirementr are warranted at this time.
F.
Comparison of Unit 1 With Unit 2 A comparison of Unit I (in operation) with Unit 2 (in pre-operational testing)
is not useful for the period of this evaluation.
As Unit 2 progresses through pre-operational testing (estimated completion early 1981) an appropriate com-parison will be available.
G.
Overall Evaluation The overall performance of licensed activities is above average.
Increased emphasis during the routine inspection program will be placed in the areas of design changes and quality control.
No increased inspection scope is required fer this facility at this time.
Good communications exist between the licensee, the NRR project manager, and Region II.
Appendix A - Functional Areas Appendix B - Action Plan (Internal Use Only)
J a
.
,
.
-- _. - - -
-,,
,-
._.
._-_
-
-.. -. - -. -..
~. -. -. -.
-..
-.
.-.-._.--.-
-.
_-
.
.
.
'
l APPENDIX A
1-A-1 FUNCTIONAL AREAS (Operations)
Inspection
Frequency and/or Scope i
FUNCTIONAL AREA Increase No Change Decrease
'
1.
Management Control X
!
2.
Plant Operations X
i 3.
Refueling Operations and Activities X
4.
Maintenance X
5.
Surveillance and Preoperational Testing X
i 6.
Training X
,
l 7.
Radiation Protection X
8.
Environmental Protection X
9.
Emergency Planning X
.
10.
Fire Protection X
.
11.
Security and Safeguards X
!
l 12.
Design Changes and Modifications X
i
.
l 13.
Repcrting '
X
!,
-14.
QA Audits X
i
'
15.
Committee Activities X
!
i l
16.
Quality Control X
17.
Procurement X
!
.
.
.
,JEF' <c:.
L
~
(BRANCH CHIEF)
.
//f/60
' (D' ATE)
j..
i h
-...
_.
-
.
_ _.
-
_.. _.. - _-..-..~.
. _
.-
,
.
4
Enclosure 2 t
,
.
f
.
SYSTE.MATIC ASSESSMENT OF LICENSEE PERFORMANCE r
FOR FAPJEY UNIT 2
.
_y-
, - - -
-.,
.v
.
-
-,
y
~3,
,++,
c
-
r--
--,,
S y
,
=.< -
. _ _
.
--
.
-
-
-
.___
-
-
, -
'
.
.
2-1
-
Region II LICENSEE PERFORMANCE EVALUATION (OPERATIONS)
i i
Facility:
Farley Unit 2
Licensee:
Alabama Power Company
.
%
Unit Identification:
,
Docket No.
License No./Date of Issuance Unit No.
50-364 NPF-8/ October 23, 1980
Reactor Information Unit 1
,
NSSS Westinghouse MWI-2652
'
Appraisal Period: April 1,1979 through March 30,1980. These dates were used to provide a comparable basis for all operating reactors in Region II. Significant events or enforcement items occurring after these dates were considered in arriving at the indicated conclusions.
Appraisal Completion Date:
October 8, 1980
-
,
!
'
Review Board Members:
,
R. C. Lewis ~- Acting Chief, RONS Branch R. Martin, Chief, Reactor Projects Section No. 2 L. Kintner, Licensing Project Manager (contacted by telephone for Input 10/8/80)
F. Jape, Acting Project Coordinator
,
-rvw-a--,a-p,m-+m-ww--e,e-grTr-tv--*
1-w re -* v t-*--
--ve--e-e i t ewt---e e
_--=
_.
. -
- -
-
-
._
-
'.
f
.
'
2-2 A.
Number and Nature of Noncompliance Items l
Noncompliance Category:
Unit 2
Violations
Infractions
Deficiencies
Areas of Noncompliance Unit 2 (Points)
Construction Drawing Control
Part 21 Evaluation Procedures
Total Points
B.
Number and Nature of Licensee Event Reports Two CDR's were submitted by the licensee during the period, one being the result of a Part 21 Report submitted by the NSSS supplier, and the other resulting from the misapplication of 2 valves. The resolution of these two items will be examined during forthcoming inspections.
C.
Escalated Enforcement Actions Civil Penalties
.None Orders-
'
None Immediate Action Letters None D.
Management Conferences Held During Past Twelve Moaths None
.
'.
.
-2-3 E
/
E.
Justificati6n of Evaluations of Functional Areas Categorized as Requiring an Increfse in Inspection Frequency / Scope (See Evaluation Sheets)
No change in program warranted.
F.
Comparison of Unit 1 With Unit 2 A comparison of Unit 2 (in pre-operational testing) with Unit 1 (in operation)
is not useful for the period of thic evaluation. As Unit 2 progresses through pre-operational testing (estimated completion early 1981) an appropriate com-parison will be available.
G.
Overall Evaluation Licensee performance for this period was acceptable and is above average for a Region II facility. The licensee has been responsive to NRC.irlings.
No increase in the inspection program frequency or scope is required for this facility at this time.
Appendix A - Functional Areas Appendix B - Action Plan (Internal Use Only)
!
'
.
~m
-
v-
,
e
~
-
n
's
.
APPENDIX A 2-A-1 FUNCTIONAL AREAS (Operations)
Inspection Frequency and/or Scope FUNCTIONAL AREA Increase No Change Decrease 1.
Management Control X
2.
Plant Operations X
3.
Refueling Operations and Activities X
4.
Maintenance X
5.
Surveillance and Preoperational Testing X
6.
Training X
7.
Radiation Protection X
8.
Environmental Protection X
9.
Emergency Planning X
10.
Fire Protection X
11.
Security and Safeguards X
12.
Design' Changes and Modifications X
,
13.
Reporting X
'
14.
QA Audits
.
X l
15.
Committee Activities X
.l 16.. Quality Control X
17.. Procurement X
.
E. C.
(BRANdH CHIEF)
/
S
'
I