IR 05000348/1980008
| ML19323B589 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 04/07/1980 |
| From: | Gillespie F, Moore D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML19323B584 | List: |
| References | |
| 50-348-80-08, 50-348-80-8, NUDOCS 8005130720 | |
| Download: ML19323B589 (1) | |
Text
-
-
---
- - - - - - -
L.__
.__.
_
-
-
....
.__,. _ _ _
M!.Tal!1TE!!S!?.!TTED EE3' lith
'
CO}iTtJHS 2.E012FSTJ'aTiDii Bu05180/ M
-
/...r\\
'
UNITED STATES
- ^
NUCLEAR REGULATORY COMMISSION n
g
,a REGION 11
'#
o 101 MARIETTA ST., N.W., SUITE 3100 ATLANTA, GEORGIA 3o303
APR 9 1980
,
Report No. 50-348/80-08
'
Docket No. 50-348 License No. NPF-2 Licensee: Alabama Power Company 600 North 18th Street Birmingham, Alabama 35202 Facility Name: Farley 1 Inspection at: Ashford, Alabama Inspection conducted: March 11-14, 1980 Date of Last Physical Security Inspection Visit: December 10-14, 1979
,
Type of Ins tion: U nounced Physical Security Ins ctor:
_
iJ NW
'/76d T. E. Mo te
,
Approved byi
,' ]
L//7/[IO F. P. Gillespie, Ac/ing Section Chief, Date Security Section, Safeguard Branch Inspection Summary Areas Inspected:
Included review of Security Organization; Lighting; Access
'
Control (Identification, Authorization and Badging); Detection Aids; Locks / Keys; Records / Reports; and Followup on Previous Enforcement Matters.
The inspection involved 20 inspector hours on site by 1 NRC inspector. The
.
inspection was begun during an offshift period; 2 inspection hours were accom-
plished during an offshift period.
.-
Results: Within the 6 areas examined during the inspection, one unresolved item
}
was identified:
Access Control - Packages hand-carried into the protected area by security force members were not searched at the access control point (Unresolved)
(80-08-01).
,
i t
s-r2 EO. 4aP
~
j COPY of Copies
'i R
Pages This Docurent is not to be
reproduced without specifie MATDttALTRANSMITTED HEREWITH approval or IE:II CONTAINS 2.790INFORMATION