IR 05000348/1980021
| ML19338E806 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 08/18/1980 |
| From: | Howell J, Mcguire D, Moore D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML19064A145 | List: |
| References | |
| 50-348-80-21, NUDOCS 8010060158 | |
| Download: ML19338E806 (1) | |
Text
e Malt' RIAL 1RANSLITED HEREMTH
'
-
(')
CONTAINS 2.793 RFORET)0N g ur
<[
o, UNITED STATES
't NUCLEAR REGULATORY COMMISSION
$
E REGION 11 g
- #
e 101 MARIETTA sT., N.W.. sulTE 3100 ATLANTA, GEORGIA 3o303 o
.....
AUG 181980 Report No. 50-348/80-21 Docket No. 50-348 License No. NPF-2
.-
Licensee: Alabama Power Company 600 North 18th Street Birmingham, AL 35202 Facility Name: Farley 1 Inspection at: Ashford, AL Inspection conducted: July 27-31, 1980 Date of Last Physical Security Inspection Visit: March 11-14, 1980 Type of Inspection: Unannounced Physical Security Inspecto s:
M-MW 6[/ @
.E
', hy c 1 Security Inspector Dat b/?-k)
w A. C. Howell sialSecuftyInspector D te '
g-
/ /
Approved by b )'/ M 9 A m a.
b f $T l
/
J (J< McGuird,
/
Chief, Se rity and Investigation
[Da[e Section,SafpguardsBr ch Inspection Summary Areas Inspected:
Included review of security plan; security program audit; lighting; alarm stations; detection sids; communications; compensatory measures and followup on previous inspection findings (unresolved item).
The inspection involved 62 inspector-hours on site by two NRC inspectors. The inspection was begun during an offshift period; six inspection hours were accom-
plished during offshift periods.
Results: Of the eight areas examined during the inspection, one apparent item of noncompliance was identified in one area.
Security %ganization - Some members of the security force were not properly qualified to perform security functions (80-21-01).
S-F2 70 -
JD D Copy of Copies S
Pages This Document is not to be reproduced without specific approval cf IE:II MTGIALTRANSWITED HGEWITH 8 010 0 6 0 /SP-CONTAWS 2.700 INFORMATION
-.
.
.
..
._
. -.
.