IR 05000364/1980008

From kanterella
Jump to navigation Jump to search
IE Insp Rept 50-364/80-08 on 800409-11.No Noncompliance Noted.Major Areas Inspected:Pipe Support Baseplate Designs, Per IE Bulletin 79-02 & Seismic Analysis for as-built safety-related Piping Per IE Bulletin 79-14
ML19312E022
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 04/23/1980
From: Ang W, Herdt A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML19312E016 List:
References
50-364-80-08, 50-364-80-8, IEB-79-02, IEB-79-14, IEB-79-2, NUDOCS 8006030073
Download: ML19312E022 (3)


Text

.

-

--.

f

=

.

parary

  1. o, UNITED STATES

NUCLEAR REGULATORY COMMISSION

,

o

$

[E REGION il

- -

o 101 MARIETTA ST., N.W., SUITE 3100 ATLANTA, GEORGIA 30303

-

s

.

Report No. 50-364/80-08

.

Licensee: Alabama Power Company 600 North 18'; Street Birmingham, A 35202 f

Facility: Farley Nuclear Plant Docket No. 50-364 License No. CPPR-86 Inspection at Farley Nuclear Plant near Dothan, Alabama Inspector: h i

4 - 2 3 -50 W. P.

Date Signed Approved by:

[ /[

N ~SO ' 0 A. R. Herdt, Section Chief, RCES Branch Date Signed SUMMARY Inspection on April 9-11, 1980 Areas Inspection

-

This routine, announced inspection involved 20 inspector-hours on site in the areas of pipe support baseplate designs using concrete expansion bolts (IEB 79-02); seismic analysis for as-built safety related piping systems.

Results Of the areas inspected, no items of noncompliance or deviations were identified.

-

,

$

,,,

.

e esm

8006030 d.73

__

.

- - - - -

..

-

.

.

= :. a

.

.

....

,

.

.

t

-

s DETAILS

1.

Perscns Contacted

-

Licensee Employees

  • J. A. Mooney, Project Manager-Construction

.

  • R.'E. Hollands, Quality Assurance Supervisor
  • J. G. Hegi, Project Quality Control Engineer
  • R. M. Colemant, Production Engineering Supervisor
  • J. C. Bozeman, Construction Supervisor

.

Other licensee employees contacted included 4 construction craftsmen and 4

technicians.

Other Organizations i

  • L. F. Warrik, Project Manager-Daniel Construction Company
  • D. L. Garrison, QA Manager-Daniel Construction Company
  • L. C. Easterwood, QC Manager-Daniel Construction Company

!

  • Attended exit interview 2.

Exit Interview The inspection scope and findings were summarized on April 11, 1980, with those persons indicated in paragraph I above.

,

3.

Licensee Action on Previous Inspection Findings Not inspected.

.

4.

Unresolved Items Unresolved items were not identified during this inspection.

5.

Pipe Support Baseplate Designs Using Concrete Expansion Bolts (IEB 79-02)

t On January 7, 1980, the licensee provided a response to IE Bulletin 79-02.

An inspection was performed to verify licensee compliance with IE Bulletin 79-02 requirements and licensee commitments.

.

Daniel Field Quality Control Procedure 5.4.2.1A, Rev.

1, Verification of Acceptab1'e Concrete Expansion Anchors for Selected Piping Systems, was

'

reviewed. Component Cooling Water System Support No. 2-CCW-R359 and Auxil-iary Feedwater System Supports 2AFW-R119 and 1AFW-R120 were randomly selected and inspected for compliance with IEB 79-02 requirements and licensee commit-ments.

.

,.

<

r y

,

- - -

-


e

,

y

---

,

.. _ _ __

____ _ _.

_ _ _ __

_ _

_ _ _ _ _ _ _

e

..

.

(

-2-

~

The licensee's IEB 79-02 site work was approximately 60 percent complete.

Pending completion of IEB 79-02 requirements, the bulletin shall remain open.

No items of noncompliance or deviations were identified..

6.

Seismic Analysis for As-Built Safety Related Piping Systems (IEB 79-14)

On' November 2, 1979, the licensee provided a response to IE Bulletin 79-14.

An inspection was performed to verify licensee compliance with IE Bulletin 79-14 requirements and licensee commitments.

The' following procedures that provided the licensee IEB 79-14 inspection requirements were reviewed:

Daniel Field Quality Control Procedure 5.4.2.1, Rev.12-Quality Control Procedure for Installation of Piping.

Alabama Power Company (APCO) FNP-QCP4.01-APC0 Construction Department Inspection of Seismic Category 1 Piping Systems.

Portions of the component cooling water system piping shown on Daniel drawing SK-P17-CV364 and Auxiliary Feedwater System piping shown on Daniel drawing SK-N21-CV041 were inspected. Some minor discrepancies were noted in the measurement of clearances for support 2CCW-R359, 2AFW-R119 and 2AFW-R120. The licensee is performing a reinspection of the clearances of the supports and will evaluate the results of the reinspection.

Pending licensee completion of IEB 79-14 requirements, the bulletin shall remain open.

<

No items of noncompliance or deviations were noted.

.

,,7 4 4D w=

.