IR 05000327/1981038

From kanterella
Jump to navigation Jump to search
IE Safeguards Insp Repts 50-327/81-38 & 50-327/81-47 on 811019-23.Noncompliance Noted:Failure to Complete Annual Weapons Requalification.Details Withheld (Ref 10CFR2.790)
ML20040F130
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 11/17/1981
From: Goode R, Mcguire D, Moore D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20040F129 List:
References
50-327-81-38, 50-328-81-47, NUDOCS 8202080356
Download: ML20040F130 (1)


Text

-_

_-

f/.ATERfAL TRANSVITTED EEREWmf

%,

conwns agfjggg NOMAGAFEGUARDS INFORMATl0K

NUCLEAR REGULATORY COMMISSION o

REGION 11 t

z f*

101 MARIETT A ST., N.W., SUITE 3100

k Y

ATLANTA, GEORGIA 30303

g.....o Report Nos. 50-327/81-38 and 50-328/81-47 Docket Nos. 50-327 and 50-328 License Nos. DPR-77 and DPR-79 Licensee: Tennessee Valley Authority 500A Chestnut Street Chattanooga, TN 37401 Facility Name:

Sequoyah Nuclear Plant Inspection at:

Daisy, TN Inspection Cunducted: October 19-23, 1981 Date of Last Physical Security Inspection Visit: August 3-7, 1981 Type of Ins cti Un nnounced Physical Security Inspect rs:~

/

h 1/!/(, f b'l Yd, Physical Security Inspector

/Dat'e Signed

~ Y A t 0 C_

(1 Y I(, l91 R., W. Gd de Physical Security Inspector Oate Signed w

Approved by:[/

__//_/j_8/

'

D. R.~ ~McGuire, Chief, Physical Security Section Dat Signed Technical Inspection Branch Division of Engineering and Technical Inspection

.

Inspection Summary Areas Inspacted:

Included review of Security Plan and Implementing Procedures; F

Security Organization - Management; Security Organization - Personnel; Security Organization - Response; Security Program Audit; and Inspector Followup Actions.

The inspection involved 86 inspector hours on site by two NRC inspectors. The inspection was begun during an offshift period; 26 inspection nours were pIv5 accomplished during offshif t periods.

~O'

--o Results: The licensee was found to be in compliance with NRC requirements within

the five areas examined during the inspection except for the followinn two items:

.omt 1.

Security Organization - Personnel - Failure to complete annual weapons So requalification.

$$

g 2.

Security Organization - Response - Failure to provide adequate documenta-cera tion.

s-r2 Pl

/ 8 4 ----

cao

-

aswarm. ccy a

c m ea 5 " " "**8

.

-

D*

[j;p',;f13:11j Qi-}"jt t UPON SEPAluTION T}lIS ETERML TPMSMITTED HERE'N1T1f p

1g PAGE IS DECONTROI1D.

CONIAH;S 230041) SAFECUARDS INF0mATION ypc c

a