IR 05000328/1981011

From kanterella
Jump to navigation Jump to search
IE Insp Rept 50-328/81-11 on 810126-30.No Noncompliance Noted.Major Areas Inspected:Security Organization & Procedures,Physical Barriers & Security Hardware Installation.Details Withheld (Ref 10CFR2.790)
ML19350D315
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 04/08/1981
From: Goode R, Mcguire D, Moore D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML19350D311 List:
References
50-328-81-11, NUDOCS 8104150200
Download: ML19350D315 (1)


Text

L2Lwswmexnneemo CONTAINS 2.750i3FORMATIDH

, f uroy'o,

-,#

UNITED STATES 8'

7.

NUCLEAR REGULATORY COMMISSION

O!

E REGION 11 D'h

101 MARIETTA ST., N.W., SUITE 3100

ATLANTA, GEORGIA 30303 g.....o A/R 0 81981 Report No. 50-328/81-11 Jocket No. 50-328 License No. CPPR-73 Licensee:

Tennessee Valley Authority 500A Chestnut Street Chattanooga, TN 37401 Facility Name:

Sequoyah 2 Inspection at:

Sequoyah site near Chattanooga, TN Inspection Conducted: March 18-20, 1981 Date of Last Physical Security Inspection Visit: January 26-30, 1981 Type of Inspection: Announced Preoperational Physical Security V[f[9/

Inspec h

D. E. Moore, Physical Security Inspector Dat'e Signed

!

GT W vielsi 97 R. W. Goode, Physical Security Inspector

'Da'te Signed Approved by:.

2x ~

[![/

m D."R. 'McGuire, Chief, Physical Security Section,

Date' Signed Technical Inspection Branch, Division of Engineering and Technical Inspection Inspection Summary Areas Inspected:

Included review of security organization and implementing security procedures, physical barriers and security hardware installation to assure the licensee's capability of meeting the performance requirements estab-lished by 10 CFR 73.55 and commitments set forth in the approved Security Plan.

The inspection involved 36 inspector hours on site by two NRC inspectors. Four inspection hours were accomplished during offshift periods.

Results: The licensee was found to be capable of meeting NRC requirements within the areas examined except the completion of the back-up power source for security systems. This requires completion prior to fuel loading.