ML20040F128

From kanterella
Jump to navigation Jump to search
Forwards IE Safeguards Insp Repts 50-327/81-38 & 50-328/81-47 on 811019-23.Notice of Violation Withheld (Ref 10CFR2.790)
ML20040F128
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 11/17/1981
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML20040F129 List:
References
NUDOCS 8202080355
Download: ML20040F128 (2)


See also: IR 05000327/1981038

Text

Y

IMTEmn Tem

Nh'

.

-

coNTAms uggm }lIIED HEREwtT!!

-

.

g,

SAFEGUARDS INFORMARg'fMTIon

,

NOV 171981

^,

,

"%

s

Tennessee Valley Authority

g

,rp ,, D

ATTN:

Mr. H. G. Parris

,g

Manager of Power

~._,

Fra

51032%

'-

500A Chestnut Street Tower II

.cyh%

Chattanooga, TN 37401

Q::a Af0

4

k'f,,

Gentlemen:

/f

Subject: Report Nos.[0d27/81Mapd 50-328/81-47

This refers to the routine safeguards inspection conducted by Mr. D. E. Moore of

this office on October 19-23, 1981, of activities authorized by NRC Operating

License Nos. DPR-77 and DPR-79 for the Sequoyah Nuclear Plant facility and to the

discussion of our findings held with Mr. J. M. McGriff of your staff at the

conclusion of the inspection.

Areas examined during this inspection included your physical security program as

implemented under the provisions of Title 10, Code of Fedaral Regulations, Part

73, " Physical Protection of Plants and Materials", and the specific requirements

of your approved Security Plan. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, performance tests, and observations by the inspectors.

During the inspection, it was found that certain activities under your license

appear to violate NRC requirements.

These items and references to pertinent

requirements are listed in the Notice of Violation enclosed herewith as

Appendix A.

Elements to be included in your response are delineated in

Appendix A.

Details of activities involving safeguards and security measures are

exempt from disclosure in accordance with 10 CFR 2.790(d).

Therefore, your

,

response should be incorporated in a separate paper and referenced in your reply.

In accordance with Section 2.790(d) of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, activities involving safeguards and

security measures are exempt from public disclosure; therefore, the enclosures to

this letter with the exception of the report cover page, which is an inspection

summary, will not be placed in the Public Document Room.

Should yot have any questions concerning this letter, we will be glad to discuss

them with you.

EQI;G: SAFEGUARDS INFORMATION

Sincerely,

E'~W D*7 ATOMIC EEGY ACT 1954.

DW.UNS OF THE PROTECTION

N[

4%4 2.i IS Or 10 CFR 73.21

c

EtiX%W

SW

'

TO Cl vIL 03 CRIMINAL SANCTIONS.

TIONe

SAFg,UARDS

UPON SFIARA 0

13

R. C. Lewis, Director

0 ED.

Division of Resident and

Bh

PANISDE

Reactor Project Inspection .gk

'

.

6s

\\

Enclosures: See Page 2

ar71EmtD3T

,

SAFEGUARDS 1

ORMATION

p ]R . (Y} N Gu RC

)<-

-

"

..

1stgg.

c

8202000355 811117

'

~ " d ED Wd"IW

IN"

gDRADOCK05000

~ CONTES 2 N@ SAFEGUARDS fjj[ggl4g g77

MATERIAL TRANSMITTED HEREWITH

.

.

CONTA!NS 2.790(d) SAFEGipRnc

-

SAFEGUARDS 1;JOR"gWg

.

Tennessee Valley Authority

2

NOV 171981

Enclosures:

1.

Appendix A, Notice of Violation

(Exempt from Disclosure)

2.

Inspection Report Nos. 50-327/81-38

and 50-328/81-47

(Exempt from Disclosure)

3.

Inspection Summary

(Not Exempt)

cc w/ encl:

H. J. Green, Director of Nuclear Power

G. G. Stack, Project Manager

C. C. Mason, Plant

Superintendent

J. F. Cox, Supervisor, Nuclear

Licensing Section

M. J. Burzynski, Project Engineer

H. N. Culver, Chief, Nuclear Safety

Review Staff

bec w/ enc 1:

'

NRC Resident Inspector

Document Management Branch

bec w/ Inspection Summary:

~ State of Tennessee

ENCLostr1r: CONTAIN3 N

SAFEGUAE INy0RYATION.

UPON SEPT

TION THIS

PAGE Is pgt,?RTROLLEp.

RI

RII

RII

RII

RII

RGo6de:ht

DMhP

DMd utre

A

[6v

OIshinski

d / /81

//6 /81

10/h/81

14

81

Jp/[J81

4

RII

RII

DQuick

RCLt

s

10M/ /81

[' / 814h FEGUARDS INFORMATI

'1

'

KERP.L TRAriSWTED ISE'NITH

CONTA!NS 2.7S0(d) S' EGUARDS INFORil.ATION

4