Category:INSPECTION REPORT
MONTHYEARIR 05000324/19990061999-10-0606 October 1999 Insp Repts 50-324/99-06 & 50-325/99-06 on 990801-0911.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000324/19990051999-08-27027 August 1999 Insp Repts 50-324/99-05 & 50-325/99-05 on 990620-0731.Two Violations Noted Being Treated as Ncv.Major Areas Inspected: Operations,Maint & Plant Support IR 05000324/19990041999-07-19019 July 1999 Insp Repts 50-324/99-04 & 50-325/99-04 on 990509-0619. Non-cited Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support.Includes Results of Y2K Readiness Program Review IR 05000324/19990031999-06-0707 June 1999 Insp Repts 50-324/99-03 & 50-325/99-03 on 990328-0508.Two Violations Noted & Being Treated as non-cited Violations. Major Areas Inspected:Aspects of Licensee Operations,Maint, Engineering & Plant Support IR 05000324/19990021999-04-26026 April 1999 Forwards Insp Repts 50-324/99-02 & 50-325/99-02 on 990214-0327.No Violations Noted.Major Areas Inspected: Licensee Operation,Engineering,Maint & Plant Support IR 05000324/19980141999-03-18018 March 1999 Insp Repts 50-324/98-14 & 50-325/98-14 on 990111-15,25 & 29. No Violations Noted.Major Areas Inspected:Licensee Calculations,Analysis,Performance Test Procedures & Other Engineering Activities IR 05000324/19990011999-03-15015 March 1999 Insp Repts 50-324/99-01 & 50-325/99-01 on 990103-0213.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000324/19980111999-01-28028 January 1999 Insp Repts 50-324/98-11 & 50-325/98-11 on 981122-990102.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint & Plant Support IR 05000324/19980101998-12-21021 December 1998 Insp Repts 50-324/98-10 & 50-325/98-10 on 981011-1121. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support.Also Includes Results of Engineering & Health Physics Insp IR 05000324/19980131998-11-24024 November 1998 Partially Withheld Insp Repts 50-324/98-13 & 50-325/98-13 on 981026-30 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Aspects of Licensee Plant Support IR 05000324/19980091998-11-0909 November 1998 Insp Repts 50-324/98-09 & 50-325/98-09 on 980830-1010. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000324/19980081998-09-28028 September 1998 Insp Repts 50-324/98-08 & 50-325/98-08 on 980719-0829.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000324/19980071998-08-11011 August 1998 Insp Repts 50-324/98-07 & 50-325/98-07 on 980607-0718. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000324/19980061998-07-0606 July 1998 Insp Repts 50-324/98-06 & 50-325/98-06 on 980426-0606. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000324/19980051998-06-0101 June 1998 Insp Repts 50-324/98-05 & 50-325/98-05 on 980315-0425. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20216H4431998-04-16016 April 1998 Insp Repts 50-324/98-04 & 50-325/98-04 on 980209-13,0309-12 & 16-20.Violations Noted.Major Areas inspected:follow-up on Licensee Corrective Actions for Electrical Equipment Environ Qualification & Review of Instrument Response Time Testing IR 05000324/19980031998-04-13013 April 1998 Insp Repts 50-324/98-03 & 50-325/98-03 on 980201-0314.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support.Also Includes Results of Health Physics Insp by Regional Inspectors ML20217C8061998-03-16016 March 1998 Insp Repts 50-324/98-01 & 50-325/98-01 on 980126-30. Violations Noted.Major Areas Inspected:Emergency Preparedness Exercise ML20216B1741998-03-0202 March 1998 Insp Repts 50-324/97-15 & 50-325/97-15 on 971228-980131. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support ML20202D3161998-02-0505 February 1998 Omitted Page 42 to Insp Repts 50-324/97-13 & 50-325/97-13 Transmitted on 980123 ML20199G7501998-01-23023 January 1998 Insp Repts 50-324/97-13 & 50-325/97-13 on 971109-1227. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support.Includes Results of Maint, Engineering & FP Insps ML20198N6561997-12-30030 December 1997 Insp Repts 50-324/97-14 & 50-325/97-14 on 971209-12. Violations Noted.Major Areas Inspected:Radiation Protection & Chemistry Controls,Miscellaneous Radiation Protection & Chemistry Issues & Mgt Meetings IR 05000324/19970141997-12-30030 December 1997 Insp Repts 50-324/97-14 & 50-325/97-14 on 971209-12. Violations Noted.Major Areas Inspected:Radiation Protection & Chemistry Controls,Miscellaneous Radiation Protection & Chemistry Issues & Mgt Meetings ML20197H1881997-12-0808 December 1997 Insp Repts 50-324/97-12 & 50-325/97-12 on 970928-1108. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000324/19970111997-10-27027 October 1997 Insp Repts 50-324/97-11 & 50-325/97-11 on 970819-0927. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000324/19970091997-09-15015 September 1997 Insp Repts 50-324/97-09 & 50-325/97-09 on 970706-0816. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support Re Improper Processing of Changes to Fire Protection Instrumentation Surveillance IR 05000324/19970101997-08-0808 August 1997 Insp Repts 50-324/97-10 & 50-325/97-10 on 970728-30.No Violations Noted.Major Areas Inspected:Plant Support ML20198F4101997-08-0101 August 1997 Insp Repts 50-324/97-08 & 50-325/97-08 on 970525-0705. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000324/19970071997-06-20020 June 1997 Integrated Insp Repts 50-324/97-07 & 50-325/97-07 on 970413-0524.No Violations Noted.Major Areas Inspected: Licensee Operations,Engineering,Maint & Plant Support ML20140D1781997-05-12012 May 1997 Insp Repts 50-324/97-05 & 50-325/97-05 on 970302-0412. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000324/19970061997-05-0909 May 1997 Safeguards Insp Repts 50-324/97-06 & 50-325/97-06 on 970409-11.No Violations Noted.Major Areas Inspected:Aspects of Licensee Plant Support,Status of Security Facilities & Equipment ML20138J5981997-05-0202 May 1997 Insp Repts 50-324/97-03 & 50-325/97-03 on 970303-0404. Violations Noted.Major Areas Inspected:Review of Licensee Engineering Activities to Support Operation of Plant EQ Program & Followup on Previous Insp Findings IR 05000324/19970041997-04-0404 April 1997 Safeguard Insp Repts 50-324/97-04 & 50-325/97-04 on 970303-07.No Violations Noted.Major Areas Inspected:Plant Support & Security & Safeguards Procedures & Documentation ML20137T5711997-03-31031 March 1997 Insp Repts 50-324/97-02 & 50-325/97-02 on 970119-0301. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering,Plant Support & Emergency Preparedness ML20134P1551997-02-14014 February 1997 Insp Repts 50-324/96-18 & 50-325/96-18 on 961208-970118. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20133L5931997-01-0909 January 1997 Errata to Insp Repts 50-324/96-15 & 50-325/96-15 on 960915- 1026.Statement in Executive Summary Under Operations Could Be Construed to Convey Wrong Meaning.Corrective Page to Be Inserted Encl ML20133H4881997-01-0202 January 1997 Insp Repts 50-324/96-16 & 50-325/96-16 on 961027-1207. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20132G8751996-12-13013 December 1996 Insp Repts 50-324/96-17 & 50-325/96-17 on 961113-15. Violations Noted.Major Areas Inspected:Damaged Locks & Licensee Actions IR 05000324/19960151996-11-22022 November 1996 Insp Repts 50-324/96-15 & 50-325/96-15 on 960915-1026. Violations Noted.Major Areas Inspected:License Operations, Engineering,Maint & Plant Support ML20129H1081996-10-11011 October 1996 Insp Repts 50-324/96-13 & 50-325/96-13 on 960804-0914. Violations Noted.Major Areas Inspected:Aspects of Operations,Engineering,Maint & Plant Support ML20134D3981996-10-0404 October 1996 Insp Repts 50-324/96-14 & 50-325/96-14 on 960624-0823. Violations Noted.Major Areas Inspected:Review of Licensees EQ Program & Followup on Previous Inspection Findings IR 05000324/19910061996-04-11011 April 1996 Insp Repts 50-324/91-06 & 50-325/91-06 on 910301-31.No Violations Noted.Major Areas Inspected:Maint,Surveillance Observation,Operation Safety Verification,Onsite Review Committee,Onsite Followup of Events IR 05000324/19940331994-12-21021 December 1994 Partially Withheld Insp Repts 50-324/94-33 & 50-325/94-33 on 941024-28 & 1121-23 (Ref 10CFR73.21).No Violations Noted. Major Areas Inspected:Protected & Vital Area Access Control of Personnel & Packages IR 05000324/19930561993-12-27027 December 1993 Insp Repts 50-324/93-56 & 50-325/93-56 on 931129-1203.No Violations Identified.Major Areas Inspected:Chemistry/ Effluent Department,Plant Water Chemistry,Radioactive Material Processing & Shipping IR 05000324/19930571993-12-22022 December 1993 Insp Repts 50-324/93-57 & 50-325/93-57 on 931129-1203. Violations Noted.Major Areas Inspected:Electrical Maintenance & Mod.Startup Open Item F2 Neutron Detector Repairs & Inspector Followup Item 92-46-01 Reviewed IR 05000324/19930531993-12-10010 December 1993 Insp Repts 50-324/93-53 & 50-325/93-53 on 931115-19.No Violations Noted.Major Areas Inspected:Employee Concerns Program & Actions on Previous Insp Findings IR 05000324/19930491993-11-24024 November 1993 Insp Repts 50-325/93-49 & 50-324/93-49 on 931009-31. Violations Noted But Not Cited.Major Areas Inspected: Maintenance,Operations,Onsite Review Committee & three-year Plan IR 05000324/19930471993-11-22022 November 1993 Partially Withheld Insp Repts 50-324/93-47 & 50-325/93-47 on 931004-08.Noncited Violation Identified.Major Areas Inspected:Physical Security Programs for Power Reactors,Mgt Support,Audits,Protected & Vital Area Barriers IR 05000324/19930501993-11-17017 November 1993 Insp Repts 50-324/93-50 & 50-325/93-50 on 931025-29.No Violations Noted.Major Areas Inspected:Investigation of Unit 2 Fuel Pool Leakage Problem,Tendon Surveillance Program & Followup on Previous Insp Findings IR 05000324/19930511993-11-10010 November 1993 Insp Repts 50-324/93-51 & 50-325/93-51 on 931025-29.No Violations Noted.Major Areas Inspected:Isi Review of Visual Exam Data & Evaluations for Select Welds in Unit 1 Reactor Vessel Shroud 1999-08-27
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000324/19990061999-10-0606 October 1999 Insp Repts 50-324/99-06 & 50-325/99-06 on 990801-0911.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000324/19990051999-08-27027 August 1999 Insp Repts 50-324/99-05 & 50-325/99-05 on 990620-0731.Two Violations Noted Being Treated as Ncv.Major Areas Inspected: Operations,Maint & Plant Support IR 05000324/19990041999-07-19019 July 1999 Insp Repts 50-324/99-04 & 50-325/99-04 on 990509-0619. Non-cited Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support.Includes Results of Y2K Readiness Program Review IR 05000324/19990031999-06-0707 June 1999 Insp Repts 50-324/99-03 & 50-325/99-03 on 990328-0508.Two Violations Noted & Being Treated as non-cited Violations. Major Areas Inspected:Aspects of Licensee Operations,Maint, Engineering & Plant Support IR 05000324/19990021999-04-26026 April 1999 Forwards Insp Repts 50-324/99-02 & 50-325/99-02 on 990214-0327.No Violations Noted.Major Areas Inspected: Licensee Operation,Engineering,Maint & Plant Support IR 05000324/19980141999-03-18018 March 1999 Insp Repts 50-324/98-14 & 50-325/98-14 on 990111-15,25 & 29. No Violations Noted.Major Areas Inspected:Licensee Calculations,Analysis,Performance Test Procedures & Other Engineering Activities IR 05000324/19990011999-03-15015 March 1999 Insp Repts 50-324/99-01 & 50-325/99-01 on 990103-0213.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000324/19980111999-01-28028 January 1999 Insp Repts 50-324/98-11 & 50-325/98-11 on 981122-990102.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint & Plant Support IR 05000324/19980101998-12-21021 December 1998 Insp Repts 50-324/98-10 & 50-325/98-10 on 981011-1121. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support.Also Includes Results of Engineering & Health Physics Insp IR 05000324/19980131998-11-24024 November 1998 Partially Withheld Insp Repts 50-324/98-13 & 50-325/98-13 on 981026-30 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Aspects of Licensee Plant Support IR 05000324/19980091998-11-0909 November 1998 Insp Repts 50-324/98-09 & 50-325/98-09 on 980830-1010. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000324/19980081998-09-28028 September 1998 Insp Repts 50-324/98-08 & 50-325/98-08 on 980719-0829.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000324/19980071998-08-11011 August 1998 Insp Repts 50-324/98-07 & 50-325/98-07 on 980607-0718. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000324/19980061998-07-0606 July 1998 Insp Repts 50-324/98-06 & 50-325/98-06 on 980426-0606. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000324/19980051998-06-0101 June 1998 Insp Repts 50-324/98-05 & 50-325/98-05 on 980315-0425. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20216H4431998-04-16016 April 1998 Insp Repts 50-324/98-04 & 50-325/98-04 on 980209-13,0309-12 & 16-20.Violations Noted.Major Areas inspected:follow-up on Licensee Corrective Actions for Electrical Equipment Environ Qualification & Review of Instrument Response Time Testing IR 05000324/19980031998-04-13013 April 1998 Insp Repts 50-324/98-03 & 50-325/98-03 on 980201-0314.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support.Also Includes Results of Health Physics Insp by Regional Inspectors ML20217C8061998-03-16016 March 1998 Insp Repts 50-324/98-01 & 50-325/98-01 on 980126-30. Violations Noted.Major Areas Inspected:Emergency Preparedness Exercise ML20216B1741998-03-0202 March 1998 Insp Repts 50-324/97-15 & 50-325/97-15 on 971228-980131. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support ML20202D3161998-02-0505 February 1998 Omitted Page 42 to Insp Repts 50-324/97-13 & 50-325/97-13 Transmitted on 980123 ML20199G7501998-01-23023 January 1998 Insp Repts 50-324/97-13 & 50-325/97-13 on 971109-1227. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support.Includes Results of Maint, Engineering & FP Insps ML20198N6561997-12-30030 December 1997 Insp Repts 50-324/97-14 & 50-325/97-14 on 971209-12. Violations Noted.Major Areas Inspected:Radiation Protection & Chemistry Controls,Miscellaneous Radiation Protection & Chemistry Issues & Mgt Meetings IR 05000324/19970141997-12-30030 December 1997 Insp Repts 50-324/97-14 & 50-325/97-14 on 971209-12. Violations Noted.Major Areas Inspected:Radiation Protection & Chemistry Controls,Miscellaneous Radiation Protection & Chemistry Issues & Mgt Meetings ML20197H1881997-12-0808 December 1997 Insp Repts 50-324/97-12 & 50-325/97-12 on 970928-1108. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000324/19970111997-10-27027 October 1997 Insp Repts 50-324/97-11 & 50-325/97-11 on 970819-0927. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000324/19970091997-09-15015 September 1997 Insp Repts 50-324/97-09 & 50-325/97-09 on 970706-0816. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support Re Improper Processing of Changes to Fire Protection Instrumentation Surveillance IR 05000324/19970101997-08-0808 August 1997 Insp Repts 50-324/97-10 & 50-325/97-10 on 970728-30.No Violations Noted.Major Areas Inspected:Plant Support ML20198F4101997-08-0101 August 1997 Insp Repts 50-324/97-08 & 50-325/97-08 on 970525-0705. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000324/19970071997-06-20020 June 1997 Integrated Insp Repts 50-324/97-07 & 50-325/97-07 on 970413-0524.No Violations Noted.Major Areas Inspected: Licensee Operations,Engineering,Maint & Plant Support ML20140D1781997-05-12012 May 1997 Insp Repts 50-324/97-05 & 50-325/97-05 on 970302-0412. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000324/19970061997-05-0909 May 1997 Safeguards Insp Repts 50-324/97-06 & 50-325/97-06 on 970409-11.No Violations Noted.Major Areas Inspected:Aspects of Licensee Plant Support,Status of Security Facilities & Equipment ML20138J5981997-05-0202 May 1997 Insp Repts 50-324/97-03 & 50-325/97-03 on 970303-0404. Violations Noted.Major Areas Inspected:Review of Licensee Engineering Activities to Support Operation of Plant EQ Program & Followup on Previous Insp Findings IR 05000324/19970041997-04-0404 April 1997 Safeguard Insp Repts 50-324/97-04 & 50-325/97-04 on 970303-07.No Violations Noted.Major Areas Inspected:Plant Support & Security & Safeguards Procedures & Documentation ML20137T5711997-03-31031 March 1997 Insp Repts 50-324/97-02 & 50-325/97-02 on 970119-0301. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering,Plant Support & Emergency Preparedness ML20134P1551997-02-14014 February 1997 Insp Repts 50-324/96-18 & 50-325/96-18 on 961208-970118. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20133L5931997-01-0909 January 1997 Errata to Insp Repts 50-324/96-15 & 50-325/96-15 on 960915- 1026.Statement in Executive Summary Under Operations Could Be Construed to Convey Wrong Meaning.Corrective Page to Be Inserted Encl ML20133H4881997-01-0202 January 1997 Insp Repts 50-324/96-16 & 50-325/96-16 on 961027-1207. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20132G8751996-12-13013 December 1996 Insp Repts 50-324/96-17 & 50-325/96-17 on 961113-15. Violations Noted.Major Areas Inspected:Damaged Locks & Licensee Actions IR 05000324/19960151996-11-22022 November 1996 Insp Repts 50-324/96-15 & 50-325/96-15 on 960915-1026. Violations Noted.Major Areas Inspected:License Operations, Engineering,Maint & Plant Support ML20129H1081996-10-11011 October 1996 Insp Repts 50-324/96-13 & 50-325/96-13 on 960804-0914. Violations Noted.Major Areas Inspected:Aspects of Operations,Engineering,Maint & Plant Support ML20134D3981996-10-0404 October 1996 Insp Repts 50-324/96-14 & 50-325/96-14 on 960624-0823. Violations Noted.Major Areas Inspected:Review of Licensees EQ Program & Followup on Previous Inspection Findings IR 05000324/19910061996-04-11011 April 1996 Insp Repts 50-324/91-06 & 50-325/91-06 on 910301-31.No Violations Noted.Major Areas Inspected:Maint,Surveillance Observation,Operation Safety Verification,Onsite Review Committee,Onsite Followup of Events IR 05000324/19940331994-12-21021 December 1994 Partially Withheld Insp Repts 50-324/94-33 & 50-325/94-33 on 941024-28 & 1121-23 (Ref 10CFR73.21).No Violations Noted. Major Areas Inspected:Protected & Vital Area Access Control of Personnel & Packages IR 05000324/19930561993-12-27027 December 1993 Insp Repts 50-324/93-56 & 50-325/93-56 on 931129-1203.No Violations Identified.Major Areas Inspected:Chemistry/ Effluent Department,Plant Water Chemistry,Radioactive Material Processing & Shipping IR 05000324/19930571993-12-22022 December 1993 Insp Repts 50-324/93-57 & 50-325/93-57 on 931129-1203. Violations Noted.Major Areas Inspected:Electrical Maintenance & Mod.Startup Open Item F2 Neutron Detector Repairs & Inspector Followup Item 92-46-01 Reviewed IR 05000324/19930531993-12-10010 December 1993 Insp Repts 50-324/93-53 & 50-325/93-53 on 931115-19.No Violations Noted.Major Areas Inspected:Employee Concerns Program & Actions on Previous Insp Findings IR 05000324/19930491993-11-24024 November 1993 Insp Repts 50-325/93-49 & 50-324/93-49 on 931009-31. Violations Noted But Not Cited.Major Areas Inspected: Maintenance,Operations,Onsite Review Committee & three-year Plan IR 05000324/19930471993-11-22022 November 1993 Partially Withheld Insp Repts 50-324/93-47 & 50-325/93-47 on 931004-08.Noncited Violation Identified.Major Areas Inspected:Physical Security Programs for Power Reactors,Mgt Support,Audits,Protected & Vital Area Barriers IR 05000324/19930501993-11-17017 November 1993 Insp Repts 50-324/93-50 & 50-325/93-50 on 931025-29.No Violations Noted.Major Areas Inspected:Investigation of Unit 2 Fuel Pool Leakage Problem,Tendon Surveillance Program & Followup on Previous Insp Findings IR 05000324/19930511993-11-10010 November 1993 Insp Repts 50-324/93-51 & 50-325/93-51 on 931025-29.No Violations Noted.Major Areas Inspected:Isi Review of Visual Exam Data & Evaluations for Select Welds in Unit 1 Reactor Vessel Shroud 1999-08-27
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARPNO-II-99-045, on 991018,Hurricane Irene Was Located Approx 105 Miles East of Cape Hatteras,Nc.Ctr of Hurricane Was Estimated Near Latitude 35.6 North & Longitude 73.8 West. Storm Was Moving Northeast at 35 Mph1999-10-18018 October 1999 PNO-II-99-045:on 991018,Hurricane Irene Was Located Approx 105 Miles East of Cape Hatteras,Nc.Ctr of Hurricane Was Estimated Near Latitude 35.6 North & Longitude 73.8 West. Storm Was Moving Northeast at 35 Mph IR 05000324/19990061999-10-0606 October 1999 Insp Repts 50-324/99-06 & 50-325/99-06 on 990801-0911.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support PNO-II-99-037D, on 990915,Hurricane Floyd Was Located Approx 380 Miles Southeast of Wilmington,Nc.Ctr of Hurricane Was Estimated Near Latitude 28.8 North & Longitude 78.8 West. Storm Was Moving Northwest at 14 Mph.Max Winds Were 140 Mph1999-09-15015 September 1999 PNO-II-99-037D:on 990915,Hurricane Floyd Was Located Approx 380 Miles Southeast of Wilmington,Nc.Ctr of Hurricane Was Estimated Near Latitude 28.8 North & Longitude 78.8 West. Storm Was Moving Northwest at 14 Mph.Max Winds Were 140 Mph PNO-II-99-037E, on 990915,Hurricane Floyd Was Located Approx 380 Miles Southeast of Wilmington,Nc.Ctr of Hurricane Was Estimated Near Latitude 29.3 North & Longitude 78.8 West. Storm Was Moving north-northwest at 14 Mph1999-09-15015 September 1999 PNO-II-99-037E:on 990915,Hurricane Floyd Was Located Approx 380 Miles Southeast of Wilmington,Nc.Ctr of Hurricane Was Estimated Near Latitude 29.3 North & Longitude 78.8 West. Storm Was Moving north-northwest at 14 Mph PNO-II-99-037F, on 990915,Hurricane Floyd Was Located Approx 350 Miles Southeast of Wilmington,Nc.Ctr of Hurricane Was Estimated Near Latitude 29.9 North & Longitude 79.0 West. Storm Was Moving north-northwest at 14 Mph1999-09-15015 September 1999 PNO-II-99-037F:on 990915,Hurricane Floyd Was Located Approx 350 Miles Southeast of Wilmington,Nc.Ctr of Hurricane Was Estimated Near Latitude 29.9 North & Longitude 79.0 West. Storm Was Moving north-northwest at 14 Mph PNO-II-99-037H, on 990915,Hurricane Floyd Was Located Approx 168 Miles Southeast of Bsep.Ctr of Hurricane Was Estimated Near Latitude 31.3 North & Longitude 79.0 West.Storm Was Moving North at 17 Mph with Max Winds at 115 Mph1999-09-15015 September 1999 PNO-II-99-037H:on 990915,Hurricane Floyd Was Located Approx 168 Miles Southeast of Bsep.Ctr of Hurricane Was Estimated Near Latitude 31.3 North & Longitude 79.0 West.Storm Was Moving North at 17 Mph with Max Winds at 115 Mph PNO-II-99-037G, on 990915,Hurricane Floyd Was Located Approx 216 Miles Southeast of Bsep.Ctr of Hurricane Was Estimated Near Latitude 30.6 North & Longitude 79.1 West.Storm Was Moving north-northwest at 14 Mph with Max Winds at 125 Mph1999-09-15015 September 1999 PNO-II-99-037G:on 990915,Hurricane Floyd Was Located Approx 216 Miles Southeast of Bsep.Ctr of Hurricane Was Estimated Near Latitude 30.6 North & Longitude 79.1 West.Storm Was Moving north-northwest at 14 Mph with Max Winds at 125 Mph PNO-II-99-035, on 990830,util Secured from Notification of Unusual Event After Hurricane Warning Lifted for Area.Plant Had Been Placed in Hot Shutdown Due to Predicted Hurricane Track.Unit 2 Commenced Restart on 9908311999-08-31031 August 1999 PNO-II-99-035:on 990830,util Secured from Notification of Unusual Event After Hurricane Warning Lifted for Area.Plant Had Been Placed in Hot Shutdown Due to Predicted Hurricane Track.Unit 2 Commenced Restart on 990831 PNO-II-99-033, on 990830,Hurricane Dennis Was Located Approx 72 Miles Southeast of Bsep.No Significant Damage Has Been Sustained at Site.Ge Facility Suspended Fuel Fabrication Processes & No Significant Damage Was Sustained1999-08-30030 August 1999 PNO-II-99-033:on 990830,Hurricane Dennis Was Located Approx 72 Miles Southeast of Bsep.No Significant Damage Has Been Sustained at Site.Ge Facility Suspended Fuel Fabrication Processes & No Significant Damage Was Sustained IR 05000324/19990051999-08-27027 August 1999 Insp Repts 50-324/99-05 & 50-325/99-05 on 990620-0731.Two Violations Noted Being Treated as Ncv.Major Areas Inspected: Operations,Maint & Plant Support IR 05000324/19990041999-07-19019 July 1999 Insp Repts 50-324/99-04 & 50-325/99-04 on 990509-0619. Non-cited Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support.Includes Results of Y2K Readiness Program Review IR 05000324/19990031999-06-0707 June 1999 Insp Repts 50-324/99-03 & 50-325/99-03 on 990328-0508.Two Violations Noted & Being Treated as non-cited Violations. Major Areas Inspected:Aspects of Licensee Operations,Maint, Engineering & Plant Support IR 05000324/19990021999-04-26026 April 1999 Forwards Insp Repts 50-324/99-02 & 50-325/99-02 on 990214-0327.No Violations Noted.Major Areas Inspected: Licensee Operation,Engineering,Maint & Plant Support IR 05000324/19980141999-03-18018 March 1999 Insp Repts 50-324/98-14 & 50-325/98-14 on 990111-15,25 & 29. No Violations Noted.Major Areas Inspected:Licensee Calculations,Analysis,Performance Test Procedures & Other Engineering Activities IR 05000324/19990011999-03-15015 March 1999 Insp Repts 50-324/99-01 & 50-325/99-01 on 990103-0213.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000324/19980111999-01-28028 January 1999 Insp Repts 50-324/98-11 & 50-325/98-11 on 981122-990102.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint & Plant Support ML20198P0261998-12-21021 December 1998 Notice of Violation from Insp on 981011-1121.Violation Noted:On 981030,licensee Failed to Correctly Shutdown & Verify That Unit 1 Standby Gas Treatment Sys in Standby Alignment Per Section 7.1 of Procedure 1OP-10 IR 05000324/19980101998-12-21021 December 1998 Insp Repts 50-324/98-10 & 50-325/98-10 on 981011-1121. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support.Also Includes Results of Engineering & Health Physics Insp PNO-II-98-050, on 981123,licensee Declared Notification of Unusual Event,Due to Release of Chlorine Gas from Svc Water Injection Sys in Chlorination Bldg.Personnel Were Moved to Alternate Locations Away from Gas Leak,As Precautionary1998-11-24024 November 1998 PNO-II-98-050:on 981123,licensee Declared Notification of Unusual Event,Due to Release of Chlorine Gas from Svc Water Injection Sys in Chlorination Bldg.Personnel Were Moved to Alternate Locations Away from Gas Leak,As Precautionary IR 05000324/19980131998-11-24024 November 1998 Partially Withheld Insp Repts 50-324/98-13 & 50-325/98-13 on 981026-30 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Aspects of Licensee Plant Support IR 05000324/19980091998-11-0909 November 1998 Insp Repts 50-324/98-09 & 50-325/98-09 on 980830-1010. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support ML20195G4191998-11-0909 November 1998 Notice of Violation from Insp on 980830-1010.Violation Noted:On 980916,licensee Failed to Perform Section 7.1.5 of Procedure OMST-RHR-28Q as Required When Returning Flow Transmitter E11-FT-3338 to Service IR 05000324/19980081998-09-28028 September 1998 Insp Repts 50-324/98-08 & 50-325/98-08 on 980719-0829.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support PNO-II-98-039D, on 980827,update on Hurricane Bonnie Made. Walkdowns Confirmed,No Significant Damage to Security Barriers.Licensee Preparations for Plant Restart Continuing, Including Restoration of Warning Sirens1998-08-27027 August 1998 PNO-II-98-039D:on 980827,update on Hurricane Bonnie Made. Walkdowns Confirmed,No Significant Damage to Security Barriers.Licensee Preparations for Plant Restart Continuing, Including Restoration of Warning Sirens PNO-II-98-039C, on 980827,update on Hurricane Bonnie Made. No Significant Damage Has Occurred at Brunswick Plant or GE Fuel Fabrication Facility.Licensee Continues to Staff Technical Support Ctr & Emergency Operations Facility1998-08-27027 August 1998 PNO-II-98-039C:on 980827,update on Hurricane Bonnie Made. No Significant Damage Has Occurred at Brunswick Plant or GE Fuel Fabrication Facility.Licensee Continues to Staff Technical Support Ctr & Emergency Operations Facility PNO-II-98-039B, on 980826,update on Hurricane Bonnie Made. Hurricane Force Winds Have Been Experienced at Site,But No Significant Damage Has Occurred.Licensee Continues to Staff Emergency Facilities.No Other Damage Has Been Reported1998-08-26026 August 1998 PNO-II-98-039B:on 980826,update on Hurricane Bonnie Made. Hurricane Force Winds Have Been Experienced at Site,But No Significant Damage Has Occurred.Licensee Continues to Staff Emergency Facilities.No Other Damage Has Been Reported PNO-II-98-039A, on 980826,update on Hurricane Bonnie Made. Brunswick Resident Inspectors & One Regional Inspector Remain on Site to Monitor Licensee Activities.Region II State Liaison Officer Arrived in Raleigh Area1998-08-26026 August 1998 PNO-II-98-039A:on 980826,update on Hurricane Bonnie Made. Brunswick Resident Inspectors & One Regional Inspector Remain on Site to Monitor Licensee Activities.Region II State Liaison Officer Arrived in Raleigh Area PNO-II-98-039, on 980525,preparations for Hurricane Bonnie Made.Licensee Monitoring Progress of Hurricane in Order to Have Both Units in Cold Shutdown Three H Prior to Arrival of Hurricane Force Winds on Site1998-08-25025 August 1998 PNO-II-98-039:on 980525,preparations for Hurricane Bonnie Made.Licensee Monitoring Progress of Hurricane in Order to Have Both Units in Cold Shutdown Three H Prior to Arrival of Hurricane Force Winds on Site IR 05000324/19980071998-08-11011 August 1998 Insp Repts 50-324/98-07 & 50-325/98-07 on 980607-0718. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20237B9211998-08-11011 August 1998 Notice of Violation from Insp on 980607-0718.Violation Noted:Licensee Failed to Accomplish Activities Affecting Quality in Accordance W/Documented Instructions in Procedures for Listed Examples IR 05000324/19980061998-07-0606 July 1998 Insp Repts 50-324/98-06 & 50-325/98-06 on 980426-0606. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20236N9451998-07-0606 July 1998 Notice of Violations from Insp on 980426-0606.Violations Noted:On 980521,licensee Made Temporary Procedure Change That Altered Intent of Maint Surveillance Test 1MST-DG11R, DG-1 Loading Test,By Substituting 25 for 50 Horsepower Load IR 05000324/19983001998-06-15015 June 1998 NRC Operator Licensing Exam Repts 50-324/98-300 & 50-325/98-300 on 980508-15.Six SRO & Four RO Candidates Tested.All Passed Exam.One Candidate Identified as Having Some Performance Weaknesses ML20249A2191998-06-0101 June 1998 Notice of Violation from Insp on 980315-0425.Violation Noted:On 980331 Licensee Failed to Accomplish Scaffolding Erection Activities in Accordance W/Documented Procedure OMMM-022 IR 05000324/19980051998-06-0101 June 1998 Insp Repts 50-324/98-05 & 50-325/98-05 on 980315-0425. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20216H4431998-04-16016 April 1998 Insp Repts 50-324/98-04 & 50-325/98-04 on 980209-13,0309-12 & 16-20.Violations Noted.Major Areas inspected:follow-up on Licensee Corrective Actions for Electrical Equipment Environ Qualification & Review of Instrument Response Time Testing ML20216H4341998-04-16016 April 1998 Notice of Violation from Insp on 980209-13,0309-12 & 16-20. Violation Noted:On 970603,licensee Failed to Accomplish Activities Affecting Quality in Accordance W/Procedure EGR-NGGC-0005 IR 05000324/19980031998-04-13013 April 1998 Insp Repts 50-324/98-03 & 50-325/98-03 on 980201-0314.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support.Also Includes Results of Health Physics Insp by Regional Inspectors ML20217C8011998-03-16016 March 1998 Notice of Violation from Insp on 980126-30.Violation Noted: Rev 46 to Licensee Emergency Plan Decreased Effectiveness of Plan That Adopted Regulatory Provision for Biennial Exercise ML20217C8061998-03-16016 March 1998 Insp Repts 50-324/98-01 & 50-325/98-01 on 980126-30. Violations Noted.Major Areas Inspected:Emergency Preparedness Exercise ML20216B1741998-03-0202 March 1998 Insp Repts 50-324/97-15 & 50-325/97-15 on 971228-980131. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support ML20216B1621998-03-0202 March 1998 Notice of Violation from Insp on 971228-980131.Violation Noted:On 971203 & 971230,for Unit 1 & 971203,971210 & 971220 & 980104 for Unit 2,Condition Repts Were Not Initiated to Address Repetitive Failures of Plant Computer ML20202D3161998-02-0505 February 1998 Omitted Page 42 to Insp Repts 50-324/97-13 & 50-325/97-13 Transmitted on 980123 IR 07100109/20120271998-01-23023 January 1998 Notice of Violation from Insp on 971109-1227.Violation Noted:On 971209,inspector Determined That Licensee Had Not Maintained Data Sheets or Logs for Equipment Alignment ML20199G7501998-01-23023 January 1998 Insp Repts 50-324/97-13 & 50-325/97-13 on 971109-1227. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support.Includes Results of Maint, Engineering & FP Insps ML20198N6461997-12-30030 December 1997 Notice of Violation from Insp on 971209-12.Violation Noted: on 971118,locked High Radiation Area Was Left Unattended & Entrance Was Not Secured W/Designated Special cal-core Locks Prior to Leaving Area Unguarded ML20198N6561997-12-30030 December 1997 Insp Repts 50-324/97-14 & 50-325/97-14 on 971209-12. Violations Noted.Major Areas Inspected:Radiation Protection & Chemistry Controls,Miscellaneous Radiation Protection & Chemistry Issues & Mgt Meetings IR 05000324/19970141997-12-30030 December 1997 Insp Repts 50-324/97-14 & 50-325/97-14 on 971209-12. Violations Noted.Major Areas Inspected:Radiation Protection & Chemistry Controls,Miscellaneous Radiation Protection & Chemistry Issues & Mgt Meetings ML20198P0561997-12-23023 December 1997 NOV from Insp Completed on 971113.Violation Noted:Licensee Failed to Promptly Correct Condition Adverse to Quality Re Unit 1 High Drywell Temp Condition ML20197H1691997-12-0808 December 1997 Notice of Violation from Insp on 970928-1108.Violation Noted:On 970923,torus Master clearance,2-97-555 Was Not Adequate to Prevent Draining of Water Into Unit 2 Torus 1999-09-15
[Table view] |
Text
.
f,yd "%.,, ',
c, UNIT E D STAT E S NUCLEAR ntGULATORY COMMisst0N y n HtGION H
$ .j 101 M AFilfiT A $1M t7. N i
,
- jf AT LANT A, GE OHot A 30323 %,
/
NOV - 7 igT Report Nos.:
50-325/92-42 and 50-324/92-42 Licensee: Carolina Power and Light Company D. O. Box 1551 ,
Raleigh, NC 27602 Docket Nos.: 50 325 and 50-324 License Nos.: DPR-71 and DPR-62 Facility Name: Brunswick 1 and 2 Inspection Conducted: November 16-20, 1992 Inspector: .
-j Paul JTT FT h - 4
'
la//_,T[iigneT e<
t Approved by: 7h2 STijs ob#M*b RITton # 'O "/4 7 Thief-~ ~ ~
l ate signed ~
Plant Systems Section Engineering Branch Division of Reactor Safety SUMMARY Scope:
Thistechnical and routine, announced inspection was conducted in the areas of engineering support. The implementation of modifications and repair work on electrical systems was inspecte Results:
In the areas inspected, violations or deviations were not identified. Good effort in identification and resolution of equipment problems was noted, for example, in the current transformer replacement project (section 2b).
9212140071 921204 PDR O ADOCK 0500032 PDR
.
_
- __ _____-_- _
.
REPORT DETAILS Persons Contacted Licensee Employees P. Berry, Procuremer.t Engineer C. Bowen, Systems Engineer
- J. Brown, General Manager Unit 2 J. Cannon, Systems Engineer J. Deitrick, Supervisor, Electrical Analysis R. Drew, Systems Engineer
- S. Floyd, Manager, Regulatory Compliance T. Jones, Sr. Specialist, Regulatory Compliance
- J. Leininger, Site Manager, Nuclear Engineering Department
- G. Miller, Manager, Systems Engineering
- R. Morgar., General Manager Unit 1 J. O'Connor, Electrical Unit Manager, Nuclear Engineering Ocpartment
- S. Tabor, Sr. Specialist, Regulatory Compliance W. Shade, Sr. Electrical Engineer, Nuclear Engineering Department T. Simonson, Systems Engineer Other licensee employees contacted during this inspection included engineers, security force members, technicians, and administrative personnel, NRC Resident inspector
- Attended exit interview Engineering and Technical Support (3T/00)
Engineering and technical support activities were evaluated using four projects related to electrical systems as examples. The four projects were:
>
Replacement of bt.tteries which were approaching end of useful life
- Replacement of defective current transformers
-
Installation of control switches to allow quick interconnection of Unit 1 and Unit 2 buses in a blackout scenario
Root cause analysis and repairs to non safety-related uninterruptible power supplies, Replacement of the safety related batteries Due to the fact that the safety-related 250/125V batteries in Unit 2 were approaching the end of their service life (they were approximately 17 years old), the batteries were replaced in late-
- - _ _ _ _ _ _ _ _ _ _ - _ _ _ _ . l
_
'
.
199 The new batteries were model NCX-17 manufactured by Gil0 Batteries, Inc and they had a 1200 A-H ratin They were essentially identical to the batteries they replace lhe Unit 1 batteries were the same model number and age as the Unit 2 batterie The Unit 1 batteries were scheduled for replacement with new NCX-17's in early 1993. The Unit 1 batteries were on-site at the time of the inspectinn and were undergoing conditioning procedure The batteries installed in Unit 2 were purchased commercial grade from GNB 3atteries, Inc. because the manufacturer did not offer safety related batteries at the time the purchase order was placed. Licensees are allowed to purchase. comrarcial grade equipment for installation in safety-related systems as long as the equipment is found acceptable by careful evaluation known as a dedication process. This dedication process included three major elements:
(1) A review of GNB's quality assurance program of commercial grade batterie Seismic qualification was include (2) Receipt inspections defined by the enginee (3) Testing of certain parts at CP&L's test facilit The NRC inspector reviewed the details of the dedication process and concluded that it was adequat Acceptance capacity tests were performed at the factory and a service test was performed after installation. The NRC inspector reviewed the results of both these tests, and found them acceptabl When the purchase order was placed for the Unit 1 batteries, GNB Batteries incorporated had a contract with Nuclear Logistics, In (NLI) of Fort Worth, Texas, to provide a quality assurance program which would allow upgrading the commercial grade batteries to safety-related batteries. Therefore, the Unit I batteries were purchased safety-related. After manufacture the batteries were shipped to NLI for acceptance capacity testing. At-the time the Brunswick batteries were 7,t NL1 for testing, NLl's testing program had identified a problem with the one minute ratings published by GHB for the NCX series of_ batteries. For example, NLI demonstrated that the.NCX-17 had a one-minute capacity of 1165 Amperes instead of the originally published capacity of 1306 Ampere The error that GNB had been making was that they were not considering the momentary voltage dip caused by the Coup de Feuet effect when determining the one minute rating. The performance tests were performed by GNB in such a manner that they did not detect _the Coup de Fouet effect. NLl-issued a report pursuant to 10 CFR 21 regarding the revised one-minute rate The
. , , _ _.._.-_ - _ _ _ _
. _ . . . - . . _ . - - - . - . -_ . . . - . _ . .. . - - - - .- .- -
-
- .
.
l 3
'
NRC performed an inspection at the GNB factory to investigate this .
] matter in August,1992. Results of this inspection are contained in NRC Inspection Report 99901251/92 01.
i The licensee has evaluated the impact of the reduced one-minute
- rating for their particular application. Their conclusion was 4 that the batteries remain OPERABLE and that only the excess
,
capacity margin was reduced. The NRC inspector reviewed this i evaluation and agreed that the conclusion was correct, i The licensee's procedure for the service test to be performed at i 18 month intervals acccrding to the Technical Specification was also reviewed. The inspector focused on the procedure steps, test
'
- e.1uipment and criteria with regard to the first minute. The test i set applied the proper value of current and was progrunmed to stop the test if the voltage went below 105V at any time. The test was
- in conc 3rt with the system voltage calculations which assumed a minimum battery voltage of 105V throughout the duty cycle.
'
Therefore, the test procedure was good in that it empirically demonstrated that the battery could deliver the design current and voltage.
- Repl1 cement of Safety Related Current Transformers (CT's)
During the course of performing routine maintenance inspections of
, the 4KV switchgear, the licensee noticed cracks on the case of a current transformer which was mounted in the cable compartmen Then special inspections on that same day identified twenty-two cracked current transformers. In all these cases, the cracks
- could be seen at the top of the CT, and penetrated the secondary
, winding potting compoun The discoveries were made on
. february 21, 1991, i On April 9, 1991, ASEA Brown Boveri (ABB), the manufacturer of the CT's, issued a Part 21 Report which addressed the same type CT's i
installed at Brunswick. A su)plerentary Part 21 Report was issued
. April 30, 1991. In essence t iese reports state that the surface
'
'
cracks on the CT's could result in reduced Basic impulse Level (BIL) of the CT. They also recommended that the older CT's which -
i had epoxy insulation be replaced with the newer model which had
- polyurethane based insulation. Only CT's which exhibited the
'
cracking needed to be replaced. Periodic inspections will
- continue.
! At the time of the inspection the licensee had identified 39 l cracked CT's. At least 27 of these had already been replace All the cracked CT's would be replaced before startup of tho l lini ts . The inspector randomly selected two switchgear
- compartnznts to conflem that the changeout work had been done.
The compartments selected were:
,
a Residual lieat Removal Service Water Pump 2B
.
,
,m- ..rc.w.- -~.- - - , -,--m--c-- , ,m , ,, or -on -e v wve .*,,
, .
!
- The inspector observed that the work had been properly don i
! Records indicated that each new CT was thoroughly tested at the
<
iactory and received ratio and insulation reststance tests at the j site.
$ The evolution described above represents good effort on the part of the licensee in identification and resolution of equipment l problems. A potential problem was identified during the cours9 of
,
preventive maintenance inspections by a craftsman, it was reported
'
to the appropriate individuals, aggressive followup was conducted
and conservative actions were take : c. Installation of Control Switches to Allow Quick Interconnection of i Unit 1 and Unit 2 Buses in a " Station Blackout" Scenari Acr.ording to the licensee's submittal made pursuant to
<
10 CFR 50.63, Loss of all alternating current power, the licensee has installed new local control switches to allow quick interconnection of the Unit I and Unit 2 buses as part of a
'
- strategy for coping with loss of all AC power on one Unit. The
>
'
interconnecting bus duct and circuit breakers had been installed
. since original construction, but the breakers had been maintained racked out. The new local control switches were fully operational at the time of the inspection,
, The inspector interviewed the cognizant engineers to ascertain i that all appropriate design considerations were addre:. sed, that an adequate test program was carried out and that operators were properly trained on use of the new switches. The inspector also i walked down the switchgear to confirm that the switch nameplates were correct.
l d. Repairs to Uninterruptible Power Supplies lA, IB, 2A and 28.
i I
' Unit 1 experienced an automatic reactor scram in January, 199 lhe initiating event was a malfunction in the non-safety-related
,
vital bus uninterruptible power supply (UPS) primary power source.
l Root cause analysis which was carried out by the licensee and the i manufacturer concluded that two printed circuit cards had failed.
I The modulation index control MIC card for phase "A" was found to have a defective capacitor. The manufacturer has no' history of
, failures of the Mit card to indicate a problem with components or
'
workmanshi They believe that the failure of this card was due to random component failure. Nevertheless, the licensee has elected to replace the MIC cards in all the VPS. One reason for this decision was that the capacitors could be exhibiting deterioration due to aging. At the time of the inspection, 9 of the 12 HIC cards had been replaced.
!
,- - . , . - - . ~ . -
_
. .
,
..
The synchronizer card was found to have a defective integrated circuit. The licensee has replaced the synchronizer cards in all UPSs with ones having a more rugged chi In addition to the replacement of parts, additional testing and alignment was conducted by the manufacturer and CP&L personnel on the 1A UP The inspector concluded that the root cause analysis of the UPS failure and subsequent corrective actions were adequat . Exit Interview The inspection scope and results were summarized on November 20, 1992, with those persons indicated in paragraph 1. The inspector described the areas inspected and discussed in detail the inspection result proprietary information is not contained in this report.