Category:INSPECTION REPORT
MONTHYEARIR 05000324/19990061999-10-0606 October 1999 Insp Repts 50-324/99-06 & 50-325/99-06 on 990801-0911.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000324/19990051999-08-27027 August 1999 Insp Repts 50-324/99-05 & 50-325/99-05 on 990620-0731.Two Violations Noted Being Treated as Ncv.Major Areas Inspected: Operations,Maint & Plant Support IR 05000324/19990041999-07-19019 July 1999 Insp Repts 50-324/99-04 & 50-325/99-04 on 990509-0619. Non-cited Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support.Includes Results of Y2K Readiness Program Review IR 05000324/19990031999-06-0707 June 1999 Insp Repts 50-324/99-03 & 50-325/99-03 on 990328-0508.Two Violations Noted & Being Treated as non-cited Violations. Major Areas Inspected:Aspects of Licensee Operations,Maint, Engineering & Plant Support IR 05000324/19990021999-04-26026 April 1999 Forwards Insp Repts 50-324/99-02 & 50-325/99-02 on 990214-0327.No Violations Noted.Major Areas Inspected: Licensee Operation,Engineering,Maint & Plant Support IR 05000324/19980141999-03-18018 March 1999 Insp Repts 50-324/98-14 & 50-325/98-14 on 990111-15,25 & 29. No Violations Noted.Major Areas Inspected:Licensee Calculations,Analysis,Performance Test Procedures & Other Engineering Activities IR 05000324/19990011999-03-15015 March 1999 Insp Repts 50-324/99-01 & 50-325/99-01 on 990103-0213.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000324/19980111999-01-28028 January 1999 Insp Repts 50-324/98-11 & 50-325/98-11 on 981122-990102.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint & Plant Support IR 05000324/19980101998-12-21021 December 1998 Insp Repts 50-324/98-10 & 50-325/98-10 on 981011-1121. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support.Also Includes Results of Engineering & Health Physics Insp IR 05000324/19980131998-11-24024 November 1998 Partially Withheld Insp Repts 50-324/98-13 & 50-325/98-13 on 981026-30 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Aspects of Licensee Plant Support IR 05000324/19980091998-11-0909 November 1998 Insp Repts 50-324/98-09 & 50-325/98-09 on 980830-1010. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000324/19980081998-09-28028 September 1998 Insp Repts 50-324/98-08 & 50-325/98-08 on 980719-0829.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000324/19980071998-08-11011 August 1998 Insp Repts 50-324/98-07 & 50-325/98-07 on 980607-0718. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000324/19980061998-07-0606 July 1998 Insp Repts 50-324/98-06 & 50-325/98-06 on 980426-0606. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000324/19980051998-06-0101 June 1998 Insp Repts 50-324/98-05 & 50-325/98-05 on 980315-0425. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20216H4431998-04-16016 April 1998 Insp Repts 50-324/98-04 & 50-325/98-04 on 980209-13,0309-12 & 16-20.Violations Noted.Major Areas inspected:follow-up on Licensee Corrective Actions for Electrical Equipment Environ Qualification & Review of Instrument Response Time Testing IR 05000324/19980031998-04-13013 April 1998 Insp Repts 50-324/98-03 & 50-325/98-03 on 980201-0314.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support.Also Includes Results of Health Physics Insp by Regional Inspectors ML20217C8061998-03-16016 March 1998 Insp Repts 50-324/98-01 & 50-325/98-01 on 980126-30. Violations Noted.Major Areas Inspected:Emergency Preparedness Exercise ML20216B1741998-03-0202 March 1998 Insp Repts 50-324/97-15 & 50-325/97-15 on 971228-980131. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support ML20202D3161998-02-0505 February 1998 Omitted Page 42 to Insp Repts 50-324/97-13 & 50-325/97-13 Transmitted on 980123 ML20199G7501998-01-23023 January 1998 Insp Repts 50-324/97-13 & 50-325/97-13 on 971109-1227. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support.Includes Results of Maint, Engineering & FP Insps ML20198N6561997-12-30030 December 1997 Insp Repts 50-324/97-14 & 50-325/97-14 on 971209-12. Violations Noted.Major Areas Inspected:Radiation Protection & Chemistry Controls,Miscellaneous Radiation Protection & Chemistry Issues & Mgt Meetings IR 05000324/19970141997-12-30030 December 1997 Insp Repts 50-324/97-14 & 50-325/97-14 on 971209-12. Violations Noted.Major Areas Inspected:Radiation Protection & Chemistry Controls,Miscellaneous Radiation Protection & Chemistry Issues & Mgt Meetings ML20197H1881997-12-0808 December 1997 Insp Repts 50-324/97-12 & 50-325/97-12 on 970928-1108. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000324/19970111997-10-27027 October 1997 Insp Repts 50-324/97-11 & 50-325/97-11 on 970819-0927. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000324/19970091997-09-15015 September 1997 Insp Repts 50-324/97-09 & 50-325/97-09 on 970706-0816. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support Re Improper Processing of Changes to Fire Protection Instrumentation Surveillance IR 05000324/19970101997-08-0808 August 1997 Insp Repts 50-324/97-10 & 50-325/97-10 on 970728-30.No Violations Noted.Major Areas Inspected:Plant Support ML20198F4101997-08-0101 August 1997 Insp Repts 50-324/97-08 & 50-325/97-08 on 970525-0705. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000324/19970071997-06-20020 June 1997 Integrated Insp Repts 50-324/97-07 & 50-325/97-07 on 970413-0524.No Violations Noted.Major Areas Inspected: Licensee Operations,Engineering,Maint & Plant Support ML20140D1781997-05-12012 May 1997 Insp Repts 50-324/97-05 & 50-325/97-05 on 970302-0412. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000324/19970061997-05-0909 May 1997 Safeguards Insp Repts 50-324/97-06 & 50-325/97-06 on 970409-11.No Violations Noted.Major Areas Inspected:Aspects of Licensee Plant Support,Status of Security Facilities & Equipment ML20138J5981997-05-0202 May 1997 Insp Repts 50-324/97-03 & 50-325/97-03 on 970303-0404. Violations Noted.Major Areas Inspected:Review of Licensee Engineering Activities to Support Operation of Plant EQ Program & Followup on Previous Insp Findings IR 05000324/19970041997-04-0404 April 1997 Safeguard Insp Repts 50-324/97-04 & 50-325/97-04 on 970303-07.No Violations Noted.Major Areas Inspected:Plant Support & Security & Safeguards Procedures & Documentation ML20137T5711997-03-31031 March 1997 Insp Repts 50-324/97-02 & 50-325/97-02 on 970119-0301. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering,Plant Support & Emergency Preparedness ML20134P1551997-02-14014 February 1997 Insp Repts 50-324/96-18 & 50-325/96-18 on 961208-970118. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20133L5931997-01-0909 January 1997 Errata to Insp Repts 50-324/96-15 & 50-325/96-15 on 960915- 1026.Statement in Executive Summary Under Operations Could Be Construed to Convey Wrong Meaning.Corrective Page to Be Inserted Encl ML20133H4881997-01-0202 January 1997 Insp Repts 50-324/96-16 & 50-325/96-16 on 961027-1207. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20132G8751996-12-13013 December 1996 Insp Repts 50-324/96-17 & 50-325/96-17 on 961113-15. Violations Noted.Major Areas Inspected:Damaged Locks & Licensee Actions IR 05000324/19960151996-11-22022 November 1996 Insp Repts 50-324/96-15 & 50-325/96-15 on 960915-1026. Violations Noted.Major Areas Inspected:License Operations, Engineering,Maint & Plant Support ML20129H1081996-10-11011 October 1996 Insp Repts 50-324/96-13 & 50-325/96-13 on 960804-0914. Violations Noted.Major Areas Inspected:Aspects of Operations,Engineering,Maint & Plant Support ML20134D3981996-10-0404 October 1996 Insp Repts 50-324/96-14 & 50-325/96-14 on 960624-0823. Violations Noted.Major Areas Inspected:Review of Licensees EQ Program & Followup on Previous Inspection Findings IR 05000324/19910061996-04-11011 April 1996 Insp Repts 50-324/91-06 & 50-325/91-06 on 910301-31.No Violations Noted.Major Areas Inspected:Maint,Surveillance Observation,Operation Safety Verification,Onsite Review Committee,Onsite Followup of Events IR 05000324/19940331994-12-21021 December 1994 Partially Withheld Insp Repts 50-324/94-33 & 50-325/94-33 on 941024-28 & 1121-23 (Ref 10CFR73.21).No Violations Noted. Major Areas Inspected:Protected & Vital Area Access Control of Personnel & Packages IR 05000324/19930561993-12-27027 December 1993 Insp Repts 50-324/93-56 & 50-325/93-56 on 931129-1203.No Violations Identified.Major Areas Inspected:Chemistry/ Effluent Department,Plant Water Chemistry,Radioactive Material Processing & Shipping IR 05000324/19930571993-12-22022 December 1993 Insp Repts 50-324/93-57 & 50-325/93-57 on 931129-1203. Violations Noted.Major Areas Inspected:Electrical Maintenance & Mod.Startup Open Item F2 Neutron Detector Repairs & Inspector Followup Item 92-46-01 Reviewed IR 05000324/19930531993-12-10010 December 1993 Insp Repts 50-324/93-53 & 50-325/93-53 on 931115-19.No Violations Noted.Major Areas Inspected:Employee Concerns Program & Actions on Previous Insp Findings IR 05000324/19930491993-11-24024 November 1993 Insp Repts 50-325/93-49 & 50-324/93-49 on 931009-31. Violations Noted But Not Cited.Major Areas Inspected: Maintenance,Operations,Onsite Review Committee & three-year Plan IR 05000324/19930471993-11-22022 November 1993 Partially Withheld Insp Repts 50-324/93-47 & 50-325/93-47 on 931004-08.Noncited Violation Identified.Major Areas Inspected:Physical Security Programs for Power Reactors,Mgt Support,Audits,Protected & Vital Area Barriers IR 05000324/19930501993-11-17017 November 1993 Insp Repts 50-324/93-50 & 50-325/93-50 on 931025-29.No Violations Noted.Major Areas Inspected:Investigation of Unit 2 Fuel Pool Leakage Problem,Tendon Surveillance Program & Followup on Previous Insp Findings IR 05000324/19930511993-11-10010 November 1993 Insp Repts 50-324/93-51 & 50-325/93-51 on 931025-29.No Violations Noted.Major Areas Inspected:Isi Review of Visual Exam Data & Evaluations for Select Welds in Unit 1 Reactor Vessel Shroud 1999-08-27
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000324/19990061999-10-0606 October 1999 Insp Repts 50-324/99-06 & 50-325/99-06 on 990801-0911.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000324/19990051999-08-27027 August 1999 Insp Repts 50-324/99-05 & 50-325/99-05 on 990620-0731.Two Violations Noted Being Treated as Ncv.Major Areas Inspected: Operations,Maint & Plant Support IR 05000324/19990041999-07-19019 July 1999 Insp Repts 50-324/99-04 & 50-325/99-04 on 990509-0619. Non-cited Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support.Includes Results of Y2K Readiness Program Review IR 05000324/19990031999-06-0707 June 1999 Insp Repts 50-324/99-03 & 50-325/99-03 on 990328-0508.Two Violations Noted & Being Treated as non-cited Violations. Major Areas Inspected:Aspects of Licensee Operations,Maint, Engineering & Plant Support IR 05000324/19990021999-04-26026 April 1999 Forwards Insp Repts 50-324/99-02 & 50-325/99-02 on 990214-0327.No Violations Noted.Major Areas Inspected: Licensee Operation,Engineering,Maint & Plant Support IR 05000324/19980141999-03-18018 March 1999 Insp Repts 50-324/98-14 & 50-325/98-14 on 990111-15,25 & 29. No Violations Noted.Major Areas Inspected:Licensee Calculations,Analysis,Performance Test Procedures & Other Engineering Activities IR 05000324/19990011999-03-15015 March 1999 Insp Repts 50-324/99-01 & 50-325/99-01 on 990103-0213.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000324/19980111999-01-28028 January 1999 Insp Repts 50-324/98-11 & 50-325/98-11 on 981122-990102.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint & Plant Support IR 05000324/19980101998-12-21021 December 1998 Insp Repts 50-324/98-10 & 50-325/98-10 on 981011-1121. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support.Also Includes Results of Engineering & Health Physics Insp IR 05000324/19980131998-11-24024 November 1998 Partially Withheld Insp Repts 50-324/98-13 & 50-325/98-13 on 981026-30 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Aspects of Licensee Plant Support IR 05000324/19980091998-11-0909 November 1998 Insp Repts 50-324/98-09 & 50-325/98-09 on 980830-1010. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000324/19980081998-09-28028 September 1998 Insp Repts 50-324/98-08 & 50-325/98-08 on 980719-0829.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000324/19980071998-08-11011 August 1998 Insp Repts 50-324/98-07 & 50-325/98-07 on 980607-0718. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000324/19980061998-07-0606 July 1998 Insp Repts 50-324/98-06 & 50-325/98-06 on 980426-0606. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000324/19980051998-06-0101 June 1998 Insp Repts 50-324/98-05 & 50-325/98-05 on 980315-0425. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20216H4431998-04-16016 April 1998 Insp Repts 50-324/98-04 & 50-325/98-04 on 980209-13,0309-12 & 16-20.Violations Noted.Major Areas inspected:follow-up on Licensee Corrective Actions for Electrical Equipment Environ Qualification & Review of Instrument Response Time Testing IR 05000324/19980031998-04-13013 April 1998 Insp Repts 50-324/98-03 & 50-325/98-03 on 980201-0314.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support.Also Includes Results of Health Physics Insp by Regional Inspectors ML20217C8061998-03-16016 March 1998 Insp Repts 50-324/98-01 & 50-325/98-01 on 980126-30. Violations Noted.Major Areas Inspected:Emergency Preparedness Exercise ML20216B1741998-03-0202 March 1998 Insp Repts 50-324/97-15 & 50-325/97-15 on 971228-980131. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support ML20202D3161998-02-0505 February 1998 Omitted Page 42 to Insp Repts 50-324/97-13 & 50-325/97-13 Transmitted on 980123 ML20199G7501998-01-23023 January 1998 Insp Repts 50-324/97-13 & 50-325/97-13 on 971109-1227. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support.Includes Results of Maint, Engineering & FP Insps ML20198N6561997-12-30030 December 1997 Insp Repts 50-324/97-14 & 50-325/97-14 on 971209-12. Violations Noted.Major Areas Inspected:Radiation Protection & Chemistry Controls,Miscellaneous Radiation Protection & Chemistry Issues & Mgt Meetings IR 05000324/19970141997-12-30030 December 1997 Insp Repts 50-324/97-14 & 50-325/97-14 on 971209-12. Violations Noted.Major Areas Inspected:Radiation Protection & Chemistry Controls,Miscellaneous Radiation Protection & Chemistry Issues & Mgt Meetings ML20197H1881997-12-0808 December 1997 Insp Repts 50-324/97-12 & 50-325/97-12 on 970928-1108. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000324/19970111997-10-27027 October 1997 Insp Repts 50-324/97-11 & 50-325/97-11 on 970819-0927. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000324/19970091997-09-15015 September 1997 Insp Repts 50-324/97-09 & 50-325/97-09 on 970706-0816. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support Re Improper Processing of Changes to Fire Protection Instrumentation Surveillance IR 05000324/19970101997-08-0808 August 1997 Insp Repts 50-324/97-10 & 50-325/97-10 on 970728-30.No Violations Noted.Major Areas Inspected:Plant Support ML20198F4101997-08-0101 August 1997 Insp Repts 50-324/97-08 & 50-325/97-08 on 970525-0705. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000324/19970071997-06-20020 June 1997 Integrated Insp Repts 50-324/97-07 & 50-325/97-07 on 970413-0524.No Violations Noted.Major Areas Inspected: Licensee Operations,Engineering,Maint & Plant Support ML20140D1781997-05-12012 May 1997 Insp Repts 50-324/97-05 & 50-325/97-05 on 970302-0412. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000324/19970061997-05-0909 May 1997 Safeguards Insp Repts 50-324/97-06 & 50-325/97-06 on 970409-11.No Violations Noted.Major Areas Inspected:Aspects of Licensee Plant Support,Status of Security Facilities & Equipment ML20138J5981997-05-0202 May 1997 Insp Repts 50-324/97-03 & 50-325/97-03 on 970303-0404. Violations Noted.Major Areas Inspected:Review of Licensee Engineering Activities to Support Operation of Plant EQ Program & Followup on Previous Insp Findings IR 05000324/19970041997-04-0404 April 1997 Safeguard Insp Repts 50-324/97-04 & 50-325/97-04 on 970303-07.No Violations Noted.Major Areas Inspected:Plant Support & Security & Safeguards Procedures & Documentation ML20137T5711997-03-31031 March 1997 Insp Repts 50-324/97-02 & 50-325/97-02 on 970119-0301. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering,Plant Support & Emergency Preparedness ML20134P1551997-02-14014 February 1997 Insp Repts 50-324/96-18 & 50-325/96-18 on 961208-970118. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20133L5931997-01-0909 January 1997 Errata to Insp Repts 50-324/96-15 & 50-325/96-15 on 960915- 1026.Statement in Executive Summary Under Operations Could Be Construed to Convey Wrong Meaning.Corrective Page to Be Inserted Encl ML20133H4881997-01-0202 January 1997 Insp Repts 50-324/96-16 & 50-325/96-16 on 961027-1207. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20132G8751996-12-13013 December 1996 Insp Repts 50-324/96-17 & 50-325/96-17 on 961113-15. Violations Noted.Major Areas Inspected:Damaged Locks & Licensee Actions IR 05000324/19960151996-11-22022 November 1996 Insp Repts 50-324/96-15 & 50-325/96-15 on 960915-1026. Violations Noted.Major Areas Inspected:License Operations, Engineering,Maint & Plant Support ML20129H1081996-10-11011 October 1996 Insp Repts 50-324/96-13 & 50-325/96-13 on 960804-0914. Violations Noted.Major Areas Inspected:Aspects of Operations,Engineering,Maint & Plant Support ML20134D3981996-10-0404 October 1996 Insp Repts 50-324/96-14 & 50-325/96-14 on 960624-0823. Violations Noted.Major Areas Inspected:Review of Licensees EQ Program & Followup on Previous Inspection Findings IR 05000324/19910061996-04-11011 April 1996 Insp Repts 50-324/91-06 & 50-325/91-06 on 910301-31.No Violations Noted.Major Areas Inspected:Maint,Surveillance Observation,Operation Safety Verification,Onsite Review Committee,Onsite Followup of Events IR 05000324/19940331994-12-21021 December 1994 Partially Withheld Insp Repts 50-324/94-33 & 50-325/94-33 on 941024-28 & 1121-23 (Ref 10CFR73.21).No Violations Noted. Major Areas Inspected:Protected & Vital Area Access Control of Personnel & Packages IR 05000324/19930561993-12-27027 December 1993 Insp Repts 50-324/93-56 & 50-325/93-56 on 931129-1203.No Violations Identified.Major Areas Inspected:Chemistry/ Effluent Department,Plant Water Chemistry,Radioactive Material Processing & Shipping IR 05000324/19930571993-12-22022 December 1993 Insp Repts 50-324/93-57 & 50-325/93-57 on 931129-1203. Violations Noted.Major Areas Inspected:Electrical Maintenance & Mod.Startup Open Item F2 Neutron Detector Repairs & Inspector Followup Item 92-46-01 Reviewed IR 05000324/19930531993-12-10010 December 1993 Insp Repts 50-324/93-53 & 50-325/93-53 on 931115-19.No Violations Noted.Major Areas Inspected:Employee Concerns Program & Actions on Previous Insp Findings IR 05000324/19930491993-11-24024 November 1993 Insp Repts 50-325/93-49 & 50-324/93-49 on 931009-31. Violations Noted But Not Cited.Major Areas Inspected: Maintenance,Operations,Onsite Review Committee & three-year Plan IR 05000324/19930471993-11-22022 November 1993 Partially Withheld Insp Repts 50-324/93-47 & 50-325/93-47 on 931004-08.Noncited Violation Identified.Major Areas Inspected:Physical Security Programs for Power Reactors,Mgt Support,Audits,Protected & Vital Area Barriers IR 05000324/19930501993-11-17017 November 1993 Insp Repts 50-324/93-50 & 50-325/93-50 on 931025-29.No Violations Noted.Major Areas Inspected:Investigation of Unit 2 Fuel Pool Leakage Problem,Tendon Surveillance Program & Followup on Previous Insp Findings IR 05000324/19930511993-11-10010 November 1993 Insp Repts 50-324/93-51 & 50-325/93-51 on 931025-29.No Violations Noted.Major Areas Inspected:Isi Review of Visual Exam Data & Evaluations for Select Welds in Unit 1 Reactor Vessel Shroud 1999-08-27
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARPNO-II-99-045, on 991018,Hurricane Irene Was Located Approx 105 Miles East of Cape Hatteras,Nc.Ctr of Hurricane Was Estimated Near Latitude 35.6 North & Longitude 73.8 West. Storm Was Moving Northeast at 35 Mph1999-10-18018 October 1999 PNO-II-99-045:on 991018,Hurricane Irene Was Located Approx 105 Miles East of Cape Hatteras,Nc.Ctr of Hurricane Was Estimated Near Latitude 35.6 North & Longitude 73.8 West. Storm Was Moving Northeast at 35 Mph IR 05000324/19990061999-10-0606 October 1999 Insp Repts 50-324/99-06 & 50-325/99-06 on 990801-0911.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support PNO-II-99-037D, on 990915,Hurricane Floyd Was Located Approx 380 Miles Southeast of Wilmington,Nc.Ctr of Hurricane Was Estimated Near Latitude 28.8 North & Longitude 78.8 West. Storm Was Moving Northwest at 14 Mph.Max Winds Were 140 Mph1999-09-15015 September 1999 PNO-II-99-037D:on 990915,Hurricane Floyd Was Located Approx 380 Miles Southeast of Wilmington,Nc.Ctr of Hurricane Was Estimated Near Latitude 28.8 North & Longitude 78.8 West. Storm Was Moving Northwest at 14 Mph.Max Winds Were 140 Mph PNO-II-99-037E, on 990915,Hurricane Floyd Was Located Approx 380 Miles Southeast of Wilmington,Nc.Ctr of Hurricane Was Estimated Near Latitude 29.3 North & Longitude 78.8 West. Storm Was Moving north-northwest at 14 Mph1999-09-15015 September 1999 PNO-II-99-037E:on 990915,Hurricane Floyd Was Located Approx 380 Miles Southeast of Wilmington,Nc.Ctr of Hurricane Was Estimated Near Latitude 29.3 North & Longitude 78.8 West. Storm Was Moving north-northwest at 14 Mph PNO-II-99-037F, on 990915,Hurricane Floyd Was Located Approx 350 Miles Southeast of Wilmington,Nc.Ctr of Hurricane Was Estimated Near Latitude 29.9 North & Longitude 79.0 West. Storm Was Moving north-northwest at 14 Mph1999-09-15015 September 1999 PNO-II-99-037F:on 990915,Hurricane Floyd Was Located Approx 350 Miles Southeast of Wilmington,Nc.Ctr of Hurricane Was Estimated Near Latitude 29.9 North & Longitude 79.0 West. Storm Was Moving north-northwest at 14 Mph PNO-II-99-037H, on 990915,Hurricane Floyd Was Located Approx 168 Miles Southeast of Bsep.Ctr of Hurricane Was Estimated Near Latitude 31.3 North & Longitude 79.0 West.Storm Was Moving North at 17 Mph with Max Winds at 115 Mph1999-09-15015 September 1999 PNO-II-99-037H:on 990915,Hurricane Floyd Was Located Approx 168 Miles Southeast of Bsep.Ctr of Hurricane Was Estimated Near Latitude 31.3 North & Longitude 79.0 West.Storm Was Moving North at 17 Mph with Max Winds at 115 Mph PNO-II-99-037G, on 990915,Hurricane Floyd Was Located Approx 216 Miles Southeast of Bsep.Ctr of Hurricane Was Estimated Near Latitude 30.6 North & Longitude 79.1 West.Storm Was Moving north-northwest at 14 Mph with Max Winds at 125 Mph1999-09-15015 September 1999 PNO-II-99-037G:on 990915,Hurricane Floyd Was Located Approx 216 Miles Southeast of Bsep.Ctr of Hurricane Was Estimated Near Latitude 30.6 North & Longitude 79.1 West.Storm Was Moving north-northwest at 14 Mph with Max Winds at 125 Mph PNO-II-99-035, on 990830,util Secured from Notification of Unusual Event After Hurricane Warning Lifted for Area.Plant Had Been Placed in Hot Shutdown Due to Predicted Hurricane Track.Unit 2 Commenced Restart on 9908311999-08-31031 August 1999 PNO-II-99-035:on 990830,util Secured from Notification of Unusual Event After Hurricane Warning Lifted for Area.Plant Had Been Placed in Hot Shutdown Due to Predicted Hurricane Track.Unit 2 Commenced Restart on 990831 PNO-II-99-033, on 990830,Hurricane Dennis Was Located Approx 72 Miles Southeast of Bsep.No Significant Damage Has Been Sustained at Site.Ge Facility Suspended Fuel Fabrication Processes & No Significant Damage Was Sustained1999-08-30030 August 1999 PNO-II-99-033:on 990830,Hurricane Dennis Was Located Approx 72 Miles Southeast of Bsep.No Significant Damage Has Been Sustained at Site.Ge Facility Suspended Fuel Fabrication Processes & No Significant Damage Was Sustained IR 05000324/19990051999-08-27027 August 1999 Insp Repts 50-324/99-05 & 50-325/99-05 on 990620-0731.Two Violations Noted Being Treated as Ncv.Major Areas Inspected: Operations,Maint & Plant Support IR 05000324/19990041999-07-19019 July 1999 Insp Repts 50-324/99-04 & 50-325/99-04 on 990509-0619. Non-cited Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support.Includes Results of Y2K Readiness Program Review IR 05000324/19990031999-06-0707 June 1999 Insp Repts 50-324/99-03 & 50-325/99-03 on 990328-0508.Two Violations Noted & Being Treated as non-cited Violations. Major Areas Inspected:Aspects of Licensee Operations,Maint, Engineering & Plant Support IR 05000324/19990021999-04-26026 April 1999 Forwards Insp Repts 50-324/99-02 & 50-325/99-02 on 990214-0327.No Violations Noted.Major Areas Inspected: Licensee Operation,Engineering,Maint & Plant Support IR 05000324/19980141999-03-18018 March 1999 Insp Repts 50-324/98-14 & 50-325/98-14 on 990111-15,25 & 29. No Violations Noted.Major Areas Inspected:Licensee Calculations,Analysis,Performance Test Procedures & Other Engineering Activities IR 05000324/19990011999-03-15015 March 1999 Insp Repts 50-324/99-01 & 50-325/99-01 on 990103-0213.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000324/19980111999-01-28028 January 1999 Insp Repts 50-324/98-11 & 50-325/98-11 on 981122-990102.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint & Plant Support ML20198P0261998-12-21021 December 1998 Notice of Violation from Insp on 981011-1121.Violation Noted:On 981030,licensee Failed to Correctly Shutdown & Verify That Unit 1 Standby Gas Treatment Sys in Standby Alignment Per Section 7.1 of Procedure 1OP-10 IR 05000324/19980101998-12-21021 December 1998 Insp Repts 50-324/98-10 & 50-325/98-10 on 981011-1121. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support.Also Includes Results of Engineering & Health Physics Insp PNO-II-98-050, on 981123,licensee Declared Notification of Unusual Event,Due to Release of Chlorine Gas from Svc Water Injection Sys in Chlorination Bldg.Personnel Were Moved to Alternate Locations Away from Gas Leak,As Precautionary1998-11-24024 November 1998 PNO-II-98-050:on 981123,licensee Declared Notification of Unusual Event,Due to Release of Chlorine Gas from Svc Water Injection Sys in Chlorination Bldg.Personnel Were Moved to Alternate Locations Away from Gas Leak,As Precautionary IR 05000324/19980131998-11-24024 November 1998 Partially Withheld Insp Repts 50-324/98-13 & 50-325/98-13 on 981026-30 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Aspects of Licensee Plant Support IR 05000324/19980091998-11-0909 November 1998 Insp Repts 50-324/98-09 & 50-325/98-09 on 980830-1010. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support ML20195G4191998-11-0909 November 1998 Notice of Violation from Insp on 980830-1010.Violation Noted:On 980916,licensee Failed to Perform Section 7.1.5 of Procedure OMST-RHR-28Q as Required When Returning Flow Transmitter E11-FT-3338 to Service IR 05000324/19980081998-09-28028 September 1998 Insp Repts 50-324/98-08 & 50-325/98-08 on 980719-0829.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support PNO-II-98-039D, on 980827,update on Hurricane Bonnie Made. Walkdowns Confirmed,No Significant Damage to Security Barriers.Licensee Preparations for Plant Restart Continuing, Including Restoration of Warning Sirens1998-08-27027 August 1998 PNO-II-98-039D:on 980827,update on Hurricane Bonnie Made. Walkdowns Confirmed,No Significant Damage to Security Barriers.Licensee Preparations for Plant Restart Continuing, Including Restoration of Warning Sirens PNO-II-98-039C, on 980827,update on Hurricane Bonnie Made. No Significant Damage Has Occurred at Brunswick Plant or GE Fuel Fabrication Facility.Licensee Continues to Staff Technical Support Ctr & Emergency Operations Facility1998-08-27027 August 1998 PNO-II-98-039C:on 980827,update on Hurricane Bonnie Made. No Significant Damage Has Occurred at Brunswick Plant or GE Fuel Fabrication Facility.Licensee Continues to Staff Technical Support Ctr & Emergency Operations Facility PNO-II-98-039B, on 980826,update on Hurricane Bonnie Made. Hurricane Force Winds Have Been Experienced at Site,But No Significant Damage Has Occurred.Licensee Continues to Staff Emergency Facilities.No Other Damage Has Been Reported1998-08-26026 August 1998 PNO-II-98-039B:on 980826,update on Hurricane Bonnie Made. Hurricane Force Winds Have Been Experienced at Site,But No Significant Damage Has Occurred.Licensee Continues to Staff Emergency Facilities.No Other Damage Has Been Reported PNO-II-98-039A, on 980826,update on Hurricane Bonnie Made. Brunswick Resident Inspectors & One Regional Inspector Remain on Site to Monitor Licensee Activities.Region II State Liaison Officer Arrived in Raleigh Area1998-08-26026 August 1998 PNO-II-98-039A:on 980826,update on Hurricane Bonnie Made. Brunswick Resident Inspectors & One Regional Inspector Remain on Site to Monitor Licensee Activities.Region II State Liaison Officer Arrived in Raleigh Area PNO-II-98-039, on 980525,preparations for Hurricane Bonnie Made.Licensee Monitoring Progress of Hurricane in Order to Have Both Units in Cold Shutdown Three H Prior to Arrival of Hurricane Force Winds on Site1998-08-25025 August 1998 PNO-II-98-039:on 980525,preparations for Hurricane Bonnie Made.Licensee Monitoring Progress of Hurricane in Order to Have Both Units in Cold Shutdown Three H Prior to Arrival of Hurricane Force Winds on Site IR 05000324/19980071998-08-11011 August 1998 Insp Repts 50-324/98-07 & 50-325/98-07 on 980607-0718. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20237B9211998-08-11011 August 1998 Notice of Violation from Insp on 980607-0718.Violation Noted:Licensee Failed to Accomplish Activities Affecting Quality in Accordance W/Documented Instructions in Procedures for Listed Examples IR 05000324/19980061998-07-0606 July 1998 Insp Repts 50-324/98-06 & 50-325/98-06 on 980426-0606. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20236N9451998-07-0606 July 1998 Notice of Violations from Insp on 980426-0606.Violations Noted:On 980521,licensee Made Temporary Procedure Change That Altered Intent of Maint Surveillance Test 1MST-DG11R, DG-1 Loading Test,By Substituting 25 for 50 Horsepower Load IR 05000324/19983001998-06-15015 June 1998 NRC Operator Licensing Exam Repts 50-324/98-300 & 50-325/98-300 on 980508-15.Six SRO & Four RO Candidates Tested.All Passed Exam.One Candidate Identified as Having Some Performance Weaknesses ML20249A2191998-06-0101 June 1998 Notice of Violation from Insp on 980315-0425.Violation Noted:On 980331 Licensee Failed to Accomplish Scaffolding Erection Activities in Accordance W/Documented Procedure OMMM-022 IR 05000324/19980051998-06-0101 June 1998 Insp Repts 50-324/98-05 & 50-325/98-05 on 980315-0425. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20216H4431998-04-16016 April 1998 Insp Repts 50-324/98-04 & 50-325/98-04 on 980209-13,0309-12 & 16-20.Violations Noted.Major Areas inspected:follow-up on Licensee Corrective Actions for Electrical Equipment Environ Qualification & Review of Instrument Response Time Testing ML20216H4341998-04-16016 April 1998 Notice of Violation from Insp on 980209-13,0309-12 & 16-20. Violation Noted:On 970603,licensee Failed to Accomplish Activities Affecting Quality in Accordance W/Procedure EGR-NGGC-0005 IR 05000324/19980031998-04-13013 April 1998 Insp Repts 50-324/98-03 & 50-325/98-03 on 980201-0314.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support.Also Includes Results of Health Physics Insp by Regional Inspectors ML20217C8011998-03-16016 March 1998 Notice of Violation from Insp on 980126-30.Violation Noted: Rev 46 to Licensee Emergency Plan Decreased Effectiveness of Plan That Adopted Regulatory Provision for Biennial Exercise ML20217C8061998-03-16016 March 1998 Insp Repts 50-324/98-01 & 50-325/98-01 on 980126-30. Violations Noted.Major Areas Inspected:Emergency Preparedness Exercise ML20216B1741998-03-0202 March 1998 Insp Repts 50-324/97-15 & 50-325/97-15 on 971228-980131. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support ML20216B1621998-03-0202 March 1998 Notice of Violation from Insp on 971228-980131.Violation Noted:On 971203 & 971230,for Unit 1 & 971203,971210 & 971220 & 980104 for Unit 2,Condition Repts Were Not Initiated to Address Repetitive Failures of Plant Computer ML20202D3161998-02-0505 February 1998 Omitted Page 42 to Insp Repts 50-324/97-13 & 50-325/97-13 Transmitted on 980123 IR 07100109/20120271998-01-23023 January 1998 Notice of Violation from Insp on 971109-1227.Violation Noted:On 971209,inspector Determined That Licensee Had Not Maintained Data Sheets or Logs for Equipment Alignment ML20199G7501998-01-23023 January 1998 Insp Repts 50-324/97-13 & 50-325/97-13 on 971109-1227. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support.Includes Results of Maint, Engineering & FP Insps ML20198N6461997-12-30030 December 1997 Notice of Violation from Insp on 971209-12.Violation Noted: on 971118,locked High Radiation Area Was Left Unattended & Entrance Was Not Secured W/Designated Special cal-core Locks Prior to Leaving Area Unguarded ML20198N6561997-12-30030 December 1997 Insp Repts 50-324/97-14 & 50-325/97-14 on 971209-12. Violations Noted.Major Areas Inspected:Radiation Protection & Chemistry Controls,Miscellaneous Radiation Protection & Chemistry Issues & Mgt Meetings IR 05000324/19970141997-12-30030 December 1997 Insp Repts 50-324/97-14 & 50-325/97-14 on 971209-12. Violations Noted.Major Areas Inspected:Radiation Protection & Chemistry Controls,Miscellaneous Radiation Protection & Chemistry Issues & Mgt Meetings ML20198P0561997-12-23023 December 1997 NOV from Insp Completed on 971113.Violation Noted:Licensee Failed to Promptly Correct Condition Adverse to Quality Re Unit 1 High Drywell Temp Condition ML20197H1691997-12-0808 December 1997 Notice of Violation from Insp on 970928-1108.Violation Noted:On 970923,torus Master clearance,2-97-555 Was Not Adequate to Prevent Draining of Water Into Unit 2 Torus 1999-09-15
[Table view] |
Text
. - _ - - _ . _ _ - _ _ _ _ _ _ _ _
.
'
UNiit D 51 ATLS
/j k' " G t y'o, NUCLE AR REGUL ATORY COMMISSION
' #
[ ,c( n ALGloN il
? " I 101 M AhlE11 A sTRiti.N W.. sul10 29H ATL ANT A, G[oRGI A 30323 f
%,.....y NOV 2 01932 Report lios.: 50-325/92-39 and 50-324/92-39 Licensee: Carolina Power and Light Company P. O. Box 1551 Raleigh, fic 27602 Docket 110s.: 50 325 and 50-324 License lios.: DPR-71 and DPR-62 facility llame: Brunswick 1 and 2 Inspection Conducted: October 19-23, 1992
' /c Inspector:
lC,~lh_oma s j 414L [d'
/
i(p //
taeS[gYtd,-
t 4f D ICpIll^tinertoMA- masDate Signed CWIsema '
fcg.1Lkt '
<_ 'L/b/ U-Date $lg_ned~
_ . _ . f Approved by: 'h NI*:F L- f I .. / (. 3.1'A If.liFanch7thfeb'.~ Date Slgned~
Test Programs Section Engineering Branch Division of Reactor Safety SUMMARY Scope:
This routine, announced inspection was conducted in the areas of followup on previous llRC inspection finding Results:
In the areas inspected, violatiors or deviations were not identifie I
'
9212290157 921120
{DR ADOCK 05000324 PDR
.
I REPORT DETAILS Persons Contacted licensee Employees
- K. Ahern, Unit 2 Operations Manager
- H. Beane, Manager, Quality Control A. Bishop, Acting Manager, Brunswick Engineering Support Section, Nuclear Engineering Department
- J. Boone, Manager, Events Analysis Subunit, Regulatory Compliance
- M. Bradley, Site Manager, Nuclear Assessment Department A. Burkhart, Manager, Operating Experience Program, Nuclear Services Department
- S. Callis, Site Licensing Representative
- J. Cowan, Manager, Technical Support and Regulatory Compliance
- M. Foss, Manager, Corrective Action Program
- R. Godley, Manager, Regulatory Programs, Regulatory Compliance
- B. Hart, Nuclear Assessment Department
- R. Helme, Manager, Technical Support
- J. Holder, Manager, Outage Management and Modifications
- M. Jackson, Maintenance Manager, Unit 2
- M. Kesmodel, Coordinator, Integrated Action Plan
- L. Loflin, Manager, Nuclear Assessment Department
- D McCarthy, Manager, Nuclear Licensing
- D. Moore, Maintenance Manager, Unit 1
- R. Morgan, Plant Manager, Unit 1 E. Northeim, Principal Engineer, Mechanical Discipline, Brunswick Engineering Support Section
- Richey, Site Vice President, Brunswick Huclear Project D. Scott, Manager, Maintenance Staff
- R. Starkey, Vice President, Nuclear Services Department
- G. Thearling, Senior Specialist, Regulatory Compliance
- G. Warriner, Manager, Control and Administration
- D. Waters, Manager, Brunswick Licensing Unit
- A. Watson, Senior Vice President, Nuclear Generation Other licensee employees contacted during this inspection included engineers, operators and administrative personne NRC Personnel
- P. Byron, Resident inspector
- H. Christensen, Section Chief. Division of Reactor Projects, Region 11
- S. Ebneter, Regional Administrator, Region 11
- J. Johnson, Deputy Director, Division of Reactor Projects, Region 11
- R. Lo, Licensing Project Manager, NRR D. Nelson, Resident inspector
- R. Prevatte, Senior Resident inspector
- _ - _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . . . . _ . . _ . . . . .
.
'
.
,
'
Acronyms and initialisms used throughout this report are listed in the last paragrap . Action on Previous Inspection Findings (92701, 92702) (Closed) URI 50-325,324/89-34-05, Evaluate the Adequacy of Licensee's Actions to Investigate Design Integrity Issues for Safety Systems Other Than HPCI and SW, Including Adequacy of Preop Test Results.
] This issue has been tracked by the licensee as IAP ltem D7 and was reviewed during a previous NRC inspection (Report No. 91-27) which indicated that the action was expanded to include a Design Basis -
Reconstitution Document (DBD) program based on guidance presented in NUMARC 90-12, issued October-1990. The issue remained open to allow continued NRC review as the licensee progressed with program development and implementatio The inspectors reviewed the licensee's program, including completed DBD 37.4 for the Diesel Generator Building Ventilation System and concluded the following:
.) The System Design Basis Reconstitution Project scope included 27 system DBDs with priority on safety related plant system In addition, 12 generic issues such as Appendix R, seismic qualification, and station blackout, are to have the design basis history integrated into generic issue design basis document (2) The program status is on schedule with a target completion date at the end of 199 _
(3) The program included targeting the results of preoperational and surveillance testing for use in the validation process, Overall, the inspectors assessment concluded that the program scope and schedule were adequate for providing the design basis for Brunswick Nuclear Project plant systems and generic issue Therefore, this item is considered closed. However, the inspectors noted that the DBD validation process outlined in NED Guideline Number E-42 lacked field validation in many areas and did not include validation of as-built configurations with the design drawings. Considering that design drawing configuration problems have been identified in the past and recognized as a continuing problem at Brunswick, the exclusion of as-built configuration walkdowns as part of the validation of DBDs may result in centinued significant design drawing configuration problem _ _ _ _ - _ _ _ _ _ ______--._
- _ _ _
.
'
b. (Closed) Ifl 50-325, 324/89-34-18, Followup on Correction of TS Sampling Plan Flaw, (IAP ltem D1-4) and Determine its Effectiveness with Respect to Periodic Reviews of TS Requirements, ISI/ Appendix J, and Commitment Verification (IAP Item D1-1).
LAP ltems Ol.a and DI.d (which are the same IAP Items 01-1 and .
D1-4 discussed above) required the licensee to develop an improved sampling plan for QA surveillance of TS requirement Surveillance Report No.89-082 documented the results of the first trial run for sampling 15 surveillances. A second trial run was completed and the results were documented in Surveillance Report No.90-034, dated October 17, 1990. The inspectors reviewed Surveillance Report No.90-034 during NRC inspection 50-325,324/91-27 and verified that the acceptance criteria for the sample batch had a greater than 95 percent successful completion of TS requirements. Selection of the sample size was also reviewed to verify that compliance with the sampling procedure had been met in order to address the non-homogenous surveillance intervals within the STTS data base. No deficiencies were identified. Based upon the results of Surveillance Reports89-082 and 90-034 the licensee management determined that: (1) the TS sampling plan had been effective in verifying that surveillance testing intervals were being met and (2) a reduced level of effort and reduced frequency of implementing the sampling plan was desi rabl During NRC inspection 50-325,324/91-27, the inspectors determined that a revised TS sampling plan had been developed by the licensee. This sampling plan had a sample size of 50 TS requirements in lieu of the 100 previously required by the original TS sampling plan. At the time of the inspection a QA surveillance of TS surveillance requirements was in progress.using this revised TS sampling plan. Pursuant to review of the revised TS sampling plan the inspectors expressed concerns regarding the suitability of the statistical method being used and licensee management's failure to validate the method, prior to use. In response to the inspection team's concern CP&L management issued company correspondence BNP/NAD/91-201, dated October 2, 1991, to have an independent assessment and validation of the revised TS sampling plan performe As a result of the implementation status and the above inspectors'
concerns this items was left open pending (1) completion of the validation of the revised TS sampling plan and a determination of its suitability for use and; (2) Licensee's management review of the present ongoing QA surveillance results for effectivenes The inspectors reviewed the licensee's validation of the revised TS sampling plan during this current inspection and determined that the validation method was adequat The validation method
-
. _ _ - - _ -
_ _ _ _ _ _ _ _
- _ - .
I f, ..
.
.
was described in licensee internal memoranda dated November 25, 1991, December 12, 1991, and May 4, 199 In addition, the inspectors also reviewed the QA surveillances performed on the TS surveillance requirements. The QA surveillances were dated December 17, 1991 and August 27, 1992 and were performed in accordance with the revised TS sampling pla The QA surveillances did not identify any missed TS surveillances for these surveillances that were randomly selected and reviewe The inspectors also reviewed the list of ACRs initiated in 1992 to determine if that process had identified any missed TS surveillances. The inspectors found that four ACRs were written for instances where a TS surveillance was missed. The four surveillances were missed out of over 40,000 total surveillances performed for both units during 1992. The surveillances nassed were in the areas of fire protection and IST. The inspectors concluded that the licensee has an adequate program for tracking the performance of TS surveillance requirements. This item is considered close (Closed) IFl 50-325,324/89-34-21: Followup on Implementation and Effectiveness of Developed Post Maintenance Testing Guidance (IAP Item 04):
This item represented a DET concern that proper post-maintenance inservice inspection and testing was not always specified for ASME Code components and materials following repairs. Between 1989 and 1991, the item was reviewed during four NRC inspections which indicated that no effective program for enhancement of PMT existe NRC review of this area during a special inspection conducted on February 17 - March 27, 1992, (Report No. 50-325,324/92-04)
revealed that PMT still had serious programmatic deficiencies that had not been corrected despite the existence of the IAP item, previous regulatory attention, and Corrective Action Program involvement. Based on the results of this inspection, NRC enforcement actions in this area were taken that included a Notice of Violation and a Notice of Deviation. The licensee's response letter to the NRC enforcement, dated May 27, 1992, outlined the Carolina Power and Light Company corrective actions to address PMT programmatic weaknesses. These corrective actions are to be completed by December 31, 1992. Based on the above, this IF1 is closed. NRC will continue to follow the licensee's corrective .I actions to address PMT weaknesses and will track the completion of this issue by Open Items 50-325,324/92-04-01 and -0 i
______ -_-_ -______ D
_ - - - - _ .
.
- ,
5 , (Closed) IFI 50-325,324/89-34-23: Follow-up on Implementation and .
Effectiveness of Corrective Action Program Improvements (IAP Item D9).
This IFI represents DET concerns that the-corrective action program at Brunswick was inadequate.due to weaknesses in problem identification, cause determination, and prompt development and implementation of corrective actions. The licensee's Level 1 IAP-action item to address this matter was Item D9, " implement corrective action program improvements". Seven Level 2 action items were established to accomplish the improvements. -NRC Inspection 325,324/90-31 determined that these Level 2 items had ,
all been completed. However, reservations were expressed regarding the effectiveness of the actions and the item was not-close Item 09 was examined in Inspection Report 325,324/91-15. That inspection found that the program was officially implemented at :
the end of.1990 and had resulted in the identification of a large number of. problems. A-large backlog of these problems requiring resolution had resulted and the effectiveness.of the program remained in question. An effectiveness review conducted by the licensee's Nuclear Asse'ssment Department in March 1991 (memo from H. Bradley to W. Simpson dated April- 16, 1991). concluded that the
.
program was " marginally effective" and that the IAP item should remain open pending further evaluation. Licensee corporat corrective action program personnel stated that thei considered that the effectiveness of the program could not-be adequately judged at this early stage but that its effectiveness should be apparent by the end of=199 The inspectors expressed concern that better methods of monitoring the effectiveness of the program were needed. .For example, it appeared that the negative effects of backlog and imbalances in the distribution of backlog among organizations were not being adequately recognized. Because of continued concerns regarding the effectiveness'of the program.the item'again remained ope The status of this item was reexamined during the NRC inspection 325,324/91-2 The plant was. in the first refueling outage to be-initiated since the implementation of the improved Correctiv Action Program. The . inspectors determined that IAP Item D9 should-remain open until the effects of the refueling outage on the program could be observed. A more detailed assessment of the licensee's resolution of the-adverse conditions being identified-was to be assessed during subsequent NRC inspection P The NRC conducted a special engineering, technical support, and corrective actions inspection (Inspection Report 325,324/92-10)
from March 30 - April 10, 1992. The objective of the-inspection was to assess current Brunswick performance in the areas of engineering, technical support, and corrective actions,'and to make comparisons with the performance that existed at the-time of
.-
.
'
l
.
the NRC DET inspection in May 1989. Inspection report 325,324/92-10 identified that many performance weaknesses observed during the DET were still present in 1992. Timeliness and effectiveness of corrective actions, equipment failures, and personnel / maintenance errors continued to occu Several examples of untimely corrective actions were noted, poor root cause analysis were being performed, and there was a mismatch between the amount of existing work backlog and the amount of human and financial resources dedicated to resolve the issues in a timely manne The examples identified in Inspection Report 50-325,324/92-10 were identified as potential violation 50-325,324/92-10-01, Inadequate Corrective Actions. The Notice of Violation has not been issued, but is being considered for escalated enforcement action. NRC Inspection Report 50-325,324/92-12 dated May 27, 1092, and NRC letter dated June 23, 1992, both requested that CP&L provide a written response to address, among other things, the ineffective corrective action progra The licensee provided a response to the NRC dated July 23, 1992, which described actions to address the ineffective corrective action program. Subsequent to the July 23, 1992 response, the licensee committed to provide a more detailed response by November 9, 199 Since the NRC has identified potential violation 50-325, 324/92-10-01 concerning inadequate corrective actions, ar.d the licensee is in the process of developing an action plan to address the ineffective corrective action program, IFI 50-325, 324/89-34-23 (IAP ltem D9), will be closed. Licensee corrective actions for Item D9 will be followed in conjunction with the followup to potential violation 50-325,324/92-10-01, (Closed) IFI 325,324/89-34-24, Develop and Institutionalize Corporate Corrective Action Program (IAP Item D10).
The DET concern was that there was little or no corporate involvement in the Corrective Action Program to provide oversight, direction and assessment of the program's effectivenes Nuclear Generation Group Manual, NGGM 405-04 is the corporate document delineating the CAP. Each CP&L nuclear facility and the NED have developed procedures to implement the corporate progra The Brunswick facility implemented the CAP, December 31, 199 NRC Inspection Report 325,324/91-15 documented the review of the CAP and concluded that the program was in place. This inspection identified that staffing for the program at the corporate level had not been fully identified and the performance indicators _to measure the effectiveness of the program implementation had not been develope I
_ - - _ _ _ _ _-
,
c,
-
,
The inspectors reviewed the CAP organization and noted that'
corporate coordination and support responsibilities were assigned to the NLS. Corporate staffing was completed-in: July 1991 with: 'l the appointment of a senior engineer as the Corporate CAP --
Coordinator under the direction of the CAP /0EF Manage During Inspection 50-325,324/91-27,.the inspectors reviewed several documents the licensee was using to measure the effectiveness of the CAP implementation. The new program was started December 31, 1990, and the licensee had been monitoring effectiveness by conducting monthly meetings with CAP coordinators >
from each nuclear facility, corporate CAP coordinator, managers, training personnel and.NED personnel. In addition, senior management received a monthly effectiveness report which provided tha status of IAP action items and identified CAP status with regard to action items being worked and improvements made to the -
progra The NAD conducted a special assessment of the progra The findings were reviewed by senior management and action _ items were assigned to specific department managers. - The review of .
CAP /0EF action item tracking list dated September 18, 1991 '
indicated approximately 90 percent of these' action items were complete During performance of inspection 50-325,324/91-27 the inspectors held discussions with corporate program managers concerning a continuous assessment program to monitor effectiveness-of the CAP and other programs such-as the 10 CFR 50.59 Safety Review Progra The licensee stated that a continuous assessment program was scheduled to be issued by the end of 1991. Performance indicators to be used to monitor the aforemention programs have been finalized. These= indicators and other attributes such as periodic meeting of nuclear facility program coordinators, program managers, and others will be included into a formal process for management approval. The inspectors were_ assured that the program data base, reports,- improvements,- problems and actions taken would be retrievable and available for audit. The current programs-for monitoring effectiveness of the IAP will be phased out approximately one year after the IAP is closed. The purpose.of-
, this additional time was to assure that the IAP actions were complete and fully closed out. This item remained open until
.
further overview of the program and its effectiveness could be analyze During this current inspection the inspectors reviewed the licensee's continuous ossessment p.lan which was issued December 26, 1991. . As discussed in paragraph 2.e of-this report, the inspectors noted that the licensee is developing an action plan to address the ineffective cor_rective action program identified in NRC Inspection Report Item 50-325,324/92-10_0 Therefore, IFI 50-325,324/89-34-24 (IAP Item D10) is closed and future corrective actions will be followed in conjunction with NRC followup for the potential violation,
_ - _ _ _ _ _ -
.
.. . .. ..
..
-
,
1 .
I- 8 (Closed)* IFl 50-325, 324/89-34-36: Implementation and
' Effectiveness of Corporate Quality Assurance Department Improvements (IAP ltem E.4). (Closed)* IFI 50-325,324/89-34-37: Implementation and Effectiveness of Independent Performances Assessments (IAP ltem ES).
- Note: As the licensee developed plans to resolve these two items, it became apparent that there was considerable overlap between the plan and the actions developed to. satisfy both items. Therefore these items were reviewed together and discussed togethe The above items were identified by the NRC DET inspection in 1989 which concluded that Corporate QA audits were ineffective. Specifically, the audits were limited in scope, primarily programmatic, focused on document reviews and administrative requirements, and were not performance based, in the IAP, developed in 1989, the licensee committed to integrate the activities of Corporate and Site QA organizations, broaden the scope of audits and develop performance based method The licensee implementation of commitments were reviewed in a number of NRC followup inspections in 1990 and 1991. In NRC report 50-325,324/91-27 the inspectors concluded that the licensee had inplemented the commitments in the IAP items E.4 and The major change established to resolve these issues was the formation of a new department called, the NAD. A charter was issued which stated that NAD is responsible for independently evaluating functions which have potential nuclear safety, reliability or quality implications. The department was established in January 199 The NAD structure was established to mirror the site functional areas, such as operations, maintenance, engineering and technical support, and environmental and radiation control. A component had been established at both the corporate office and the sit An overview plan was developed which integrates corporate and site assessment activitie The assessment process has also been modified over past years. All of the activities are considered assessments and are performance base The previous audits, required by the TS are embedded within the performance based assessments, in NRC Report 50-325,324/91-27, the inspectors reviewed available NAD assessments and found, that although the licensee had implemented the actions to improva the self assessment process, there was not yet sufficient objective evidence available on which to judge the effectiveness of these actions. The inspectors concluded that closure of these items would recuire reviews and evaluations of additional I
_ _ - _ _
. - - - - - - - ~ - - -- _ . - . . - . - . . . -
..
-
l
!
. 1
-
..
,
assessments by NAD and effectiveness review of the actions taken to -
correct the finding In the period February 17 to May 1, 1992 (NRC Report 50-325,324/92-12) 4 the NRC conducted an extensive appraisal of the licensee's performanc The NRC determined that the NAD organization began operation in January .
1991, before staffing and procedures were complete. For the most part, '
initial assessments by this organization were not effective.- As of April 1992, staffing and procedures were essentially complete;-and performance had improved. The Brunswick sitewide assessment completed '
November 1991, and the CAP assessment completed March 1992, identified significant performance deficiencies and-the causes of these
, deficiencie In this same appraisal the NRC found that the licensee's CAP was not effectiv Consequently, subsequent evaluation of NAD performance wa '
based on whether assessments were effective in identifying problems, Effectiveness of the CAP is considered a separate issue and is under current NRC revie The resident inspectors conducted a review of the licensee's self assessment capability in the period June 5 - July 3, 1992 (NRC Report 50-325,324/92-19). In this effort the resident inspectors reviewed
,
both routine and special NAD assessment reports from Mid 1991 and
-
verified that NAD is conducting the audits required by the TS, the QA program, and other committed requirements. They identified as especially noteworthy, the findings in a series of audits of the CAP in 1991 and 1992, preventive maintenance in June 1992, maintenance in June 1992, and a corporate assessment in June 1992. Additionally, NAD conducted followup audits and reiterated previously identified problem .
where corrective action was not implemented or if implemented, was not i effective. The resident inspectors concluded that overall, NAD assessments have shown significant-improvement and provide a valuable input to senior management. They are achieving credibility with plant organizations and appear to be thorough in their-assessment Also, NAD audits of the Environmental and Radiological Control (NRC '
Report 50-325,324/92-25) and the Emergency Preparedness (NRC Report 50-325,324/92-36) areas were reviewed by NRC specialist inspectors on August 31 - September 4, 1992 and October 19-23, 1992 respectively. .The inspectors found that the NAD assessments made significant findings and identified the causes for the deficiencie The inspectors reviewed a number of the NAD assessment reports to evaluate the character of the findings. The assessments reviewed included:
Corrective Action Program April 15,1992 Technical Support and Outage Management July 2, 1992 Outage Management Follow-up August 24, 1992 Plant Material Control October 6, 1992
<
__i _ _ . _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _
'
, -
--
.
.
. .. .
..
. ..
.
.. ..
.
.
-
.
.
'
.
In review-of the above documonts the inspectors found the assessments to be substantive. The findings were clearly stated and supported by performance based examples which served to further define the deficient area. The inspectors concluded that the NAD assessments were identifying significant problems over a broad scope of functional area . Exit Interview The inspection scope and results were summarized on October 23, 1992, with those persons indicated in paragraph 1. The inspectors described the areas inspected and discussed in detail the inspection results listed below. Proprietary information is not contained in this repor Dissenting comments were not received from the licensee. The following -.
items were closed:
URI 325,324/89-34-05 IFI 325,324/89-34-18 IFI 325,324/89-34-21 IFI 325,324/89-34-23 IFl 325,324/89-34-24 Ifl 325,324/89-34-36 IFI 325,324/89-34-37 Acronyms and initialisms ACR Adverse Condition Report ASME American Society of Mechanical Engineer BNP Brunswick Nuclear Plant CAP Corrective Action Program CP&L Carolina Power and Light DBD Design Basis Documentation DET Diagnostic Evaluation Team -
HPCI High Pressure Coolant injection IAP Integrated Action Plan IFI Inspector Followup Item ISI Inservice Inspection IST Inservice Testing NAD Nuclear Assessment Department NED Nuclear Engineering Department NLS Nuclear Licensing Section NUMARC Nuclear Management and Resources Council OEF Operating Experience Feedback PMT Post Maintenance Testing QA Quality Assurance STTS Surveillance Test Tracking System SW Service Water TS Technical Specifications URI Unresolved Item I
l