Similar Documents at Surry |
---|
Category:INSPECTION REPORT
MONTHYEARIR 05000280/19980051998-07-13013 July 1998 Insp Repts 50-280/98-05 & 50-281/98-05 on 980503-0613.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000280/19970111997-10-0707 October 1997 Partially Withheld Insp Repts 50-280/97-11 & 50-281/97-11 on 970924 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Plant Support by Regional Safeguards Specialist IR 05000280/19910221991-08-23023 August 1991 Insp Repts 50-280/91-22,50-281/91-22,50-338/91-18 & 50-339/91-18 on 910731 & 0801-02.No Violations Noted.Major Areas Inspected:Evaluation of Licensee Pipe Wall Thinning Insp & Replacement Program IR 05000280/19910151991-07-0808 July 1991 Insp Repts 50-280/91-15 & 50-281/91-15 on 910520-22 & 0619. No Violations Noted.Major Areas Inspected:Isi Including Observation of Visual & Nondestructive Exams on Main Steam Sys Piping Welds IR 05000280/19910091991-04-17017 April 1991 Insp Repts 50-280/91-09 & 50-281/91-09 on 910326-29.No Violations Noted.Major Areas Inspected:Audits & Appraisals, Training & Qualifications External Exposure Control,Control of Radioactive Matl & Contamination IR 05000280/19910061991-04-12012 April 1991 Insp Repts 50-280/91-06 & 50-281/91-06 on 910224-0330. Violations Noted.Major Areas Inspected:Plant Operations, Maint,Surveillance,Procedures,Esf Sys Walkdown & Review of Licensee Self Assessment Capabilities IR 05000280/19900231990-08-24024 August 1990 Partially Withheld Insp Repts 50-280/90-23 & 50-281/90-23 on 900723-27 (Ref 10CFR 2.790(d)).Major Areas Inspected: Review of Procedures,Records,Operations & Physical Inventory for Use,Control & Accountability of SNM IR 05000280/19880501989-01-11011 January 1989 Partially Withheld Insp Repts 50-280/88-50 & 50-281/88-50 on 881212-16 (Ref 10CFR2.790(d) & 73.21).No Violations or Deviations Noted.Major Areas Inspected:Physical Security Program,Mgt Support,Plans,Audits,Barriers & Assessment IR 05000280/19880401988-10-26026 October 1988 Insp Repts 50-280/88-40,50-281/88-40,50-338/88-28 & 50-339/88-28 on 880926-30.No Violations or Deviations Noted. Major Areas Inspected:Control Room Habitability & Insp Followup Items IR 05000280/19870111987-06-22022 June 1987 Insp Repts 50-280/87-11 & 50-281/87-11 on 870427-0501.Three Potential Enforcement Findings Noted.Major Areas Inspected: Audit Performed in Feb 1987 by Util of Industrial Distributors IR 05000280/19870091987-05-21021 May 1987 Insp Repts 50-280/87-09 & 50-281/87-09 on 870405-0502.No Violations Identified.Major Areas Inspected:Licensee Actions on Previous Enforcement Matters,Plant Operations,Maint & Surveillance & LER Review & 10CFR21 Reviews IR 05000280/19870031987-03-20020 March 1987 Insp Repts 50-280/87-03 & 50-281/87-03 on 870209-13. Violations Noted:Failure to Adhere to Radiation Control Procedures,To Comply W/Low Level Radwaste Disposal Facility Agreement State License Conditions & W/Dot Regulations IR 05000280/19870041987-03-0606 March 1987 Insp Repts 50-280/87-04 & 50-281/87-04 on 870201-28.No Violations or Deviations Noted.Major Areas Inspected:Plant Operations,Maint,Surveillance,Licensee Action on Previous Enforcement Matters & TMI Action Item Closeout IR 05000281/19860361987-02-23023 February 1987 Insp Rept 50-281/86-36 on 861113-20 & 870209.Violations Noted:Failure to Properly Valve Penetrations for Type a Test in Accordance w/10CFR50,App J.Four Unresolved Items Identified IR 05000280/19870021987-02-18018 February 1987 Insp Repts 50-280/87-02 & 50-281/87-02 on 870202-06.No Violations or Deviations Noted.Major Areas Inspected:Exam Onsite in Area of Info Notices,Unplanned Radiological Releases,Effluent Monitors & Effluent Reporting IR 05000280/19860411987-02-12012 February 1987 Insp Repts 50-280/86-41 & 50-281/86-41 on 861207-870131.No Violations or Deviations Noted.Major Areas Inspected:Action on Previous Enforcement Matters,Plant Operations,Maint & Surveillance & IE Bulletin Followup IR 05000280/19860421987-02-10010 February 1987 Augmented Insp Repts 50-280/86-42 & 50-281/86-42 on 861209- 870114.Violation Noted:Failure to Fully Follow Procedures, Provide Adequate Instruction for & Document Performance of Maint Operations ML20211C5161987-02-10010 February 1987 Augmented Insp Repts 50-280/86-42 & 50-281/86-42 on 861209- 870114.Violation Noted:Failure to Fully Follow Procedures, Provide Adequate Instruction for & Document Performance of Maint Operations IR 05000280/19870011987-02-0404 February 1987 Insp Repts 50-280/87-01 & 50-281/87-01 on 870112-15.No Violations or Deviations Noted.Major Areas Inspected:Fire Protection Sys Interaction Events Associated w/861209 Feedwater Pipe Rupture IR 05000280/19860381986-12-29029 December 1986 Insp Repts 50-280/86-38 & 50-281/86-38 on 861102-1206.No Violations or Deviations Noted.Major Areas Inspected:Plant Operations,Maint & Surveillance,Outages,Followup on Region Identified Items & Insp of Dry Spent Nuclear Fuel Facility IR 05000280/19860401986-12-23023 December 1986 Insp Repts 50-280/86-40 & 50-281/86-40 on 861129-1203.No Violations or Deviations Noted.Major Areas inspected:post- Refueling Startup Tests,Thermal Power Determination & RCS Leakage Measurements IR 05000280/19860391986-12-0505 December 1986 Partially Withheld Insp Repts 50-280/86-39 & 50-281/86-39 on 861118-21 (Ref 10CFR2.790(d) & 10CFR73.21).No Violations Noted.Major Areas Inspected:Security Organization,Security Program Audit & Protected Area Barrier IR 05000280/19860341986-11-28028 November 1986 Insp Repts 50-280/86-34 & 50-281/86-34 on 861020-23 & 27-31. Violation Noted:Failure to Provide Appropriate Inservice Insp Drawings IR 05000280/19860261986-09-29029 September 1986 Mgt Meeting Repts 50-280/86-26 & 50-281/86-26 on 860904.No Violation Noted.Major Areas Discussed:Ultrasonic Exam Procedure to Detect Actual Flaws & Artificial Reflectors in Region II Centrifugally Cast Stainless Steel Test Specimens IR 05000280/19860141986-08-0505 August 1986 Insp Repts 50-280/86-14 & 50-281/86-14 on 860603-0707.No Violation or Deviation Noted.Major Areas Inspected:Plant Operations & Operating Records,Maint & Surveillance,Security & LER Review ML20205D7491986-07-30030 July 1986 Partially Withheld Insp Repts 50-280/86-16 & 50-281/86-16 on 860707-11 (Ref 10CFR2.790 & 73.21).Violations Noted:Failure to Provide Adequate Intrusion Detection Capability for Protected Area IR 05000280/19860061986-03-17017 March 1986 Insp Repts 50-280/86-06 & 50-281/86-06 on 860226-28.No Violation or Deviation Noted.Major Areas Inspected: Radiological Environ Monitoring,Reporting & Inspector Followup Items IR 05000280/19850301985-10-28028 October 1985 Physical Security Insp Repts 50-280/85-30 & 50-281/85-30 on 850909-12.Violation Noted:Failure to Provide Positive Access Control to Protected Area.Details Withheld (Ref 10CFR2.790(d) & 73.21) IR 05000211/20030041985-04-17017 April 1985 Insp Repts 50-280/85-07 & 50-281/85-07 on 850211-0304. Violation Noted:Charging Pump Intermediate Seal Coolers Not Operating in Accordance W/Tech Spec 3.13.B.3-Paragraph 5.d IR 05000280/19840361985-02-19019 February 1985 Insp Repts 50-280/84-36 & 50-281/84-36 on 841201-850104. Violation Noted:Opposite Unit Auxiliary Feedwater Sys Not Available to Unit 2 Because motor-operated cross-tie Valve Closed IR 05000280/19840311985-02-11011 February 1985 Insp Repts 50-280/84-31,50-281/84-31,50-338/84-39 & 50-339/84-39 on 841105-28.Deviation Noted for North Anna 1 & 2:failure to Provide Mgt Training to Shift Technical Advisors IR 05000280/19820131982-07-0707 July 1982 IE Insp Repts 50-280/82-13 & 50-281/82-13 on 820601-02.No Noncompliance Noted.Major Areas Inspected:Emergency Planning,Specifically Interface Between Licensee & Region 3 at Emergency Response Facility IR 05000280/19820141982-06-28028 June 1982 IE Insp Repts 50-280/82-14 & 50-281/82-14 on 820601-04.No Noncompliance Noted.Major Areas Inspected:Radiation Protection Program,Followup on IE Circulars & Bulletins & Previous Inspector Identified Items & LERs IR 05000280/19820181982-06-23023 June 1982 IE Safeguards Insp Repts 50-338/82-22,50-339/82-22, 50-280/82-18 & 50-281/82-18 on 820616-18.No Noncompliance Noted.Major Areas Inspected:Security Organization,Program Audit & Access Control.Details Withheld (Ref 10CFR73.21) IR 05000280/19820161982-06-22022 June 1982 IE Insp Repts 50-280/82-16,50-281/82-16,50-338/82-16 & 50-339/82-16 on 820518-19.No Noncompliance Noted.Major Areas Inspected:Validation of Retran Computer Code IR 05000280/19820111982-06-21021 June 1982 IE Insp Repts 50-280/82-11 & 50-281/82-11 on 820525-28.No Noncompliance Noted.Major Areas Inspected:Radiological Environ Surveillance,Including Mgt Controls,Qc of Analytical Measurements & Insp of Selected Environ Monitoring Stations IR 05000280/19820171982-06-16016 June 1982 IE Insp Repts 50-280/82-17 & 50-281/82-17 on 820503-31.No Noncompliance Noted.Major Areas Inspected:Plant Operations, Operating Records,Maint & Testing,Ler Followup & Plant Security IR 05000280/19820151982-06-14014 June 1982 IE Safeguards Insp Repts 50-280/82-15 & 50-281/82-15 on 820601-04.No Noncompliance Noted.Major Areas Inspected:Site Orientation,Security Plan & Implementing Procedures & Organization Mgt.Details Withheld (Ref 10CFR73.21) IR 05000280/19820091982-05-28028 May 1982 IE Insp Repts 50-280/82-09 & 50-281/82-09 on 820419-23. Noncompliance Noted:Exceeded Instantaneous Tech Spec Limit for Gaseous Waste,Failure to Perform Adequate Evaluation of Unplanned Release & Failure to Promptly Notify NRC IR 05000280/19820051982-05-21021 May 1982 IE Emergency Preparedness Appraisal Repts 50-280/82-05 & 50-281/82-05 on 820315-26.Noncompliance Noted:Deficiencies in Emergency Plan Re Training,Procedures & Initial Dose Assessment IR 05000280/19820021982-05-20020 May 1982 IE Insp Repts 50-280/82-02 & 50-281/82-02 on 820419-23 & 26-30.Noncompliance Noted:Failure to Calibr Boric Acid Tank Level Instrument L-1-163 During Refueling Shutdown IR 05000281/19790291979-08-0202 August 1979 IE Insp Rept 50-281/79-29 on 790415-19.Noncompliances Noted: Quarterly Whole Body Radiation Limit Exceeded,Failure to Perform Survey & Failure to Provide Radiation Monitoring Device IR 05000280/19770301977-11-0909 November 1977 Insp Repts 50-280/77-30 & 50-281/77-30 on 771004-07. Noncompliance Noted:Improper Badging of Security Badges. Details Withheld (Ref 10CFR2.790) 1998-07-13
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000280/19980051998-07-13013 July 1998 Insp Repts 50-280/98-05 & 50-281/98-05 on 980503-0613.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000280/19970111997-10-0707 October 1997 Partially Withheld Insp Repts 50-280/97-11 & 50-281/97-11 on 970924 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Plant Support by Regional Safeguards Specialist IR 05000280/19910221991-08-23023 August 1991 Insp Repts 50-280/91-22,50-281/91-22,50-338/91-18 & 50-339/91-18 on 910731 & 0801-02.No Violations Noted.Major Areas Inspected:Evaluation of Licensee Pipe Wall Thinning Insp & Replacement Program IR 05000280/19910151991-07-0808 July 1991 Insp Repts 50-280/91-15 & 50-281/91-15 on 910520-22 & 0619. No Violations Noted.Major Areas Inspected:Isi Including Observation of Visual & Nondestructive Exams on Main Steam Sys Piping Welds IR 05000280/19910091991-04-17017 April 1991 Insp Repts 50-280/91-09 & 50-281/91-09 on 910326-29.No Violations Noted.Major Areas Inspected:Audits & Appraisals, Training & Qualifications External Exposure Control,Control of Radioactive Matl & Contamination IR 05000280/19910061991-04-12012 April 1991 Insp Repts 50-280/91-06 & 50-281/91-06 on 910224-0330. Violations Noted.Major Areas Inspected:Plant Operations, Maint,Surveillance,Procedures,Esf Sys Walkdown & Review of Licensee Self Assessment Capabilities IR 05000280/19900231990-08-24024 August 1990 Partially Withheld Insp Repts 50-280/90-23 & 50-281/90-23 on 900723-27 (Ref 10CFR 2.790(d)).Major Areas Inspected: Review of Procedures,Records,Operations & Physical Inventory for Use,Control & Accountability of SNM IR 05000280/19880501989-01-11011 January 1989 Partially Withheld Insp Repts 50-280/88-50 & 50-281/88-50 on 881212-16 (Ref 10CFR2.790(d) & 73.21).No Violations or Deviations Noted.Major Areas Inspected:Physical Security Program,Mgt Support,Plans,Audits,Barriers & Assessment IR 05000280/19880401988-10-26026 October 1988 Insp Repts 50-280/88-40,50-281/88-40,50-338/88-28 & 50-339/88-28 on 880926-30.No Violations or Deviations Noted. Major Areas Inspected:Control Room Habitability & Insp Followup Items IR 05000280/19870111987-06-22022 June 1987 Insp Repts 50-280/87-11 & 50-281/87-11 on 870427-0501.Three Potential Enforcement Findings Noted.Major Areas Inspected: Audit Performed in Feb 1987 by Util of Industrial Distributors IR 05000280/19870091987-05-21021 May 1987 Insp Repts 50-280/87-09 & 50-281/87-09 on 870405-0502.No Violations Identified.Major Areas Inspected:Licensee Actions on Previous Enforcement Matters,Plant Operations,Maint & Surveillance & LER Review & 10CFR21 Reviews IR 05000280/19870031987-03-20020 March 1987 Insp Repts 50-280/87-03 & 50-281/87-03 on 870209-13. Violations Noted:Failure to Adhere to Radiation Control Procedures,To Comply W/Low Level Radwaste Disposal Facility Agreement State License Conditions & W/Dot Regulations IR 05000280/19870041987-03-0606 March 1987 Insp Repts 50-280/87-04 & 50-281/87-04 on 870201-28.No Violations or Deviations Noted.Major Areas Inspected:Plant Operations,Maint,Surveillance,Licensee Action on Previous Enforcement Matters & TMI Action Item Closeout IR 05000281/19860361987-02-23023 February 1987 Insp Rept 50-281/86-36 on 861113-20 & 870209.Violations Noted:Failure to Properly Valve Penetrations for Type a Test in Accordance w/10CFR50,App J.Four Unresolved Items Identified IR 05000280/19870021987-02-18018 February 1987 Insp Repts 50-280/87-02 & 50-281/87-02 on 870202-06.No Violations or Deviations Noted.Major Areas Inspected:Exam Onsite in Area of Info Notices,Unplanned Radiological Releases,Effluent Monitors & Effluent Reporting IR 05000280/19860411987-02-12012 February 1987 Insp Repts 50-280/86-41 & 50-281/86-41 on 861207-870131.No Violations or Deviations Noted.Major Areas Inspected:Action on Previous Enforcement Matters,Plant Operations,Maint & Surveillance & IE Bulletin Followup IR 05000280/19860421987-02-10010 February 1987 Augmented Insp Repts 50-280/86-42 & 50-281/86-42 on 861209- 870114.Violation Noted:Failure to Fully Follow Procedures, Provide Adequate Instruction for & Document Performance of Maint Operations ML20211C5161987-02-10010 February 1987 Augmented Insp Repts 50-280/86-42 & 50-281/86-42 on 861209- 870114.Violation Noted:Failure to Fully Follow Procedures, Provide Adequate Instruction for & Document Performance of Maint Operations IR 05000280/19870011987-02-0404 February 1987 Insp Repts 50-280/87-01 & 50-281/87-01 on 870112-15.No Violations or Deviations Noted.Major Areas Inspected:Fire Protection Sys Interaction Events Associated w/861209 Feedwater Pipe Rupture IR 05000280/19860381986-12-29029 December 1986 Insp Repts 50-280/86-38 & 50-281/86-38 on 861102-1206.No Violations or Deviations Noted.Major Areas Inspected:Plant Operations,Maint & Surveillance,Outages,Followup on Region Identified Items & Insp of Dry Spent Nuclear Fuel Facility IR 05000280/19860401986-12-23023 December 1986 Insp Repts 50-280/86-40 & 50-281/86-40 on 861129-1203.No Violations or Deviations Noted.Major Areas inspected:post- Refueling Startup Tests,Thermal Power Determination & RCS Leakage Measurements IR 05000280/19860391986-12-0505 December 1986 Partially Withheld Insp Repts 50-280/86-39 & 50-281/86-39 on 861118-21 (Ref 10CFR2.790(d) & 10CFR73.21).No Violations Noted.Major Areas Inspected:Security Organization,Security Program Audit & Protected Area Barrier IR 05000280/19860341986-11-28028 November 1986 Insp Repts 50-280/86-34 & 50-281/86-34 on 861020-23 & 27-31. Violation Noted:Failure to Provide Appropriate Inservice Insp Drawings IR 05000280/19860261986-09-29029 September 1986 Mgt Meeting Repts 50-280/86-26 & 50-281/86-26 on 860904.No Violation Noted.Major Areas Discussed:Ultrasonic Exam Procedure to Detect Actual Flaws & Artificial Reflectors in Region II Centrifugally Cast Stainless Steel Test Specimens IR 05000280/19860141986-08-0505 August 1986 Insp Repts 50-280/86-14 & 50-281/86-14 on 860603-0707.No Violation or Deviation Noted.Major Areas Inspected:Plant Operations & Operating Records,Maint & Surveillance,Security & LER Review ML20205D7491986-07-30030 July 1986 Partially Withheld Insp Repts 50-280/86-16 & 50-281/86-16 on 860707-11 (Ref 10CFR2.790 & 73.21).Violations Noted:Failure to Provide Adequate Intrusion Detection Capability for Protected Area IR 05000280/19860061986-03-17017 March 1986 Insp Repts 50-280/86-06 & 50-281/86-06 on 860226-28.No Violation or Deviation Noted.Major Areas Inspected: Radiological Environ Monitoring,Reporting & Inspector Followup Items IR 05000280/19850301985-10-28028 October 1985 Physical Security Insp Repts 50-280/85-30 & 50-281/85-30 on 850909-12.Violation Noted:Failure to Provide Positive Access Control to Protected Area.Details Withheld (Ref 10CFR2.790(d) & 73.21) IR 05000211/20030041985-04-17017 April 1985 Insp Repts 50-280/85-07 & 50-281/85-07 on 850211-0304. Violation Noted:Charging Pump Intermediate Seal Coolers Not Operating in Accordance W/Tech Spec 3.13.B.3-Paragraph 5.d IR 05000280/19840361985-02-19019 February 1985 Insp Repts 50-280/84-36 & 50-281/84-36 on 841201-850104. Violation Noted:Opposite Unit Auxiliary Feedwater Sys Not Available to Unit 2 Because motor-operated cross-tie Valve Closed IR 05000280/19840311985-02-11011 February 1985 Insp Repts 50-280/84-31,50-281/84-31,50-338/84-39 & 50-339/84-39 on 841105-28.Deviation Noted for North Anna 1 & 2:failure to Provide Mgt Training to Shift Technical Advisors IR 05000280/19820131982-07-0707 July 1982 IE Insp Repts 50-280/82-13 & 50-281/82-13 on 820601-02.No Noncompliance Noted.Major Areas Inspected:Emergency Planning,Specifically Interface Between Licensee & Region 3 at Emergency Response Facility IR 05000280/19820141982-06-28028 June 1982 IE Insp Repts 50-280/82-14 & 50-281/82-14 on 820601-04.No Noncompliance Noted.Major Areas Inspected:Radiation Protection Program,Followup on IE Circulars & Bulletins & Previous Inspector Identified Items & LERs IR 05000280/19820181982-06-23023 June 1982 IE Safeguards Insp Repts 50-338/82-22,50-339/82-22, 50-280/82-18 & 50-281/82-18 on 820616-18.No Noncompliance Noted.Major Areas Inspected:Security Organization,Program Audit & Access Control.Details Withheld (Ref 10CFR73.21) IR 05000280/19820161982-06-22022 June 1982 IE Insp Repts 50-280/82-16,50-281/82-16,50-338/82-16 & 50-339/82-16 on 820518-19.No Noncompliance Noted.Major Areas Inspected:Validation of Retran Computer Code IR 05000280/19820111982-06-21021 June 1982 IE Insp Repts 50-280/82-11 & 50-281/82-11 on 820525-28.No Noncompliance Noted.Major Areas Inspected:Radiological Environ Surveillance,Including Mgt Controls,Qc of Analytical Measurements & Insp of Selected Environ Monitoring Stations IR 05000280/19820171982-06-16016 June 1982 IE Insp Repts 50-280/82-17 & 50-281/82-17 on 820503-31.No Noncompliance Noted.Major Areas Inspected:Plant Operations, Operating Records,Maint & Testing,Ler Followup & Plant Security IR 05000280/19820151982-06-14014 June 1982 IE Safeguards Insp Repts 50-280/82-15 & 50-281/82-15 on 820601-04.No Noncompliance Noted.Major Areas Inspected:Site Orientation,Security Plan & Implementing Procedures & Organization Mgt.Details Withheld (Ref 10CFR73.21) IR 05000280/19820091982-05-28028 May 1982 IE Insp Repts 50-280/82-09 & 50-281/82-09 on 820419-23. Noncompliance Noted:Exceeded Instantaneous Tech Spec Limit for Gaseous Waste,Failure to Perform Adequate Evaluation of Unplanned Release & Failure to Promptly Notify NRC IR 05000280/19820051982-05-21021 May 1982 IE Emergency Preparedness Appraisal Repts 50-280/82-05 & 50-281/82-05 on 820315-26.Noncompliance Noted:Deficiencies in Emergency Plan Re Training,Procedures & Initial Dose Assessment IR 05000280/19820021982-05-20020 May 1982 IE Insp Repts 50-280/82-02 & 50-281/82-02 on 820419-23 & 26-30.Noncompliance Noted:Failure to Calibr Boric Acid Tank Level Instrument L-1-163 During Refueling Shutdown IR 05000281/19790291979-08-0202 August 1979 IE Insp Rept 50-281/79-29 on 790415-19.Noncompliances Noted: Quarterly Whole Body Radiation Limit Exceeded,Failure to Perform Survey & Failure to Provide Radiation Monitoring Device IR 05000280/19770301977-11-0909 November 1977 Insp Repts 50-280/77-30 & 50-281/77-30 on 771004-07. Noncompliance Noted:Improper Badging of Security Badges. Details Withheld (Ref 10CFR2.790) 1998-07-13
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000280/19993021999-09-0808 September 1999 NRC Operator Licensing Retake Exam Repts 50-280/99-302 & 50-281/99-302 for Retake Exam Tests Administered on 990824. Exam Results:One SRO Candidate Received Part B re-take Operating Exam & Passed IR 05000280/19993011999-05-14014 May 1999 NRC Operator Licensing Exam Repts 50-280/99-301 & 50-281/99-301 (Including Completed & Graded Exams) for Tests Administered on 990329-0401 & 990412-15 IR 05000280/19980051998-07-13013 July 1998 Insp Repts 50-280/98-05 & 50-281/98-05 on 980503-0613.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000280/19970111997-10-0707 October 1997 Partially Withheld Insp Repts 50-280/97-11 & 50-281/97-11 on 970924 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Plant Support by Regional Safeguards Specialist ML20216B2581997-08-29029 August 1997 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $55,000.Violation Noted:Licensee Failed to Monitor Performance & Establish Goals Commensurate W/Safety for Emergency Switch Gear Heating Ventilation PNO-II-93-062, on 931115,Unit 2 Tripped from 95% Reactor Power.Caused by Three Main Feedwater Regulating Valves Closed.Unit Has Been Taken to cold-shutdown to Investigate Cause of SG Level Oscillations1993-11-16016 November 1993 PNO-II-93-062:on 931115,Unit 2 Tripped from 95% Reactor Power.Caused by Three Main Feedwater Regulating Valves Closed.Unit Has Been Taken to cold-shutdown to Investigate Cause of SG Level Oscillations IR 05000280/19933001993-10-20020 October 1993 Exam Repts 50-280/93-300 & 50-281/93-300 on 930920-24.Exam Results:Three SROs Passed Exam & One Out of Four ROs Failed Exam PNO-II-93-037, on 930820,unscheduled Shutdown in Excess of 72 H Occurred Due to Need to Repair Leak in Joint on SG B. RCS Temp Reduced Below 200 Degrees F.Licensee to Inspect Drain Valve Assemblies on Sg.State of VA Notified1993-08-23023 August 1993 PNO-II-93-037:on 930820,unscheduled Shutdown in Excess of 72 H Occurred Due to Need to Repair Leak in Joint on SG B. RCS Temp Reduced Below 200 Degrees F.Licensee to Inspect Drain Valve Assemblies on Sg.State of VA Notified IR 05000280/19910221991-08-23023 August 1991 Insp Repts 50-280/91-22,50-281/91-22,50-338/91-18 & 50-339/91-18 on 910731 & 0801-02.No Violations Noted.Major Areas Inspected:Evaluation of Licensee Pipe Wall Thinning Insp & Replacement Program IR 05000280/19910151991-07-0808 July 1991 Insp Repts 50-280/91-15 & 50-281/91-15 on 910520-22 & 0619. No Violations Noted.Major Areas Inspected:Isi Including Observation of Visual & Nondestructive Exams on Main Steam Sys Piping Welds IR 05000280/19910091991-04-17017 April 1991 Insp Repts 50-280/91-09 & 50-281/91-09 on 910326-29.No Violations Noted.Major Areas Inspected:Audits & Appraisals, Training & Qualifications External Exposure Control,Control of Radioactive Matl & Contamination IR 05000280/19910061991-04-12012 April 1991 Insp Repts 50-280/91-06 & 50-281/91-06 on 910224-0330. Violations Noted.Major Areas Inspected:Plant Operations, Maint,Surveillance,Procedures,Esf Sys Walkdown & Review of Licensee Self Assessment Capabilities ML20128Q5421991-04-12012 April 1991 Notice of Violation from Insp on 910224-0330.Violation Noted:Periodic Surveillance 2-PT-18.61 & PT-53.3 Were Not Performed within TS Period City Requirements PNO-II-90-066, on 901023,util Made 1 H Rept Per 10CFR50.72 Re Entry Into Station Emergency Plan for Shutdown of Unit 2. Caused by Svc Water Flow,Less That Design Basis Required Flow.Licensee Currently Evaluating Situation1990-10-23023 October 1990 PNO-II-90-066:on 901023,util Made 1 H Rept Per 10CFR50.72 Re Entry Into Station Emergency Plan for Shutdown of Unit 2. Caused by Svc Water Flow,Less That Design Basis Required Flow.Licensee Currently Evaluating Situation IR 05000280/19900231990-08-24024 August 1990 Partially Withheld Insp Repts 50-280/90-23 & 50-281/90-23 on 900723-27 (Ref 10CFR 2.790(d)).Major Areas Inspected: Review of Procedures,Records,Operations & Physical Inventory for Use,Control & Accountability of SNM PNO-II-89-066A, updates Status of Hurricane Hugo for Nuclear Facilities in Southeast.Manning of Incident Response Ctr by Region II Continuing1989-09-21021 September 1989 PNO-II-89-066A:updates Status of Hurricane Hugo for Nuclear Facilities in Southeast.Manning of Incident Response Ctr by Region II Continuing IR 05000280/19880501989-01-11011 January 1989 Partially Withheld Insp Repts 50-280/88-50 & 50-281/88-50 on 881212-16 (Ref 10CFR2.790(d) & 73.21).No Violations or Deviations Noted.Major Areas Inspected:Physical Security Program,Mgt Support,Plans,Audits,Barriers & Assessment IR 05000280/19880401988-10-26026 October 1988 Insp Repts 50-280/88-40,50-281/88-40,50-338/88-28 & 50-339/88-28 on 880926-30.No Violations or Deviations Noted. Major Areas Inspected:Control Room Habitability & Insp Followup Items ML20155F5031988-06-0808 June 1988 EN-88-048:notifies of Intent to Issue Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $100,000 to Util,Based on Number of Violations,Including Failure to Adequately Evaluate Radiation Hazards Re Incore Detector ML20155F5801988-06-0808 June 1988 EN-88-047:on 880613,notice of Violation & Proposed Imposition of Civil Penalty in Amount of $50,000 Will Be Issued to Licensee.Action Based on Failure to Verify Boric Acid Piping Heat Tracing Circuits on Monthly Basis PNO-II-88-011, on 880206,slight Positive Pressure Created in Primary Drain Tank Due to Large Vol of Water & Overhead Gas Compressor Inoperable,Causing Gaseous Leak in Auxiliary Bldg.Cause Not Stated1988-02-0808 February 1988 PNO-II-88-011:on 880206,slight Positive Pressure Created in Primary Drain Tank Due to Large Vol of Water & Overhead Gas Compressor Inoperable,Causing Gaseous Leak in Auxiliary Bldg.Cause Not Stated PNO-II-87-078, on 871126,licensee Removed Unit 1 from Svc to Repair Leaking Manway Cover on Secondary Side of C Steam Generator.Unit Cooled Down & Manway Gasket Replaced. Commonwealth of Virginia Informed1987-11-30030 November 1987 PNO-II-87-078:on 871126,licensee Removed Unit 1 from Svc to Repair Leaking Manway Cover on Secondary Side of C Steam Generator.Unit Cooled Down & Manway Gasket Replaced. Commonwealth of Virginia Informed PNO-II-87-061, on 870920,automatic Trip from 100% Power Occurred.Caused by Phase to Ground Fault in B Phase at Electrical Connection on B Reactor Coolant Pump.Safety Injection Signal Reset1987-09-21021 September 1987 PNO-II-87-061:on 870920,automatic Trip from 100% Power Occurred.Caused by Phase to Ground Fault in B Phase at Electrical Connection on B Reactor Coolant Pump.Safety Injection Signal Reset PNO-II-87-053A, on 870730,State of Ny,Dept of Environ Conservation & Dept of Radiation Health Completed Survey of Miscellaneous Boxes & Equipment W/Markings from VEPCO Found in Abandoned Bldg in Springwater,Ny.No Problems Noted1987-07-30030 July 1987 PNO-II-87-053A:on 870730,State of Ny,Dept of Environ Conservation & Dept of Radiation Health Completed Survey of Miscellaneous Boxes & Equipment W/Markings from VEPCO Found in Abandoned Bldg in Springwater,Ny.No Problems Noted PNO-II-87-053, on 870728,licensee Notified That Fireman Discovered Miscellaneous Boxes & Equipment in Abandoned Bldg Outside Springwater,Ny.Matl Might Be Clean Surplus Matl Disposed of After Cancellation of North Anna 31987-07-29029 July 1987 PNO-II-87-053:on 870728,licensee Notified That Fireman Discovered Miscellaneous Boxes & Equipment in Abandoned Bldg Outside Springwater,Ny.Matl Might Be Clean Surplus Matl Disposed of After Cancellation of North Anna 3 PNO-II-87-040, on 870623,unit Manually Shut Down Following Estimated 40 Gpm Leak in Rcs.Caused by Packing on Reactor Coolant Loop Stop Valve.Licensee Preparing Unit to Go to Mode 5 to Effect Repairs1987-06-23023 June 1987 PNO-II-87-040:on 870623,unit Manually Shut Down Following Estimated 40 Gpm Leak in Rcs.Caused by Packing on Reactor Coolant Loop Stop Valve.Licensee Preparing Unit to Go to Mode 5 to Effect Repairs IR 05000280/19870111987-06-22022 June 1987 Insp Repts 50-280/87-11 & 50-281/87-11 on 870427-0501.Three Potential Enforcement Findings Noted.Major Areas Inspected: Audit Performed in Feb 1987 by Util of Industrial Distributors PNO-II-87-037, on 870607,licensee Entered 24 H Limiting Condition for Operation When Outside Recirculation Spray Pump B Failed Periodic Surveillance Test Due to High Vibration & Low Discharge Pressure.Unit Shut Down1987-06-0909 June 1987 PNO-II-87-037:on 870607,licensee Entered 24 H Limiting Condition for Operation When Outside Recirculation Spray Pump B Failed Periodic Surveillance Test Due to High Vibration & Low Discharge Pressure.Unit Shut Down IR 05000280/19870091987-05-21021 May 1987 Insp Repts 50-280/87-09 & 50-281/87-09 on 870405-0502.No Violations Identified.Major Areas Inspected:Licensee Actions on Previous Enforcement Matters,Plant Operations,Maint & Surveillance & LER Review & 10CFR21 Reviews PNO-II-87-032, updates PNO-II-87-029.Util Determined That Partial Closure of Isolation Valve Which Brought About Reactor Scram on 870516 Caused by Shearing of Valve Stem Above Backseat.Metallurgist Evaluating Break1987-05-21021 May 1987 PNO-II-87-032:updates PNO-II-87-029.Util Determined That Partial Closure of Isolation Valve Which Brought About Reactor Scram on 870516 Caused by Shearing of Valve Stem Above Backseat.Metallurgist Evaluating Break PNO-II-87-029, on 870516,unit Tripped on Low Reactor Coolant Flow Rate in Loop A.Caused by Partial Closure of Hot Loop Isolation Valve.Outage of 12 Days Planned to Correct Problem.Resident Inspector Will Provide Followup1987-05-18018 May 1987 PNO-II-87-029:on 870516,unit Tripped on Low Reactor Coolant Flow Rate in Loop A.Caused by Partial Closure of Hot Loop Isolation Valve.Outage of 12 Days Planned to Correct Problem.Resident Inspector Will Provide Followup ML20209E1721987-03-30030 March 1987 Exam Rept 50-280/OL-87-01 Administered on 870209-11.Exam Results:Two Reactor Operators & Three Senior Reactor Operators Passed Exams.Written Exam & Answer Key Encl ML20205Q1481987-03-24024 March 1987 Notice of Violation from Insp on 870209-13 IR 05000280/19870031987-03-20020 March 1987 Insp Repts 50-280/87-03 & 50-281/87-03 on 870209-13. Violations Noted:Failure to Adhere to Radiation Control Procedures,To Comply W/Low Level Radwaste Disposal Facility Agreement State License Conditions & W/Dot Regulations IR 05000280/19870041987-03-0606 March 1987 Insp Repts 50-280/87-04 & 50-281/87-04 on 870201-28.No Violations or Deviations Noted.Major Areas Inspected:Plant Operations,Maint,Surveillance,Licensee Action on Previous Enforcement Matters & TMI Action Item Closeout ML20207T5821987-03-0202 March 1987 Notice of Violation from Insp on 861113-20 & 870209 IR 05000281/19860361987-02-23023 February 1987 Insp Rept 50-281/86-36 on 861113-20 & 870209.Violations Noted:Failure to Properly Valve Penetrations for Type a Test in Accordance w/10CFR50,App J.Four Unresolved Items Identified PNO-II-87-011A, on 870213,leak Discovered in Svc Water Line Below Floor of Unit 2 Turbine Bldg.Util Will Replace Defective Portion of Unit 2 Side of Svc Water Piping.Unit 1 Side of Same Sys Tested & Acceptable1987-02-18018 February 1987 PNO-II-87-011A:on 870213,leak Discovered in Svc Water Line Below Floor of Unit 2 Turbine Bldg.Util Will Replace Defective Portion of Unit 2 Side of Svc Water Piping.Unit 1 Side of Same Sys Tested & Acceptable IR 05000280/19870021987-02-18018 February 1987 Insp Repts 50-280/87-02 & 50-281/87-02 on 870202-06.No Violations or Deviations Noted.Major Areas Inspected:Exam Onsite in Area of Info Notices,Unplanned Radiological Releases,Effluent Monitors & Effluent Reporting IR 05000280/19860411987-02-12012 February 1987 Insp Repts 50-280/86-41 & 50-281/86-41 on 861207-870131.No Violations or Deviations Noted.Major Areas Inspected:Action on Previous Enforcement Matters,Plant Operations,Maint & Surveillance & IE Bulletin Followup PNO-II-87-011, heatup of Unit 1 Beginning in Preparation for Return to Svc.Restart of Unit 2 Scheduled 2 to 3 Wks Later.Licensee Informed of Region II Acceptance of Restart Plan in 870210 Augmented Insp Team Rept1987-02-12012 February 1987 PNO-II-87-011:heatup of Unit 1 Beginning in Preparation for Return to Svc.Restart of Unit 2 Scheduled 2 to 3 Wks Later.Licensee Informed of Region II Acceptance of Restart Plan in 870210 Augmented Insp Team Rept ML20211C5161987-02-10010 February 1987 Augmented Insp Repts 50-280/86-42 & 50-281/86-42 on 861209- 870114.Violation Noted:Failure to Fully Follow Procedures, Provide Adequate Instruction for & Document Performance of Maint Operations IR 05000280/19860421987-02-10010 February 1987 Augmented Insp Repts 50-280/86-42 & 50-281/86-42 on 861209- 870114.Violation Noted:Failure to Fully Follow Procedures, Provide Adequate Instruction for & Document Performance of Maint Operations ML20211C4781987-02-10010 February 1987 Notice of Violation from Insp on 861209-870114 IR 05000280/19870011987-02-0404 February 1987 Insp Repts 50-280/87-01 & 50-281/87-01 on 870112-15.No Violations or Deviations Noted.Major Areas Inspected:Fire Protection Sys Interaction Events Associated w/861209 Feedwater Pipe Rupture ML20212F9001987-01-0606 January 1987 Notice of Violation from Insp on 861020-23 & 27-31 IR 05000280/19860381986-12-29029 December 1986 Insp Repts 50-280/86-38 & 50-281/86-38 on 861102-1206.No Violations or Deviations Noted.Major Areas Inspected:Plant Operations,Maint & Surveillance,Outages,Followup on Region Identified Items & Insp of Dry Spent Nuclear Fuel Facility IR 05000280/19860401986-12-23023 December 1986 Insp Repts 50-280/86-40 & 50-281/86-40 on 861129-1203.No Violations or Deviations Noted.Major Areas inspected:post- Refueling Startup Tests,Thermal Power Determination & RCS Leakage Measurements PNO-II-86-091D, licensee Repts Two Addl Deaths Occurred as Result of Injuries from 861209 Accident.Caused by Break of 18-inch Feedwater Sys Suction Line Scalding Eight Workers W/Hot Water & Steam.Number of Dead Now Four1986-12-16016 December 1986 PNO-II-86-091D:licensee Repts Two Addl Deaths Occurred as Result of Injuries from 861209 Accident.Caused by Break of 18-inch Feedwater Sys Suction Line Scalding Eight Workers W/Hot Water & Steam.Number of Dead Now Four PNO-II-86-091C, ultrasonic Testing of Unit 1 Piping Elbow Disclosed Min Pipe Wall Thickness of 0.16 Inch.Design Specs Require 0.36 Inch Min Thickness.Ultrasonic Testing Continuing1986-12-15015 December 1986 PNO-II-86-091C:ultrasonic Testing of Unit 1 Piping Elbow Disclosed Min Pipe Wall Thickness of 0.16 Inch.Design Specs Require 0.36 Inch Min Thickness.Ultrasonic Testing Continuing 1999-09-08
[Table view] |
Inspection Report - Surry - 1991009 |
---|
|
|
Text
l'
. .
am 8800 UNITED STATES o,
y" $ NUCLEAR REGULATORY COMMISSION I lr REGION 18
\...../
A TLANTA, GEORGIA 30323 A?P i7 tsm Report Nos.: 50-280/91-09 and 50-281/91-09 .
!
Licensee:
Virginia Electric and Power Company Glen Allen, Va. 23060 Docket Nos.: 50-280 and 50-281 License Nos.: DPR-32, DPR-37 l
Facility Name: Surry 1 and 2 Inspection Conduc March 26 - 29, 1991 Inspectors: .
). L. LolTden
~~ y
~ " ~
/9/f/
Dste Signed '
CL 7 /
. B. SFortridge / _ _ _ _ _ _ -
_ _ _
Date Signed Accompeving persoon . ot r Approvei by:
J. S ( Potte'r,
~
ef h
' /Date Signed Facilities Radiation Protection Section Radiological Protection and Emergency Preparedness Branch Division of Radiation Safety and Safeguards SUMMARY
, Scope:
This routine, unannounced inspection was conducted in the area of occupational radiation exposure, and preoperational evaluation of external exposure control and facilities and equipment for the new radwaste facility. Specific areas examined included:
audits and appraisals, training and qualifications, external exposure control, control of radioactive materials and contamination, surveys
'
and monitoring, maintaining occupational exposures ALARA, and NRC Information Notice Results:
,
In the areas inspected no violations or deviations were identified. Based on interviews with licensee management, supervision, personnel from station departments, records review, and continued aggressive support of upper level and corporate management, the inspectors found the radiation protection program at Surry to be improving, and a station strengt Surry's problem self-identification strength and ALARA programs were continuing to perform as licensee 9610210069 910417 PDR ADOCK 0500 g 0
-- - - ._. - _ - . . - - -- - - . =
, ,
REPORT DETAILS Persons Contacted
,
Licensee Employees
- Benthall, Supervisor, Licensing
- Campbell, Supervisor, IRSP Planner
- W. Cook, Supervisor, Health Physics Operations ,
- D. Erickson, Superintendent, Radiation Protection
- B. Garber, Supervisor, Radiation Protection
- D. Hart, Supervisor, Quality Assurance
- J. Keithley, Shift Supervisor, Radiation Protection
- J. McCarthy, Superintendent, Operations
- Olin, Supervisor, Radiatica Protection, Decon Services
- J. Price, Assistant Station Manager
- Saunders, Assistant Vice President, Nuclear Operations
- T. Steed, Radiation Protection ALARA Coordinator
- R. Warnick, Health Physics Technician
- F. Wolking, Nuclear Operation Services
- K. Wyatt, Maintenance ALARA Coordinator Other licensee employees contacted during this inspection included craftsmen, engineers, operators, mechanics, and administrative personne Nuclear Regulatory Commission
- J. York, Resident Inspector
-
- Attended exit interview Occupational Exposure Organization and Management Controls
-
The inspectors reviewed changes made to the licensee's organization, staffing levels and lines of authority as they related to radiation protection, and verified that the changes had not adversely affected the licensee's ability to control radiation exposures or radioactivit The inspectors reviewed the licensee's program for self-identification of weaknesses related to the radiation protection program and the appropriateness of corrective actions taken. Radiological Problem Reports (RPRs), Personnel Contamination Events (PCEs), and Station Deviation Reports were reviewed by the inspectors. It was noted that thorough investigations to identify root causes, and data trending of the more significant events were being performe The~ inspectors reviewed the findings of a newly develop 1d evaluation program of the Radiation Protection Department conducted by Quality
- . - - _ . . - _ _ . _ .- .- . . . , - ... - .
. .
Assuranc The assessment consists of eight modules which are grouped to address various program area The eight areas include, contamination controls, radiation protection organization and
' 6cministration, external exposure control, internal radiation exposure,
' control of solid radioactive waste, work control, and instrumentation and equipmen ,
specific areas within Within each module are sub-modules which address '
the aforementioned general areas. An average
' rating is determined for each general area based on the results of each specific area finding. The numbers are then pooled to produce an everall rating for the program. The findings for each specific area ,
'
are then passed to the appropriate supervisor for corrective action I Within the report, no area received a rating below the acceptable level (rating 2.0). There were a number of specific area ratings that borderlined the acceptable / unsatisfactory level (rating 2.5),
inspectors discussed with the RP Superintendent the results of this evaluation and inquired about corrective actions for those areas rated as borderline or unsatisfactor Based on these discussions, inspectors determined that timely and appropriate corrective actions
, were being taken for the items of concern.
- Training and Qualifications 10 CFR 19.12 requires the licensee to instruct all individuals working or frequenting any portions of the restricted areas in the health protection aspects associated with exposure to radioactive material or radiation, in precautions or procedures to minimize exposure, and in the purpose and function of protection devices employed, applicable i provisions of the Commission Regulations, individual responsibilities and the availability of radiation exposure dat The inspectors reviewed changes in the licensee's training program, !
policies, and goals relating to the radiation protection program and discussed the changes with licensee representatives. The inspectors verified that the changes should not adversely affect the licensee's progra The inspectors discussed the Health Physics Technician Development 4 Program (HPTCP) with the program's lead instructor. The program currently has an enrollment of 14 individual The curriculum consists of seven steps, each step contains four to six modules which address the subject matter for the step. While performing self-study and tasks required for each module, the student is under the supervision of an experienced HP technician, who reports his progress to a representative from the training program. Completion of module in-plant tasks are performance tested under the supervision of a HPTDP instructor. For steps which focus on a specific RP program area (e.g. count room, dosimetry, ALARA, etc.), the student is assigned to that particular laboratory or office. A strong effort is made not to
. .
3 I l
interrupt the students progression through the program. Normally, the student is not assigned extraneous tasks or pulled off the program to provide support during outage l included in the seven step program. Four Systems Training modules are Each module addresses specific in-plant system areas and potential radiological hazards for each of the the HP Once the program is completed, the student is placed in received technician continuing training program. Positive comments frcm experienced technicians indicate that the program sufficiently perform providesdutie HP technician the students with all pertinent training to The inspectors August of 1990.reviewed the Group Training Mock-up which was completed in 1 The system is comprised of various valves, demineralizers, the plan and pumps which are identical to those encountered in A heat exchanger is also included in the system which can provide for desired flow rates and temperatures. The licensee has purchased radio-controlled radiaticn monitoring equipment to use with the mock-up to simulate radiological conditions- in the plant remotel Cognizant personnel stated that when the mock-up is used to simulate radiation work, the area is roped off, a step-off pad is placed in the area, and workers perform their tasks outfitted as per the RWP requirements associated with the jo HP coverage is also provided in the simulations to point out potential areas of radiological concer The primary purpose of the group training mock-up was to move advanced radiation worker training from in plant to the mock-up to reduce personnel exposur estimates fully quantified,Personnel but itstated that initial dose were not was apparent that the mock-up resulted in dose reduction to many jobs performed during the November 1990 outage, Planning and Preparation The inspectors reviewed the licensee's planning for the Unit 2 outage scheduled to begin March 30, 1991. The current planning system involves and planning, engineering, ALARA. maintenance, site services, operations, outage A work request must go through several reviews before it is placed on the outage planning schedule. Requests must undergo ALARA review for jobs in which the estimated collective dose exceeded 1 person-rem. The request must contain specific information detailing location of the job and anticipated repair times, to assist ALARA in determining what dose reduction efforts (shielding, dressout requirements) are necessary, External Exposure Control and Personnel Cosimetry Technical Specification 6.4.B requires the licensee to have written procedures prepared consistent with the requirements of 10 CFR Part 20
. . - - - - - -. - - -.- . - - _ _ _ _ _
. .
J 4
'
.
and they shall be approved, maintained, and adhered to for all operations involving personnel radiation exposur The
!
inspectors reviewed selected RWPs for appropriateness of the radiation protection requirements based on work scope, location, and conditions and found the RWPs to be thorough and complet CFR 20.202 requires each licensee to supply appropriate personnel
,
monitoring equipment to specific individuals and require the use of such equipment.
,
'
Ouring tours of the Auxiliary Building (AB), inspectors observed the use of digital alarming dosimeters (DADS). The licensee has instituted a self issuing system for DADS which has assisted in expediting dosimetry dosimete issuance and provides for computer tracking of each The licensee continues to set DAD alann points for specific radiation areas creating worker dose awareness and reducing dos e.
,
Internal Exposure Control (Whole Body Counting System)
'
The licensee has recently amended its procedure for calibration of their two whole body counters (ND standup counter and a chair counter.)
As detailed in a prior inspection (IR 90-25), the licensee did not perform annual calibrations of the whole body counting systems. Full calibrations were performed only in the event that the counters failed a QC test. Cognizant personnel stated that Procedure HP-5.2B.62 "Whole Body Counter Calibration Standup & Chair /ND9900," dated August 10, 1990, would be amended to include a statement concerning the annual calibration of the whole body counting systems. The re stipulations will remain the same for QC test failures,quirements however and the whole body counters will now be regularly calibrated on an annual basi As the inspectors were preparing to exit the site, it was observed that the control quality whole body counters could not be calibrated to meet procedural limit Further investigation by the licensee into the problem revealed the background count rates were significantly elevated throughout the entire gansna ray energy spectrum. The licensee indicated that the problem a inversion layers in the area. ppeared These to be due layers toto tend meteorological
" trap" terrestrial radiation for a short time period, therefore, increasing the observed background counting rates. The dosimetry technician requested the inspectors to provide samples for urinalysis. The collection of urinalysis samples is currently a non-proceduralized contingency in the event the whole body countino sys ums are inoperable. Discussions with licensee management indicated that this backup plan would be formally added to the whole body counting procedures. There were no positive results indicated by the urinalysi . .
!
! Surveys. Monitoring, and Control of Radioactive Material and Contamination
10 CFR 20.201(b requires each licensee to make or cause to be made such surveys as)(1) may be necessary for the licensee to the regulations and (2) are reasonable under the circumstances to evaluate the extent of radioactive hazards that may be presen The inspectors reviewed the plant procedures which established the licensee's radiological survey and monitoring program and verified that the procedures were consistent with regulations, Technical Specifications, and good health physics practice Inspectors reviewed the licensee's shift log of regular surveys performed on a daily, weekly, monthly, and quarterly basis. All ;
'
surveys were documented as being performed in the required time fram A selected group of surveys were reviewed for proper documentation and supervisory review as required by procedures. All surveys reviewed were in order and had been reviewed by appropriate supervisors in a timely manne Inspectors discussed the contamination control program with licensee representative the 89,500 squareDecontamination feet of the RCA continues with 11,495 of contaminated at the end of 1990. Licensee representatives stated that areas of the auxiliary building. plans are in place to continue reclaiming Inspectors reviewed the Leak and ,
Contaminated Area Tracking Update Report (LACAT) for 1991. This report lists the areas in need of deconning, collective dose estimates to decon, and the daily maintenance dose expenditure for the areas while contaminate It also outlines priority areas for reclamatio The licensee plans to reclaim approximately 3,000 square feet of contaminated area in 199 Program for Maintaining Exposures As Low As Reasonably Achievable (ALARA)
10 CFR 20.1(c) states that persons engaged in activities under licenses issued by the NRC should make every reasonable effort to maintain radiation exposures a low as reasonably achievable. The recomended elements of an ALARA program are contained in Regulatory Guide 8.8, Information Relevant to Ensuring that Occupational Radiation Exposure at Nuclear Power Stations will be ALARA, and Regulatory Guide 8.10, Operating Philosophy for Maintaining Occupational Radiation Exposures ALAR The licensee's ALARA program continues to be an aggressive element within the radiation protection progra The inspectors noted the continued involvement of corporate management with ALARA through the implementation of the station's Five Year Dose Reduction Plan and funding support described in the 1991 Business Pla _
. -. -.
. .
The licensee's ALARA program has continued to implement new dose reduction techniques which include; telemetry for dose meters, staggering of dose allotments for workers on a particular job depending on the radiation field in the exact area the worker will be performing the task, ALARA responsibility being passed to other departments (Operations and Maintenance and others) via the respective departmental ALARA coordinators, and ALARA training incorporated in routine quarterly training of maintenance and site services personne Continued usage of the Videodisc Information Management System (VIMS)
has also contributed to further operational dose reductio The ALARA Coordinator has recently enhanced the VIMS to include component mark numbers and indicate low dose waiting areas. The use of the system is expanding and maintenance has identified the need for two VIMS within their departmen Inspectors attended the monthly ALARA Comittee meeting on March 28, 1991, which reviewed recent ALARA suggestions and RWPs for higher dose jobs during the upcoming Unit 2 outage. The comittee is comprised of the respective departmental ALARA coordinators, an assistant plant manager, supervisors from various HP sections, and the HP Superintenden The ALARA suggestions were determirs i to be substantive and addressed specific dose problems which provided for changes that would reduce dose through physical changes or procedural technique Items approved while the inspectors were in attendance j included:
Color coding of resin discharge piping to avoid confusion during pre and post surveys to reduce time in the are *
Provision for a low dose work area in the radiologically controlled areas (RCAs) to allow workers to bring valves and other components
out of a high dose area while performing repairs and calibrations before installatio Install remote radiation monitors on skimmer filter housings with readout in a low dose area to inform HP technicians of increase in filter dose rate *
Purchase of peristaltic pumps that use tygon tubing to replace steel pumps for draining liquid waste. The tubing pump would not become contaminated as would the steel pump thus minimizing radwaste and spreadable contaminatio During the RWP portion of the meeting, inspectors noted that the committee thoroughly briefed the foreman for each particular job and emphasized the radiological hazards and pointed out any relevant dose reduction techniques. The committee responded to concerns about the jobs expressed by the foremen. Of particular note was a suggestion made by an ironwork foreman who stated that he felt doses for his portion of a job could be reduced if filters were changed prior to his entry into the are Although the dose reduction for this effort was
._ - _ . _ _ _ __.- . - ._ -- ._. . _ - . . _ . -.
. . .
,
' not quantified, it illustrated the effectiveness of the ALARA program
< developing individual worker awareness of dose reductio No violations or deviations were identified.
~ Facilities and Equipment, Preoperational (83527) and External Occupational l Exposure Control and Personal Dosimetry, Preoperational (83524) '
The inspectors toured and reviewed the licensee's new on-site radwaste !
)'
facility. The facility has just entered component level and pre-op testing l mode with hot testing to begin in June 1991. Several design features were reviewed in the facility for exposure reduction control Among those items noted were:
Repair and maintenance areas for components. The facility is designed
!
with areas to remove pumps and other components from a high l dose / contaminated areas to allow for maintenance in lower dose or clean area t The overall piping design has eliminated sharp angles, low spots, and
,
,
backflow areas, thus reducing crud traps and potential hot spot area l Personnel exposure control is suppcrted by new protective clothing change rooms and shower Personnel contamination and tool monitors were purchased to be used at RCA access points. Emergency showers are also located in the decon room and the new chemistry laborator A shielded room is located off the loading area to accomodate surveys before shipment and upon receipt of materia The licensee purchased specialized pumps for many of the systems which would become highly contaminated. These pumps assist dose reduction by ,
l the use of inherent ALARA design features. Breakdown and refitting can be accomplished in about one-third the time required for standard pumps as the pumps are mounted on a bed that can be rotated to facilitate maintenanc Usually only four wrenches are required for total disassembly. Over time for dose intense maintenance, this advantage could lead to significant dose savings at the facilit The inspectors determined all systems reviewed met requirements of modules 83527 and 8352 No violations or deviations were identifie . InformationNotices(92701)
The inspector determined that the following Information Notices (ins) had been received by the licensee, reviewed for applicability, distributed to appropriate personnel, and that action, as appropriate was taken or scheduled:
)
c . . .
IN 88-63 Supplement 1 High Radiation Hazards from Irradiated Incore Detectors and Cables IN 90-08 Kr-85 Hazards From Decayed Fuel IN 90-09 Extended Interim Storage of Low-Level Radioactive Waste By Fuel Cycle and Materials Licensees IN 90-44 Dose Rate Instrurrents Underresponding to True Radiation Fields IN 90-47 Unplanned Radiation Exposures to Personnel Extremities Due to Improper Handling of Potentially Highly Radioactive Sources IN 90-48 Enforcement Policy for Hot Particle Exposures '
IN 90-49 Stress Corrosion Cracking in PWR Steam Generator Tubes IN 90-50 Minimization of Methane Gas in Plant Systems and Radwaste Shipping Containers IN 90-56 Inadvertent Shipment of a Radioactive Source in a Container Thought to be Empty l IN 90-66 Incomplete Draining and Drying of Shipping Casks i
IN 90-82 Requirements for Use of NRC Approved Transport Packages for Shipment of Type A Quantities of Radioactive Material IN 91-10 .Sumary of Semiannual Program Performance Reports on
Fitness-for-Duty (FFD) in the Nuclear Industry j 5. Exit Meeting The inspectors met with licensee representatives (denoted in Paragraph 1)
at the conclusion of the inspection on March 28, 1991. The inspectors summarized the scope of their findings, and stated that the licensee's self-identification and ALARA program continued to perform as program stren9ths. The licensee did not identify any documents or processes as proprietary. Dissenting coments were not received from the license I l