IR 05000261/1988032

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-261/88-32
ML14191B078
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 02/13/1989
From: Ernst M
NRC Office of Inspection & Enforcement (IE Region II)
To: Utley E
Carolina Power & Light Co
References
NUDOCS 8902230015
Download: ML14191B078 (2)


Text

ACCELERATED DISTRIBUTION DEMONSTRATION SYSWTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

CESSION NBR:8902230015 DOC.DATE: 89/02/13 NOTARIZED: NO DOCKET #

ACIL:50-261 H.B. Robinson Plant, Unit 2, Carolina Power & Light C 05000261 AUTH.NAME AUTHOR AFFILIATION ERNST, Region 2, Ofc of the Director RECIP.NAME RECIPIENT AFFILIATION UTLEY, Carolina Power & Light C SUBJECT: Ack receipt of 890203 ltr informing NRC of steps taken to correct violations noted in Insp 50-261/88-3 DISTRIBUTION CODE: IEO4D COPIES RECEIVED:LTR _

ENCL SIZE:_

_

TITLE: Safeguards Inspection Rpt/NOV Response (50 DKT)-Publicly Available NOTES:

S RECIPIENT COPIES RECIPIENT COPIES

/

ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR E CL PD2-1 LA

PD2-1 PD

A LO,R

D INTERNAL: AEOD/DOA

NRR/DRIS/SGB 9D

NRR/DRIS/SIB 9A

NRR PMAS/ILRB12

(D NUDOCS-ABSTRACT

.

G-TT

1 RGN2 FILE

1

S EXTERNAL:

LPDR

NRC PDR

NSIC

R (II)

D S

D D

NOTE TO ALL "RIDS" RECIPIENIS:

S PLEASE HELP US To REDUCE WAST!

ODN THE DOCUMENT CONTR)L DESK, ROCM P1-37 (EX )

O ELIDMTE YOUR NAME FR DISTRIBIUN LISTS POR DOCUMENS YOU DCN'T NEE!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR

ENCL

.14-

FEE I Carolina Power and Light Company ATTN:

Mr. E. E. Utley Senior Executive Vice President Power Supply and Engineering and Construction P. 0. Box 1551 Raleigh, NC 27602 Gentlemen:

SUBJECT:

REPORT NO. 50-261/88-32 Thank you for your response of February 3, 1989, to our Notice of Violation issued on January 6, 1989, concerning activities conducted at your H. Robinson facilit We have evaluated your response and found that it meets the requirements of 10 CFR 2.20 We will examine the implementation of your corrective actions during future inspection We appreciate your cooperation in this matte

Sincerely, Malcolm L. Ernst Acting Regional Administrator cc:

C. R. Dietz, Manager Robinson Nuclear Project Department R. E. Morgan, Plant General Manager State of South Carolina bcc:

NRR/DRIS/SB Document Control Desk (RIDS IE04), 016 NRC Resident Inspector RII

,

eIR RII R

RIIW Jni s:jc muire WCline HDance DVerrelli LReyes 02/\\1/89 02/()/89 02//3/89 02/b /89 02/k)/89 02/15/89 RI RII RI GJe ins JStohr DCollins 02//3/89 02/

/89 2/3/89

9

,2R gc) "

,: 9 c)()~2 12/

3 8 PDR Aaoc-05000261 DF'DC: