IR 05000261/1988007

From kanterella
Jump to navigation Jump to search
Ack Receipt of Revised Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-261/88-07
ML14191A983
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 08/23/1988
From: Verrelli D
NRC/RGN-II, NRC/IE
To: Utley E
Carolina Power & Light Co
References
NUDOCS 8809070015
Download: ML14191A983 (2)


Text

ACCELERATED DISTRIBUTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

CESSION NBR:8809070015 DOC.DATE: 88/08/23 NOTARIZED: NO DOCKET #

W,FACIL:50-261 H.B. Robinson Plant, Unit 2, Carolina Power & Light C 05000261 AUTH.NAME AUTHOR AFFILIATION VERRELLI, Region 2, Ofc of the Director RECIP.NAME RECIPIENT AFFILIATION UTLEY, Carolina Power & Light C SUBJECT: Ack receipt of 880812 ltr informing NRC of steps taken to correct violations noted in Insp Rept 50-261/88-0 R DISTRIBUTION CODE: IE01D COPIES RECEIVED:LTR _ ENCL 0 SIZE:

TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES:

RECIPIENT COPIES RECIPIENT COPIES S

ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 PD

LO,R

/

INTERNAL: AEOD

DEDRO

A NRR MORISSEAU,D

NRR/DLPQ/PEB 11

NRR/DLPQ/QAB 10

NRR/DOEA DIR 11

D NRR/DREP/EPB 10

NRR/DREP/RPB 10

NRR/DRIS DIR 9A

NRR/PMAS/ILRB12

NUDOCS-ABSTRACT

OE LIEBERMAN,J

OGC/HDS1

G L

E

1 s

RES/DSIR DEPY

RGN2 FILE

1 TERNAL: LPDR

NRC PDR

U NSIC1 A

D D

S A

D D

TOTAL NUMBER OF COPIES REQUIRED: LTTR

ENCL 3'

Carolina Power and Light Company ATTN:

Mr. E. E. Utley Senior Executive Vice President Power Supply and Engineering and Construction P. 0. Box 1551 Raleigh, NC 27602 Gentlemen:

SUBJECT:

REPORT NO. 50-261/88-07 Thank you for your revised response of August 12, 1988, to our Notice of Violation issued on May 25, 1988, concerning activities conducted at your H. B. Robinson facilit We have evaluated your response and found that it meets the requirements of 10 CFR 2.20 We will examine the implementation of your corrective actions during future inspection We appreciate your cooperation in this matte

Sincerely, David M. Verrelli, Chief Reactor Projects Branch 1 Division of Reactor Projects cc:

C. R. Dietz, Manager Robinson Nuclear Project Department R. E. Morgan, Plant General Manager bcc: NRC Resident Inspector DRS, Technical Assistant Document Control Desk State of South Carolina RII RH R

.l P rdfikon 08/ /88 08/9/88 3809070015 8S0S23 PDR ADOCK 05000261 Q

FPDC