IR 05000261/1988010

From kanterella
Jump to navigation Jump to search
Ack Receipt of 880915 & 0131 Supplemental Responses Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-261/88-10
ML14191B086
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 02/22/1989
From: Verrelli D
NRC Office of Inspection & Enforcement (IE Region II)
To: Utley E
Carolina Power & Light Co
References
NUDOCS 8903090080
Download: ML14191B086 (2)


Text

ACCELERATED DISTIBUTION DEMONSTRATION SYSETM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSIONNBR:8903090080 DOC.DATE: 89/02/22 NOTARIZED: NO DOCKET #

CACIL:50-261 H.B. Robinson Plant, Unit 2, Carolina Power & Light C 05000261 UTH.NAME AUTHOR AFFILIATION RRELLI, Region 2, Ofc of the Director RECIP.NAME RECIPIENT AFFILIATION UTLEY, Carolina Power & Light C SUBJECT: Ack receipt of 880915 & 0131 ltrs informing NRC of steps taken to correct violations noted in Insp Rept 50-261/88-1 I DISTRIBUTION CODE: IE01D COPIES RECEIVED:LTR I ENCL __

SIZE:

TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 PD

LO,R A

INTERNAL: AEOD

AEOD/DEIIB

DEDRO

NRR SHANKMAN,S

NRR/DEST DIR

NRR/DLPQ/PEB 11

NRR/DLPQ/QAB 10

NRR/DOEA DIR 11

NRR/DREP/EPB 10

NRR/DREP/RPB 10

NRR/DRIS DIR 9A

NRR/PMAS/ILRB12

NUDOCS-ABSTRACT

N,J

OGC/HDS1

REG

1 RGN2 FILE

1 EXTERNAL: LPDR

NRC PDR

NSIC

R I

D S

A D

D NOrE TO ALL "RIDS" RECIPIES:

S PLEASE HELP US M0 REDU WSTE!

00TrACT THE DoC.MENT CoNTROL DESK, ROM P1-37 (EXT. 20079) T0 ELIMIN YOUR NaM FR0 DISTRIBUIN LIST FOR DOCUMENTS YOU DON'T NEEDI TOTAL NUMBER OF COPIES REOUIRED: LTTR

ENCL

FES 2 2 1989 Carolina Power and Light Company ATTN:

Mr. E. E. Utley Senior Executive Vice President Power Supply and Engineering and Construction P. 0. Box 1551 Raleigh, NC 27602 Gentlemen:

SUBJECT: NRC INSPECTION REPORT NO. 50-261/88-10 Thank you for your supplemental responses of September 15, 1988 and January 31, 1989, to our Notice of Violation issued on June 23, 1988, concerning activities conducted at your H. B. Robinson facilit We have evaluated your responses and found that they meet the requirements of 10 CFR 2.201. We will examine the implementation of your corrective actions during future inspection We appreciate your cooperation in this matte

Sincerely, David M. Verrelli, Chief Reactor Projects Branch 1 Division of Reactor Projects cc: C. R. Dietz, Manager Robinson Nuclear Project Department R. E. Morgan, Plant General Manager State of South Carolina bcc:

NRC Resident Inspector DRS Technical Assistant Document Control Desk 8903090080 890222

PDR ADOCK 05000261 PNU

RI RII4 R

1a~

l: s er H )

/89 024 t/89