IR 05000261/1988028
| ML14191B067 | |
| Person / Time | |
|---|---|
| Site: | Robinson |
| Issue date: | 01/11/1989 |
| From: | Verrelli D NRC Office of Inspection & Enforcement (IE Region II) |
| To: | Utley E Carolina Power & Light Co |
| References | |
| NUDOCS 8901300038 | |
| Download: ML14191B067 (2) | |
Text
ACCELERATED DsMtBUTION DEMONSTRATION SYS7IEM REGULATORY INFORIATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:8901300038 DOC.DATE: 89/01/11 NOTARIZED: NO DOCKET #
FACIL:50-261 H.B. Robinson Plant, Unit 2, Carolina Power & Light C 05000261
,UTH.NAME AUTHOR AFFILIATION RRELLI, Region 2, Ofc of the Director W
IECIP.NAME RECIPIENT AFFILIATION UTLEY, Carolina Power & Light C SUBJECT: Ack receipt of 881209 ltr informing NRC of steps taken to correct violations noted in Insp Rept 50-261/88-2 DISTRIBUTION CODE: IE01D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES:
RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 PD
LO,R
A INTERNAL: AEOD
AEOD/DEIIB
r DEDRO
NRR SHANKMAN,S
NRR/DEST DIR
NRR/DLPQ/PEB 11
L NRR/DLPQ/QAB 10
NRR/DOEA DIR 11
NRR/DREP/EPB 10
NRR/DREP/RPB 10
S NRR/DRIS DIR 9A
NRR/PMAS/ILRB12
NUDOCS-ABSTRACT
OE LLEBERMAN,J
OGC/HDS1
G FIL
1 RGN2 FILE
1 V
ERNAL: LPDR
NRC PDR
RESL MARTIN,D
R D
S NorE 'IO ALL "RIDS" RECIPIENTS:
S PLEASE EM US TO RDUCB WASE!
ONIACr THE DOCUMEr ODNTROL DESK, ROC4 P1-37 (EXT. 20079) 1 ELIMTE Y0UR NM FIU4 DIS1RMIICN LISTS FOR DOCUMENIS Y00 DON'T NEEDI TOTAL NUMBER OF COPIES REQUIRED: LTTR
ENCL 2A'
JAIN 11i Carolina Power and Light Compan ATTN:
Mr. E. E. Utley Senior Executive Vice President Power Supply and Engineering and Construction P.O. Box 1551 Raleigh, North Carolina 27602 Gentlemen:
SUBJECT:
REPORT NO. 50-261/88-28 Thank you for your response of December 9, 1988, to our Notice of Violation, issued on November 10, 1988 concerning activities conducted at your H.B. Robinson facilit We have evaluated your response and found that it meets the requirements of 10 CFR 2.201. We will examine the implementation of your corrective actions during future inspection We appreciate your cooperation in this matte
Sincerely, David M. errelli, Chief Reactor Projects Branch 1 Division of Reactor Projects cc:
C. R. Dietz, Manager Robinson Nuclear Project Department
.4. E. Morgan, Plant General Manager State of South Carolina bcc:
-RC Resident Inspector DRS Technical Assistant Document Control Desk RI RI RII Rar 011:e PFredcson CHosey DVerelli 01/4 /89 01/( /89 01/-L/89 01/il /89 13901300038 390111 PDR ADCK05000261 0D DC PNU