Text
Ro
UNITED STATES NUCLEAR REGULATORY COMMISSION
REGION II
101 MARIETTA ST., N.W., SUITE 3100 ATLANTA, GEORGIA 30303 Report No. 50-261/80-37 Licensee: Carolina Power and Light Company 411 Fayetteville Street Raleigh, NC 27602 Facility Name:
H. B. Robinson Docket N License N DPR-23 Inspection at H. B. Robinson site near Hartsville, South Carolina Inspector
>'-
-
0/
E. H. Brooks Date Signed Approved by
_
_
_
_
_
_
D. R. Quilck, Section Chief Date Signed RONS Branch SUMMARY Inspection on December 8-12, 1980 Areas Inspected This routine, announced inspection involved 32 inspector-hours on site in the areas of witnessing general plant operations and followup inspection of out standing item Results Of the areas inspected, no violations or deviations were identifie S 2 c O
DETAILS Persons Contacted Licensee Employees
- R. B. Starkey, General Manager
- F. L. Lowery, Operations Supervisor
- C. W. Crawford, Manager 0 & M
- C. A. Bethea, Training Supervisor
- R. S. Allen, Training Specialist D. Baur, Quality Assurance Specialist M. Paige, Senior Engineer Other licensee employees contacted included shift supervisors, reactor operators and health physics personne Other Organizations
- J. Buzy, NRC Operator Licensing Branch NRC Resident Inspector
- E. H. Brooks, Acting Resident Inspector
- Attended exit interview Exit Interview The inspection scope and findings were summarized on December 12, 1980 with those persons indicated in paragraph 1 abov The inspection activities presented in these details were discusse.
Licensee Action on Previous Inspection Findings (Closed)
Unresolved item 261/80-22-01:
Drawing control program not effectively administere The licensee has revised the plant operating manual as follows:
Volume 1 -
Administrative Instruction Sections 2 and 9 - Plant Drawing Program (Revision)
Volume 20 -
Engineering Procedures - Preparation Revising and Reproduction of Plant Drawings (new procedure)
Volume 21 -
Administrative Procedures Part II Document control DC-Control and Distribution of Plant Drawing (new procedures)
These revisions/procedures were approved 11-28-8 The inspector reviewed the revisions/procedures and confirmed by discussions with personnel that implementation of the drawing control program as revised is being accom plishe.
Unresolved Items Unresolved items were not identified during this inspectio. Areas Inspected In the period December 8 to December 12, 1980 the inspector acted in the capacity of NRC Resident Inspecto The inspector witnessed preparations for plant startup from a refueling outage followed by startup to 81% reactor power which was reached on December 12, 198 The inspector performed daily observations of control room activity, discussed startup procedures with shift supervisors, reviewed supervisor logs and made twice daily tours of the auxiliary building, turbine building and general site area The inspector witnessed loading of radioactive. waste from the auxiliary building for transport to Barnwell, South Carolina, and witnessed radiation measure ments made by licensee health physics personne Measurements indicated radioactivity levels less than 40 mr below the bed of the truck and less than 2 mr between the truck bed and the truck ca M J. Buzy of NRR Operator Licensing Branch conducted operator requalifi cation testing during this period, and discussed the operator training program with those present at the exit interview.